Site 09401060 - Alaska Highway - Muncho Lake Maintenance Camp
-
Status
Remedial action plan completed. Remediation / risk management underway. -
Site Status
Active -
Classification
Medium Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
Contractual obligation -
Property Type
Non-Federal (Provincial Government)
Site Location
-
Latitude, Longitude
58.9274, -125.77311 -
Municipality
Northern Rockies, BC -
Federal Electoral District
Prince George--Peace River--Northern Rockies
Site Management Strategy
- Remediation
Contaminant Details
Contamination Estimate
-
Cubic Meters
92,560
The following contaminated media may exist on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Groundwater |
PHCs (petroleum hydrocarbons) | Surface soil |
PHCs (petroleum hydrocarbons) | Soil |
PHCs (petroleum hydrocarbons) | Air |
PHCs (petroleum hydrocarbons) | Other medium |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Groundwater |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Surface soil |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Soil |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Air |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Other medium |
PAHs (polycyclic aromatic hydrocarbon) | Groundwater |
PAHs (polycyclic aromatic hydrocarbon) | Surface soil |
PAHs (polycyclic aromatic hydrocarbon) | Soil |
PAHs (polycyclic aromatic hydrocarbon) | Air |
PAHs (polycyclic aromatic hydrocarbon) | Other medium |
Other inorganics | Groundwater |
Other inorganics | Surface soil |
Other inorganics | Soil |
Other inorganics | Air |
Other inorganics | Other medium |
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) | Groundwater |
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) | Surface soil |
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) | Soil |
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) | Air |
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) | Other medium |
Action Plan
Implement the RAP/RMP (excavation and on-site, ex-situ treatment of contaminated soil combined with risk assessment). Following risk assessment, performance verification and monitoring will occur.Implement the RAP/RMP (excavation and on-site, ex-situ treatment of contaminated soil combined with risk assessment). Following risk assessment, performance verification and monitoring will occur.
Additional Information
Lot 1552 of the Peace River District, excluding Block 1 thereof. In addition to the contaminants of concern, buried metallic debris has been identified at the site.
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 0 |
5 km | 0 |
10 km | 0 |
25 km | 0 |
50 km | 0 |