Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (descending) |
Sites Found: | 117 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
N0271001
Cap-de-Bon-Désir Lightstation |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56522003
G-I-03 |
Long term monitoring completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
56522002
G-I-02 |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56522001
G-I-01 |
Long term monitoring completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
56455003
Former Lighthouse and other buildings at Île-aux-Perroquets |
Remediation / risk management completed. No further action required. | 2013-2014 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56455002
Petite-Île-au-Marteau Lighthouse |
Initial testing completed. No further action required. | 2013-2014 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56454001
St-Mathieu Compound |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
55380001
Old Port of Montreal - Confinement Cell |
Remediation / risk management completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959091
Site 02.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959090
Site 16.1 Peel Basin |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06959089
Site 15.7 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959088
Site 15.6 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06959086
Site 15.2 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959085
Site 14.4 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959084
Site 14.3 |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959082
Site 13.7 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959081
Site 13.2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959080
Site 13.11 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959079
Site 13.1.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959078
Site 13.1.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959077
Site 13.1.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959076
Site 13.10 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959075
Site 11.7 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959074
Site 11.6 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959073
Site 11.5 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959072
Site 11.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959071
Site 10.6 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959070
Site 10.5 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959069
Site 10.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959068
Site 10.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959067
Site 10.1 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959066
Site 09.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959065
Site 09.3.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959064
Site 09.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959063
Site 09.1 (North deposit site) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959062
Site 08.6 (north deposit site) |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959061
Site 08.5 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959060
Site 8.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959059
Site 08.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959058
Site 08.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959057
Site 07.3 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959056
Site 07.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959055
Site 07.1 (north deposit site) |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959054
Site 06.2 |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959053
Site 06.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959052
Site 05.4 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
06959051
Site 05.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959050
Site 05.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959049
Site 04.7 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959048
Site 04.6 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959047
Site 04.5 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
06959046
Site 04.2.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959045
Site 03.5 |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959044
Site 03.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959043
Site 03.2.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959042
Site 03.2.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959040
Site 02.2.0 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959038
Site 02.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959037
Site 01.3 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959036
Site 01.2 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959035
Site 01.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959034
Site 13.5 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959033
Site 11.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959032
Site 09.3.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959031
Site 09.3.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959030
Site 08.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959029
Site 04.4 |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959028
Site 04.3 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06959027
Site 04.2.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959026
Site 04.2.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959025
Site 04.1.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959024
Site 04.1.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959023
Site 04.1.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959022
Site 03.4 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959021
Site 03.2.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959020
Site 03.2.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959019
Site 03.1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
06959018
Site 15.5 |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 05 Detailed Testing Program |
06959017
Site 15.4 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959015
Site 15.1 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
06959014
Site 14.7 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959013
Site 14.2 |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
06959012
Site 14.1.1 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959011
Site 13.9 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959010
Site 13.8 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
06959009
Site 13.6 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959008
Site 13.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959007
Site 13.3 |
Confirmatory sampling completed. No further action required. | 2020-2021 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959006
Site 12.2 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959005
Site 11.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959004
Site 11.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959003
Site 10.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959001
Canal sediments |
Detailed testing completed. No further action required. | 2014-2015 | 1 High Priority for Action | 05 Detailed Testing Program |
06688001
Wharf area |
Confirmatory sampling completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05828001
Cartier-Brebeuf Western Sector |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00027618
Cap-des-Rosiers Harbour South Jetty |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025805
South side of Chambly canal: lock 1 to railroad bridge |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025788
Chambly Canal little Lake at Saint-Jean-sur-Richelieu (residential sector) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025787
Grande-Grave Harbour Land |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025786
Cap-des-Rosiers Harbour Parking and Land |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024676
Harbour of Cap-des-Rosiers |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024594
Rivière à la Pêche garage |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024592
Edouard Lake Storage Tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024591
Wapizagonke-North camping storage tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024590
Waber Lake Forest Camp |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024589
Coude Lake Forest Camp |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00024588
Wabenaki refuge generator and former storage tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024587
Ile des Cinq Point |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024586
Lac-à-la-Pêche Sawmill |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00024305
Dufferin Terrace |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023610
Fort No. 1, Lévis Forts National Historic Site |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023479
Garage of the thermal power plant |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023467
Oil trap, operational centre's garage at Forillon National Park |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023390
Cartier-Brebeuf North-Eastern Sector |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023389
Cartier-Brebeuf Eastern Sector |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00023376
Site 1.2.1 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023293
Site 9.1.1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
- Version:
- 40