Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
81209001
Wood Islands Light (Metals in Soil) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
81199001
Wrights Range Rear - Metal impacted soil around light |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
81104001
Malpeque Outer Range Rear (Metals Impacts) |
Remediation / risk management completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
81103001
Malpeque Outer Range Front (Metals Impacts) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 05 Detailed Testing Program | |
81088001
Leards Range Rear - Metals in Soil near light structure |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
81058001
Georgetown Range Rear (Metal Impacted Soil, Potential Hydrocarbon Impacts) |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56031001
West Point (Divested)(Metal Impacted Soil near Lightstation) |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
26714001
New London Range Rear (Metal Impacts in Soil by Rear Range Light LL#1060) |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
22430002
GEORGETOWN - FISHERMEN'S WHARF ((PAH, PCB & Metal Impacts in Waterlot Sediment) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
22426001
NINE MILE CREEK - Metals & Hydrocarbons in soil |
Remediation / risk management completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07199001
Jean Canfield Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02259001
North Cape - Metal/Hydrocarbons in Soil |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02210001
Cape Egmont - Metals & Hydrocarbons in Soil |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02209001
ABRAMS VILLAGE (groundwater Closed) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02170001
Seacow Head & North Point East - Metal Impacted Soil-Current & Fmr. Light Locations |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02134001
Harrington Storage Facility - Copper and zinc in soil near buildings and tower |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
02087003
Green Gables |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
02087002
Dalvay Compound - Chemical Storage Building |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02085001
Cape Tryon - Metals in soil near current & former lightstation |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
02075001
Leards Range Front & Palmers Rear Range - Metal Impacted Soil |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02072001
Blockhouse Point - TPH/Metals in Soil |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02071001
Warren Cove Range Rear - Metal and Mercury Impacted Soil |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02070001
Warren Cove Range Front - Metal impacted soil |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02054002
Coast Guard Base |
Remediation / risk management completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02054001
Coast Guard Base |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02033001
Dominion Building |
Detailed testing completed. No further action required. | 2007-2008 | 3 Low Priority for Action | 05 Detailed Testing Program |
02007001
Prim Point (P.E.I.) (Metal impacts in soil near Lightstation) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
01986001
East Point - Metal Impacted Soil Across Property |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
01981002
RED HEAD - Soil/GW Impacts- USTs/Fuel Dispenser |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01976001
Souris East (Metal Impacts in Soil) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
01970002
BAY FORTUNE (Copper in soil near bait sheds and south wharf) |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
01963002
ANNANDALE (Metals and PAHs in Waterlot sediments) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
01958002
LAUNCHING POND - Metals/Hydrocarbons-Soil; Metals/PAH's-Groundwater |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
01958001
LAUNCHING POND - PAHs and metals in Waterlot sediments |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
01955001
Sediment POD |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01940001
Georgetown Range Front (Metals and Potential Hydrocarbons in Soil) |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
01936001
Panmure Head - Metals, Hydrocarbons in Soil |
Initial testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
01930001
MURRAY RIVER (Lead, copper, and PAHs in Waterlot sediments) |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
01923001
Cape Bear - Metals Impacts in Soil near Lightstation |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00217001
Seacow Head & North Point East |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027851
Winter River near Suffolk |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026383
147-C01 - Addiction Research Centre APEC's |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00025154
Alma Communications Tower |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025144
Old Summerside EOD Range, PEI |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00018013
STANLEY BRIDGE (No Sediment Impacts) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00018012
STANLEY BRIDGE (No Impacted Soils near Shoreline) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018009
SOUTH RIVER (MURRAY HARBOUR) (PAH and Metals in Sediment) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018006
SKINNERS POND (No Soil Impacts- Dredge Spoil Disp. Area) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018004
SKINNERS POND (No Soil Impacts- Burn Area) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018003
SEACOW POND (PAHs/Arsenic in soil) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018000
RED HEAD - No Impacts- Dredge Spoil Disposal Area |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017997
NORTH LAKE (No Impacted Soil- Dredge Spoils/Creosote Timbers) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017995
NORTH LAKE (No Sediment Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017993
NEW LONDON (No Sediment Impacts) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017992
NAUFRAGE (No Land-Based Issues) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017991
MONTAGUE (Sediment Impacts) |
Confirmatory sampling completed. No further action required. | 2021-2022 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00017987
MILLIGANS SHORE - Sediment impact (historic activities) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00017986
MILLIGANS SHORE - No Groundwater Impacts- Former UST |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017985
MCAULEY'S SHORE (PINETTE RIVER) - Arsenic in Sediment, PAH in Soil |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017984
MACHONS POINT - BTEX (ethyl benzene) in Groundwater |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017983
MACHONS POINT - PAH's and Metals in sediment |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00017982
LOWER MONTAGUE (BTEX/TPH in Soil, Cadmium, Arsenic, Copper, PAH in Sediment) |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00017976
GRAHAM POND - Waterlot sediment - No Concerns at this time |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017975
GRAHAM POND - No Impacts Land Based Impacts Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017973
FRENCH RIVER -SOUTH LANDING (No Land Based Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017970
DARNLEY (BRIDGE) (Arsenic in soil Closed) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017969
DARNLEY (BRIDGE) ( Waterlot Sediment Metal and PAH |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00017967
COVEHEAD (no land impacts) Closed |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017964
BORDEN - FISHERMEN'S WHARF (No Impacts- Boat Maintenance Area) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017963
ALBERTON (NORTHPORT) (No Land Based Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016799
Former Savage Harbour Range Lights - Further Assessment Required |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016776
Little Sands (Metals in Soil Exceeding SSCs) |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 05 Detailed Testing Program |
00016773
Charlottetown Coast Guard Radio Station (No Contamination Found) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016772
Wrights Range Front - No Impacts Identified |
Confirmatory sampling completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00016765
Summerside Range Rear (Lead in Soil) |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00016764
Summerside Range Front (Lead in Soil) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016760
St Peters Island - Metals impacted soil |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00016757
St Peters (Metal impacts in soil) |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00016753
Shipwreck Point - paint abatement complete. No fur |
Confirmatory sampling completed. No further action required. | 2021-2022 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00016747
Port Borden Range Rear (Disposed) (Zinc impacted soil at former lightstation) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016746
Port Borden Range Front (No Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016740
Pinette River Outer Range Site - Zinc and Lead Impacts in Soil |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016737
Northport Range Rear (No Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016733
North Rustico Harbour - No Impacts Identified |
Confirmatory sampling completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00016722
Murray Harbour Range Rear (Metals in Soil exceeding SSCs) |
Confirmatory sampling completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00016721
Murray Harbour Range Front (Metals in Soil not exceeding SSCs) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016716
Malpeque Harbour Approach Range Site (No Concerns Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016709
Haszard Point Range Rear - PAHs and Metals in Soil |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00016708
Haszard Point Range Front - Metals in soil |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00016686
Cascumpeque - No Impacts |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00016680
Brighton Beach Range Rear - No Impacts |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016674
Annandale Range Rear |
Confirmatory sampling completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00016673
Annandale Range Front (Metals in Soil) |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00016664
Summerside SAR (No Impacts Identified) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016663
Souris SAR (Metals and PAHs in Sediment) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013374
MALPEQUE COVE (MALPEQUE) - Zinc and Copper in Soil |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013233
NORTH RUSTICO (Impacted Sediments- Metals/PAHs) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00013232
NORTH RUSTICO (Copper Impacted Soil in Boat Storage Area) |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00013219
Birch Point Range Front - Metals Impacted Soil |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00013163
Cape Tormentine Pier Range Rear Light (Lead and Zinc in Soil near light) |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013128
NORTH RUSTICO (Hydrocarbon Stained Soil near AST) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00013114
HOWARDS COVE - Metal Impacts in Sediment |
Detailed testing completed. No further action required. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00013113
ABRAMS VILLAGE (Waterlot Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00013097
Harbourside Office and Storage Building(Disposed) (PAHs, PCBs and Metals in waterlot sediment) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00013092
Harbourside Office and Storage Building (Disposed) (Hydrocarbons near Former UST and Metals near Building) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013090
SKINNERS POND (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00013057
BEACH POINT (Copper Impacts > ISQGs in Waterlot Sediment) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00013051
RED HEAD - Sediment Impacts-Hydrocarbons, DDT, PCBs, Metals |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008490
Alexandra Sm. Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00001329
Crops and Livestock Research Centre |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 05 Detailed Testing Program |
00000891
NAUFRAGE (Metal Impacts/Potential PAH Impacts in Sediment) |
Initial testing completed. No further action required. | 2023-2024 | 03 Initial Testing Program | |
00000867
Howards Cove - Metal and Hydrocarbon Impacted Soil |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |