Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000877
Corossol Island - minor shore light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000925
HMCS Jolliet-Sept-Iles naval reserve |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00001042
Salaberry-de-Valleyfield RCMP |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00001043
Rouyn-Noranda RCMP |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00001046
Granby RCMP |
Historical review not required. | 2005-2006 | 01 Identify Suspect Sites | |
00001270
Rimouski - 1 River |
Historical review not required. | 2017-2018 | 01 Identify Suspect Sites | |
00001283
Kinojevis River at Cléricy |
Historical review not required. | 2014-2015 | 01 Identify Suspect Sites | |
00001334
Food Research and Development Centre |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00002366
Moisie River |
Detailed testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00002755
Moisie River |
Historical review not required. | 2010-2011 | 01 Identify Suspect Sites | |
00005351
80 - Innu Takuaikan Uashat Mak Mani-Utenam - 06106 - UASHAT 27 - 0302555905 |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00005360
80 - Innu Takuaikan Uashat Mak Mani-Utenam - 06106 - UASHAT 27 - 0302556805 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00006021
63 - Nation Anishnabe du Lac Simon - 06134 - LAC SIMON - 0302622905 |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00006029
51 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 0302623705 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00006736
80 - Innu Takuaikan Uashat Mak Mani-Utenam - 06107 - MALIOTENAM 27A - 0302896906 |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00007599
051 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 0304233709 |
Historical review completed. No further action required. | 2010-2011 | 02 Historical Review | |
00008560
Matane Armoury |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00008689
Rouyn-Noranda Armoury |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008690
Rouyn-Noranda Armoury - parking and POL & Hazmat storage |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008764
Rivière du Loup |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00011445
Rivière-du-Loup (demolished building) |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00011446
Rivière-du-Loup (septic system) |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00011447
Rivière-du-Loup (water wells) |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00011448
Rivière-du-Loup (periphery) |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00011520
Outaouais river at Grenville |
Historical review completed. No further action required. | 2008-2009 | 02 Historical Review | |
00012221
Zinc (Zn) contaminated soil around landmark base |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012222
Saint-Pancrace Point - western range light, former RL |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012225
Contaminated soils Zn and Cr near landmark base |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00012348
Sept-Îles, tide gage |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00012352
Île des Barques/Île du Moine (no 1) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00012353
Île Ronde/Île de Grâce (no 2) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00012370
Barques Island - ice remote monitoring |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00012377
R-16, site for geodetic point |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00012378
E-34, geodetic point |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00012407
Rivière du Loup, Point of |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00012418
Baie-Comeau |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00012456
Sorel, OTF site |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00012468
ANGLIERS (DES QUINZE LAKE, SCH) |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00012511
RIMOUSKI-EST (MULTIPURPOSE HARBOUR, SCH, LAND LOT, GASOLINE AND DIESEL TANKS) |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
00012514
SENNETERRE (LAC MATCHI-MANITOU, SCH). |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00012521
ST-GEDEON (LES ILES) |
Initial testing completed. No further action required. | 2005-2006 | 03 Initial Testing Program | |
00012527
STE-ANNE-DE-SOREL |
Historical review completed. No further action required. | 2008-2009 | 02 Historical Review | |
00012528
STE-ANNE-DE-SOREL (AUBERGE DE LA RIVE, SCH). |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00012529
STE-FLAVIE (VILLAGE, SCH) |
Historical review completed. No further action required. | 2015-2016 | 02 Historical Review | |
00012537
GRAND-MÈRE (SCH) |
Initial testing completed. No further action required. | 2023-2024 | 03 Initial Testing Program | |
00012540
MATANE (HARBOUR, SCH, WATERLOT, SOUTHERN FACE OF THE FINGER PIER WHARF) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012866
Lake St. Francis South Breakwater (D1) - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013008
350-C01 Cowansville - Dangerous Goods Storage Area |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013009
350-C07 Cowansville - Active Firing Range |
Initial testing completed. No further action required. | 2014-2015 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013032
345-C03 Drummond Institution - Fuel Storage Tank System |
Confirmatory sampling completed. No further action required. | 2014-2015 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00013250
St-Barnabé Island - As around the beacon |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013288
Sur le Brise lame |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00013289
Cacouna Sud; sur le brise lame, postérieur |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00013290
Cacouna North, anterior |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00013291
Cacouna North, posterior |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00013299
Beauharnois Canal Upper Entrance Front - Beauharno |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013311
Beauharnois Canal Upper Entrance Rear - Beauharnoi |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013373
Lake St. Francis North Breakwater D2 - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013527
Drummondville RCMP Detachment |
Initial testing completed. No further action required. | 2019-2020 | 03 Initial Testing Program | |
00013698
Valleyfield Harbour Entrance DV12 ( Unassessed) |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00013970
Port Colborne Entrance Range Front (No Contamination Identified) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00017045
Pointe au Chene Range Front (Metals in Soil) |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017046
Pointe au Chene Range Rear (Metals in Soil) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021618
Matane (former front light, divested). |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00021619
Matane, East breakwater |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021620
Matane, West breakwater |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021621
Pointe-au-Père, ancien FR, cédé |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00021622
Rimouski Harbour |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021623
Rimouski (wharf light) |
Historical review completed. No further action required. | 2015-2016 | 02 Historical Review | |
00021624
Rimouski, Flotte |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00021625
Cap à la Carre |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021626
Bic Island - minor shore light, western end |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00021632
Cacouna Harbour |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021633
Cacouna Harbour |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021634
Cacouna North Harbour |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021635
Cacouna South Harbour |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021636
Cacouna, ancien terrain aéroglisseur, cédé |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00021638
Rivière-du-Loup, Point of - wharf |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00021683
Sorel (Saurel Marina, SAR/RER station) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00021685
Groundwater near watch-house |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 05 Detailed Testing Program |
00021686
Sorel Base - sediments, 1993 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021687
Sorel - RSER, divested. |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00021690
Tracy (heating plant, camera, ceded) |
Historical review completed. No further action required. | 2014-2015 | 02 Historical Review | |
00021691
Therm, ancien amer, cédé |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021761
Rimouski tide gage |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00021767
Valleyfield (SAR/RER station) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00021812
Lapierre Island - front range light, former pillar |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021901
Pointe Manicouagan |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021902
Baie-Comeau (area office) |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00021904
Baie-Comeau (storage) |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00021906
Western Rock - Minor Shore Light and heliport |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021907
Chasse Point - minor shore light |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00021908
Grande-Basque Island - minor shore light and heliport |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021909
Sept-Îles |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00021910
Sept-Îles (240 Joliette Street, storage) |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00021911
Sept-Îles (701 Laure Blvd., area office) |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00021912
Sept-Îles (east, wharf light) |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00021913
Sept-Îles (RSER, storage) |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00021914
Sept-Îles, havre de pêche |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00021915
Lac-Daigle - VHF |
Confirmatory sampling completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00022024
Grenville - former front range light, ceded |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00022094
MATANE (NEW HARBOUR, FISHING WHARF, SCH, WATERLOT, OFF-PROPERTY SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00022095
Commercial wharf and sea-break - sediments |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022099
Moisie |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00022134
SEPT-ÎLES (OLD WHARF, SCH, WATERLOT, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00022140
STE-FÉLICITÉ (À LA CROIX COVE, SCH, LAND LOT, LAUNCH RAMP) |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00022141
Ship way (sediments) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022142
Around former shelter and access road (soils) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022143
STE-FÉLICITÉ (VILLAGE, SCH, LAUNCH RAMP) |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00022160
BAIE-COMEAU (MULTIPURPOSE HARBOUR, SCH, WATERLOT, FLOATING PONTOON, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022161
BAIE-COMEAU (MULTIPURPOSE HARBOUR, SCH, LAND LOT, TEMPORARY WASTE OIL STORAGE) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00022176
SEPT-ÎLES (BUNGE PARK, SCH, WATERLOT, SEDIMENTS) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00022204
Long Pèlerin, the former boathouse |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00022908
Rimouski port facility land |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00023164
Aux Sables Island - former front range light, downstream |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
00024053
Tanks and buildings at lessee site |
Confirmatory sampling completed. No further action required. | 2018-2019 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00024059
Contaminated soil near railway |
Confirmatory sampling completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024060
Sediments around Pointe-au-Père wharf |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024586
Lac-à-la-Pêche Sawmill |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00024587
Ile des Cinq Point |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024588
Wabenaki refuge generator and former storage tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024590
Waber Lake Forest Camp |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024591
Wapizagonke-North camping storage tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024592
Edouard Lake Storage Tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024594
Rivière à la Pêche garage |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00026089
Gros Cacouna- aquatic portion |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026102
former fire training area (PFAS) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026105
Matane - Water lot - sediments |
Initial testing completed. No further action required. | 2019-2020 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026107
Rimouski Est - water lot - sediments |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00026108
Baie-Comeau - groundwater monitoring and contaminated soils in the parking |
Remediation / risk management completed. No further action required. | 2021-2022 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00026135
Buried Metal Barrels |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00027521
île de l`Estuaire National Wildlife Area (Consolidated) |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027641
Sept-Iles RCMP Detachment Site |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00027734
Former underground storage tanks sector |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00028017
Gros-Cacouna - Residual lands |
Historical review completed. No further action required. | 2022-2023 | 02 Historical Review | |
05200001
051 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 2000031796 |
Long term monitoring completed. No further action required. | 2000-2001 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
05200002
51 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ / 2000000993 |
Initial testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05200003
051 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 2000091199 |
Long term monitoring completed. No further action required. | 2000-2001 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
05200004
051 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 2000031696 |
Long term monitoring completed. No further action required. | 2000-2001 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
05200005
051 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 2000000193 |
Long term monitoring completed. No further action required. | 2000-2001 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
05200006
051 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 2000048498 |
Long term monitoring completed. No further action required. | 2000-2001 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
05200007
051 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 2000001393 |
Long term monitoring completed. No further action required. | 2000-2001 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
05200008
051 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ - 2000001593 |
Remediation / risk management completed. No further action required. | 2000-2001 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05343001
63 - Nation Anishnabe du Lac Simon - 06134 - LAC SIMON - 2000001493 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
05343002
63 - Nation Anishnabe du Lac Simon - 06134 - LAC SIMON - 2000002093 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
05366001
080 - Innu Takuaikan Uashat Mak Mani-Utenam - 06107 - MALIOTÉNAM INDIAN RESERVE NO. 27A - 2000037796 |
Long term monitoring completed. No further action required. | 2000-2001 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
05370001
080 - Innu Takuaikan Uashat Mak Mani-Utenam - 06106 - UASHAT INDIAN RESERVE NO. 27 - 2000004793 |
Long term monitoring completed. No further action required. | 2000-2001 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
05396001
Matane port facility |
Confirmatory sampling completed. No further action required. | 2019-2020 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05432012
Gros-Cacouna port facility |
Detailed testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05441001
Rimouski Armoury |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05443001
180 Cathedrale avenue, Rimouski |
Initial testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05469001
Bicquette Island - light station area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05509001
Notre-Dame-du-Portage (base of antenna no. 1) |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05906036
Rivière-du-loup Armoury, Thériault Boulevard |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06103001
Jos - former beacon, ceded |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06222001
4695 Boul. de Shawinigan-sud, Shawinigan |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
06477001
Former Shawinigan Armoury |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06564001
Barques Island - front range light |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06565001
de Grâce Island - front range light |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06566001
Lapierre Island - western front range light, former pillar |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06567001
West Lapierre Island - former rear range light |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06569001
de Grâce Island - rear range light |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06578001
Sorel wharf site |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06579003
Sorel Base - consolidated areas |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
07738001
44 Lac avenue, Rouyn-Noranda |
Detailed testing completed. No further action required. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
07770001
Air Navigation Facility: Non Directional Beacon |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
08132001
CFS Moisie OPS, TX, GATR Sites |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
08134001
Firefighter training site |
Confirmatory sampling completed. No further action required. | 2019-2020 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08134002
Nitrate-contaminated aquifer |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08134003
Former dumps |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08134006
Garage |
Remediation / risk management completed. No further action required. | 2018-2019 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08134007
Lessee land |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08134008
Groundwater |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08134009
Sept-Îles airport land |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08148001
Harbour sediments |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
08148002
Sediments around wharf |
Detailed testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
08150001
Former firefighter training site |
Confirmatory sampling completed. No further action required. | 2001-2002 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
20624002
Saint-Germain Foundry -Airborne contamination |
Detailed testing completed. No further action required. | 2018-2019 | I Insufficient Information | 05 Detailed Testing Program |
22974001
SEPT-ÎLES (BUNGE PARK, SCH, LAND LOT, SOILS SOUTHWEST OF THE SERVICE BUILDINGS) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
23277001
Site 23277001 - Fill around buildings |
Detailed testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 05 Detailed Testing Program |
23732001
Saint-Pancrace Point - extreme point, minor shore light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
27013083
Bicquette Island |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
27013084
De la Providence Island (cottage) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
27013085
Grande Island |
Long term monitoring completed. No further action required. | 2014-2015 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
29880001
Daigle Lake - RX, former communications site, divested |
Remediation / risk management completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
30058001
Rimouski, Port of - rear range light |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 05 Detailed Testing Program |
30406001
Harbour sediments |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
36265001
Cacouna (site of former reservoir) |
Remediation / risk management completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56026001
Corbeau Point - minor shore light and heliport |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
56454001
St-Mathieu Compound |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
58520001
Rimouski Naval Reserve, Montée Industrielle street |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
58520002
Rimouski Naval Reserve, boathouse |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
67165001
CanmetMINING Val-d'Or |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67449001
Pointe-au-Père NWA |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
82040001
du Moine Island - rear range light |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
82041001
Sainte-Anne-de-Sorel (rear range light) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
82091001
du Moine Island - front range light |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
82092001
Sainte-Anne-de-Sorel (front range light) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
82193001
Aux Sables Island - former front range light, downstream |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
82194001
Aux Sables Island - former front range light, upstream |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
82206001
Lapierre Island - East, former rear range light |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
82225001
Moisie (radar, telecommunications site) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
82346001
Barques Island - rear range light |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
N0006001
Firefighter training site |
Confirmatory sampling completed. No further action required. | 2008-2009 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0006002
Asphalt concrete pad |
Confirmatory sampling completed. No further action required. | 2008-2009 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0006003
Site east of Q-60 |
Confirmatory sampling completed. No further action required. | 2008-2009 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0006004
Q-60 |
Confirmatory sampling completed. No further action required. | 2008-2009 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0006005
Former army depot |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
N0212001
Multipurpose building |
Confirmatory sampling completed. No further action required. | 2008-2009 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N7096001
Former CFS Moisie - Site Admin |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
- Version: