Sort Key:FCSI Identifier (ascending)
Sites Found:105
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
00002587
Staining in APU Building
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
00008359
Oshawa Armoury
Initial testing completed. No further action required. 2019-2020 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008360
HMCS York
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008361
Disposed - Mississauga Armoury
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008362
Scarborough Armoury
Initial testing completed. No further action required. 2016-2017 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008381
Moss Park Armoury
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008382
Canadian Forces Staff College
Initial testing completed. No further action required. 2022-2023   03 Initial Testing Program
00008383
Mosley Street Armoury
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008383
Mosley Street Armoury
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008384
Fort York //
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008384
Fort York //
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008385
Todd Road Armoury
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00008385
Todd Road Armoury
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00008386
Oshawa Airport
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00008386
Oshawa Airport
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00008387
Denison Armoury
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008387
Denison Armoury
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008567
PA Warehouse
Historical review not required. 2018-2019   01 Identify Suspect Sites
00008567
PA Warehouse
Historical review not required. 2018-2019   01 Identify Suspect Sites
00008568
RCSU Warehouse
Historical review not required. 2016-2017   01 Identify Suspect Sites
00008568
RCSU Warehouse
Historical review not required. 2016-2017   01 Identify Suspect Sites
00008569
TMFRC
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008569
TMFRC
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008570
CFRC (City Centre)
Historical review not required. 2010-2011   01 Identify Suspect Sites
00008570
CFRC (City Centre)
Historical review not required. 2010-2011   01 Identify Suspect Sites
00008571
CFRC (Yonge Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
00008571
CFRC (Yonge Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
00008572
Etobicoke Armoury
Historical review completed. No further action required. 2016-2017   02 Historical Review
00008572
Etobicoke Armoury
Historical review completed. No further action required. 2016-2017   02 Historical Review
00008573
CFRC (John Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
00008573
CFRC (John Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
00008574
Aurora Armoury
Initial testing completed. No further action required. 2018-2019 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008574
Aurora Armoury
Initial testing completed. No further action required. 2018-2019 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008575
DCCCA Warehouse
Historical review not required. 2018-2019   01 Identify Suspect Sites
00008575
DCCCA Warehouse
Historical review not required. 2018-2019   01 Identify Suspect Sites
00008576
CN Tower (301 Front Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
00008576
CN Tower (301 Front Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
00012660
KESWICK (JERSEY RIVER) ( South Breakwater)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00012660
KESWICK (JERSEY RIVER) ( South Breakwater)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00012797
PORT CREDIT (Harbour Marina Building)
Detailed testing completed. No further action required. 2012-2013 I Insufficient Information 05 Detailed Testing Program
00012797
PORT CREDIT (Harbour Marina Building)
Detailed testing completed. No further action required. 2012-2013 I Insufficient Information 05 Detailed Testing Program
00012798
PORT CREDIT (Maintenance shop)
Detailed testing completed. No further action required. 2012-2013 I Insufficient Information 05 Detailed Testing Program
00012798
PORT CREDIT (Maintenance shop)
Detailed testing completed. No further action required. 2012-2013 I Insufficient Information 05 Detailed Testing Program
00014055
Toronto Main Harbour Channel Front (Daybeacon)
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00014055
Toronto Main Harbour Channel Front (Daybeacon)
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00015106
Brougham MCTS (Metal (zinc) impacted soil within fenced compound)
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00015106
Brougham MCTS (Metal (zinc) impacted soil within fenced compound)
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00015118
Trafalgar MCTS (Former radio station building)
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00015118
Trafalgar MCTS (Former radio station building)
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00016620
WHITBY (No Contamination Identified)
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00016620
WHITBY (No Contamination Identified)
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00022931
WHITBY (Boat Storage and Parking by Yacht Club and Surface Soils at Yacht Club and Former ASTs)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00022931
WHITBY (Boat Storage and Parking by Yacht Club and Surface Soils at Yacht Club and Former ASTs)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00022935
WHITBY (Promenade Park & Former Texaco Tank Farm (adjacent site))
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00022935
WHITBY (Promenade Park & Former Texaco Tank Farm (adjacent site))
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00022940
WHITBY (Historical Inlet (backfilled)/Confined Disposal Facility)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00022940
WHITBY (Historical Inlet (backfilled)/Confined Disposal Facility)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00022941
WHITBY (Port Whitby Marina and Shoreline Extension (backfilling))
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00022941
WHITBY (Port Whitby Marina and Shoreline Extension (backfilling))
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024058
Airport Lands Adjacent to Skeet Club
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024058
Airport Lands Adjacent to Skeet Club
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024671
PIN 614682
Confirmatory sampling completed. No further action required. 2014-2015 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00024671
PIN 614682
Confirmatory sampling completed. No further action required. 2014-2015 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00024672
PIN 614316
Initial testing completed. No further action required. 2014-2015   03 Initial Testing Program
00024672
PIN 614316
Initial testing completed. No further action required. 2014-2015   03 Initial Testing Program
00024673
PIN 614461.1
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024673
PIN 614461.1
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024681
Port Granby Waste Management Facility
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024681
Port Granby Waste Management Facility
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024821
Toronto Training Area
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00024821
Toronto Training Area
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00025354
WHITBY (Public Boat Launch Area)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025354
WHITBY (Public Boat Launch Area)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025563
Pickering Lands Site PIN 614225
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00025563
Pickering Lands Site PIN 614225
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00025567
Pickering Lands Site PIN 614233.1
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025567
Pickering Lands Site PIN 614233.1
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025568
Pickering Lands Site PIN 614233.2
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00025568
Pickering Lands Site PIN 614233.2
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00025569
Pickering Lands Site PIN 614258
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00025569
Pickering Lands Site PIN 614258
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00026079
PIN 614048 AREA C- House
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00026079
PIN 614048 AREA C- House
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00026080
PIN 614127 B - Porch and Barn
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00026080
PIN 614127 B - Porch and Barn
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00026093
Pickering Lands Site PIN 614229
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00026093
Pickering Lands Site PIN 614229
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00026109
PIN 614698 - AEC 1 and AEC 2
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00026109
PIN 614698 - AEC 1 and AEC 2
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00026479
Toronto Maintenance Center
Long term monitoring completed. No further action required. 2020-2021 1 High Priority for Action 10 Long-Term Monitoring (Optional)
00026479
Toronto Maintenance Center
Long term monitoring completed. No further action required. 2020-2021 1 High Priority for Action 10 Long-Term Monitoring (Optional)
00027539
Greater Toronto Area
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00027539
Greater Toronto Area
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00027543 Remediation / risk management completed. No further action required. 2019-2020 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
00027543 Remediation / risk management completed. No further action required. 2019-2020 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
00027604 Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00027604 Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00027607 Historical review planned. 2023-2024   01 Identify Suspect Sites
00027607 Historical review planned. 2023-2024   01 Identify Suspect Sites
00027664
VIA TMC
Initial testing completed. No further action required. 2019-2020 1 High Priority for Action 03 Initial Testing Program
00027664
VIA TMC
Initial testing completed. No further action required. 2019-2020 1 High Priority for Action 03 Initial Testing Program
03907001
PORT CREDIT (Fill Soils-NE corner of site)
Detailed testing completed. No further action required. 2012-2013 2 Medium Priority for Action 05 Detailed Testing Program
03907001
PORT CREDIT (Fill Soils-NE corner of site)
Detailed testing completed. No further action required. 2012-2013 2 Medium Priority for Action 05 Detailed Testing Program
03907002
PORT CREDIT (Near Nav Aid on E Breakwater:Rip-Rap-Soil)
Detailed testing completed. No further action required. 2012-2013 3 Low Priority for Action 05 Detailed Testing Program
03907002
PORT CREDIT (Near Nav Aid on E Breakwater:Rip-Rap-Soil)
Detailed testing completed. No further action required. 2012-2013 3 Low Priority for Action 05 Detailed Testing Program
09820003
PIN 614075
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820003
PIN 614075
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820008
PIN 614107 - Wooded Lot
Confirmatory sampling completed. No further action required. 2014-2015 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820008
PIN 614107 - Wooded Lot
Confirmatory sampling completed. No further action required. 2014-2015 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820012
PIN 614215
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09820012
PIN 614215
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09820013
PIN 614224
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820013
PIN 614224
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820015
PIN 614272.2
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820015
PIN 614272.2
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820021
PIN 614386
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820021
PIN 614386
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820025
PIN 614548
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
09820025
PIN 614548
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
09820043
PIN 614645
Confirmatory sampling completed. No further action required. 2019-2020 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820043
PIN 614645
Confirmatory sampling completed. No further action required. 2019-2020 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820044
PIN 614019
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820044
PIN 614019
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820045
PIN 614505
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
09820045
PIN 614505
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
09820046
PIN 614495
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
09820046
PIN 614495
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
09820047
PIN 614482
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820047
PIN 614482
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820048
PIN 614439.2
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
09820048
PIN 614439.2
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
09820049
PIN 614425.1
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09820049
PIN 614425.1
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09820050
PIN 614726
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820050
PIN 614726
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820051
PIN 614020
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820051
PIN 614020
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820052
PIN 614699
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
09820052
PIN 614699
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
09820053
PIN 614649/650
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
09820053
PIN 614649/650
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
09820054
PIN 614698
Detailed testing completed. No further action required. 2019-2020 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09820054
PIN 614698
Detailed testing completed. No further action required. 2019-2020 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09820055
PIN 614380
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
09820055
PIN 614380
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
09820057
PIN 614042
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820057
PIN 614042
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09820059
PIN 614576 (Honda)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09820059
PIN 614576 (Honda)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09935001
Health Canada Laboratory
Confirmatory sampling completed. No further action required. 2006-2007 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09935001
Health Canada Laboratory
Confirmatory sampling completed. No further action required. 2006-2007 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
54011001
TORONTO (BLUFFERS PARK) (Soil,Eastern Tip of West breakwater)
Detailed testing completed. No further action required. 2005-2006 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
54011001
TORONTO (BLUFFERS PARK) (Soil,Eastern Tip of West breakwater)
Detailed testing completed. No further action required. 2005-2006 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
54117001
Burlington Lift Bridge (Parcel A)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
54117001
Burlington Lift Bridge (Parcel A)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
67590001
Area A (West Wharf) - Centre and North portions were divested to the City of Oshawa in the 2011/12 FY. The South portion rem
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
67590001
Area A (West Wharf) - Centre and North portions were divested to the City of Oshawa in the 2011/12 FY. The South portion rem
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
67590004
Area D (Rail Spur)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
67590004
Area D (Rail Spur)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
67590005
Area E (Marina)
Remediation / risk management completed. No further action required. 2016-2017 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
67590005
Area E (Marina)
Remediation / risk management completed. No further action required. 2016-2017 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
67590007
Area B - former Premier concrete
Detailed testing completed. No further action required. 2012-2013 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
67590007
Area B - former Premier concrete
Detailed testing completed. No further action required. 2012-2013 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
67590008
Area C - Marina/waterlot
Detailed testing completed. No further action required. 2011-2012 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
67590008
Area C - Marina/waterlot
Detailed testing completed. No further action required. 2011-2012 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
70602001
Former No.1 Canadian Forces Supply Depot (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602001
Former No.1 Canadian Forces Supply Depot (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602002
Central Heating Plant (Downsview)
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602002
Central Heating Plant (Downsview)
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602003
Fire Fighting Training Area (Downsview)
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602003
Fire Fighting Training Area (Downsview)
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602004
Auto Hobby Club Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602004
Auto Hobby Club Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602005
Construction Engineering Section (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602005
Construction Engineering Section (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602006
Former Sewage Treatment Plant (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602006
Former Sewage Treatment Plant (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602007
Building 103 (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602007
Building 103 (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602008
Building 100 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602008
Building 100 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602009
Former building 102 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602009
Former building 102 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602010
Former Bunker 'C' DeHavilland Plant Area (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602010
Former Bunker 'C' DeHavilland Plant Area (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602011
Plant 1 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602011
Plant 1 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602012
Plant 2 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602012
Plant 2 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602013
Plant 3 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602013
Plant 3 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602014
Gravel Parking Lot Construction Eng. Section (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602014
Gravel Parking Lot Construction Eng. Section (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602015
Former POL Compound Building 107 (Downsview)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
70602015
Former POL Compound Building 107 (Downsview)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
70602016
Former USTs Building 107 (Downsview)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
70602016
Former USTs Building 107 (Downsview)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
70602017
Former Building 115 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602017
Former Building 115 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602018
Former building 131 (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602018
Former building 131 (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602019
Downsview Closure
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
70602019
Downsview Closure