Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 105 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00002587
Staining in APU Building |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00008359
Oshawa Armoury |
Initial testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008360
HMCS York |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008361
Disposed - Mississauga Armoury |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008362
Scarborough Armoury |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008381
Moss Park Armoury |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008382
Canadian Forces Staff College |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00008383
Mosley Street Armoury |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008383
Mosley Street Armoury |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008384
Fort York // |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008384
Fort York // |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008385
Todd Road Armoury |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008385
Todd Road Armoury |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008386
Oshawa Airport |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008386
Oshawa Airport |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008387
Denison Armoury |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008387
Denison Armoury |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008567
PA Warehouse |
Historical review not required. | 2018-2019 | 01 Identify Suspect Sites | |
00008567
PA Warehouse |
Historical review not required. | 2018-2019 | 01 Identify Suspect Sites | |
00008568
RCSU Warehouse |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00008568
RCSU Warehouse |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00008569
TMFRC |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008569
TMFRC |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008570
CFRC (City Centre) |
Historical review not required. | 2010-2011 | 01 Identify Suspect Sites | |
00008570
CFRC (City Centre) |
Historical review not required. | 2010-2011 | 01 Identify Suspect Sites | |
00008571
CFRC (Yonge Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00008571
CFRC (Yonge Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00008572
Etobicoke Armoury |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00008572
Etobicoke Armoury |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00008573
CFRC (John Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00008573
CFRC (John Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00008574
Aurora Armoury |
Initial testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008574
Aurora Armoury |
Initial testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008575
DCCCA Warehouse |
Historical review not required. | 2018-2019 | 01 Identify Suspect Sites | |
00008575
DCCCA Warehouse |
Historical review not required. | 2018-2019 | 01 Identify Suspect Sites | |
00008576
CN Tower (301 Front Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00008576
CN Tower (301 Front Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00012660
KESWICK (JERSEY RIVER) ( South Breakwater) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012660
KESWICK (JERSEY RIVER) ( South Breakwater) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012797
PORT CREDIT (Harbour Marina Building) |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 05 Detailed Testing Program |
00012797
PORT CREDIT (Harbour Marina Building) |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 05 Detailed Testing Program |
00012798
PORT CREDIT (Maintenance shop) |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 05 Detailed Testing Program |
00012798
PORT CREDIT (Maintenance shop) |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 05 Detailed Testing Program |
00014055
Toronto Main Harbour Channel Front (Daybeacon) |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00014055
Toronto Main Harbour Channel Front (Daybeacon) |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00015106
Brougham MCTS (Metal (zinc) impacted soil within fenced compound) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00015106
Brougham MCTS (Metal (zinc) impacted soil within fenced compound) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00015118
Trafalgar MCTS (Former radio station building) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00015118
Trafalgar MCTS (Former radio station building) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00016620
WHITBY (No Contamination Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016620
WHITBY (No Contamination Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022931
WHITBY (Boat Storage and Parking by Yacht Club and Surface Soils at Yacht Club and Former ASTs) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022931
WHITBY (Boat Storage and Parking by Yacht Club and Surface Soils at Yacht Club and Former ASTs) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022935
WHITBY (Promenade Park & Former Texaco Tank Farm (adjacent site)) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00022935
WHITBY (Promenade Park & Former Texaco Tank Farm (adjacent site)) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00022940
WHITBY (Historical Inlet (backfilled)/Confined Disposal Facility) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022940
WHITBY (Historical Inlet (backfilled)/Confined Disposal Facility) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022941
WHITBY (Port Whitby Marina and Shoreline Extension (backfilling)) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022941
WHITBY (Port Whitby Marina and Shoreline Extension (backfilling)) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024058
Airport Lands Adjacent to Skeet Club |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024058
Airport Lands Adjacent to Skeet Club |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024671
PIN 614682 |
Confirmatory sampling completed. No further action required. | 2014-2015 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00024671
PIN 614682 |
Confirmatory sampling completed. No further action required. | 2014-2015 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00024672
PIN 614316 |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00024672
PIN 614316 |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00024673
PIN 614461.1 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024673
PIN 614461.1 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024681
Port Granby Waste Management Facility |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024681
Port Granby Waste Management Facility |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024821
Toronto Training Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024821
Toronto Training Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025354
WHITBY (Public Boat Launch Area) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025354
WHITBY (Public Boat Launch Area) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025563
Pickering Lands Site PIN 614225 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025563
Pickering Lands Site PIN 614225 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025567
Pickering Lands Site PIN 614233.1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025567
Pickering Lands Site PIN 614233.1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025568
Pickering Lands Site PIN 614233.2 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00025568
Pickering Lands Site PIN 614233.2 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00025569
Pickering Lands Site PIN 614258 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025569
Pickering Lands Site PIN 614258 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00026079
PIN 614048 AREA C- House |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026079
PIN 614048 AREA C- House |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026080
PIN 614127 B - Porch and Barn |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00026080
PIN 614127 B - Porch and Barn |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00026093
Pickering Lands Site PIN 614229 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00026093
Pickering Lands Site PIN 614229 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00026109
PIN 614698 - AEC 1 and AEC 2 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00026109
PIN 614698 - AEC 1 and AEC 2 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00026479
Toronto Maintenance Center |
Long term monitoring completed. No further action required. | 2020-2021 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00026479
Toronto Maintenance Center |
Long term monitoring completed. No further action required. | 2020-2021 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00027539
Greater Toronto Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00027539
Greater Toronto Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00027543 | Remediation / risk management completed. No further action required. | 2019-2020 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
00027543 | Remediation / risk management completed. No further action required. | 2019-2020 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
00027604 | Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00027604 | Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00027607 | Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027607 | Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027664
VIA TMC |
Initial testing completed. No further action required. | 2019-2020 | 1 High Priority for Action | 03 Initial Testing Program |
00027664
VIA TMC |
Initial testing completed. No further action required. | 2019-2020 | 1 High Priority for Action | 03 Initial Testing Program |
03907001
PORT CREDIT (Fill Soils-NE corner of site) |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 05 Detailed Testing Program |
03907001
PORT CREDIT (Fill Soils-NE corner of site) |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 05 Detailed Testing Program |
03907002
PORT CREDIT (Near Nav Aid on E Breakwater:Rip-Rap-Soil) |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 05 Detailed Testing Program |
03907002
PORT CREDIT (Near Nav Aid on E Breakwater:Rip-Rap-Soil) |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 05 Detailed Testing Program |
09820003
PIN 614075 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820003
PIN 614075 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820008
PIN 614107 - Wooded Lot |
Confirmatory sampling completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820008
PIN 614107 - Wooded Lot |
Confirmatory sampling completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820012
PIN 614215 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820012
PIN 614215 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820013
PIN 614224 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820013
PIN 614224 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820015
PIN 614272.2 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820015
PIN 614272.2 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820021
PIN 614386 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820021
PIN 614386 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820025
PIN 614548 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
09820025
PIN 614548 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
09820043
PIN 614645 |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820043
PIN 614645 |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820044
PIN 614019 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820044
PIN 614019 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820045
PIN 614505 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820045
PIN 614505 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820046
PIN 614495 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820046
PIN 614495 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820047
PIN 614482 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820047
PIN 614482 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820048
PIN 614439.2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09820048
PIN 614439.2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09820049
PIN 614425.1 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820049
PIN 614425.1 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820050
PIN 614726 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820050
PIN 614726 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820051
PIN 614020 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820051
PIN 614020 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820052
PIN 614699 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
09820052
PIN 614699 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
09820053
PIN 614649/650 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
09820053
PIN 614649/650 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
09820054
PIN 614698 |
Detailed testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820054
PIN 614698 |
Detailed testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820055
PIN 614380 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820055
PIN 614380 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820057
PIN 614042 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820057
PIN 614042 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820059
PIN 614576 (Honda) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09820059
PIN 614576 (Honda) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09935001
Health Canada Laboratory |
Confirmatory sampling completed. No further action required. | 2006-2007 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09935001
Health Canada Laboratory |
Confirmatory sampling completed. No further action required. | 2006-2007 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
54011001
TORONTO (BLUFFERS PARK) (Soil,Eastern Tip of West breakwater) |
Detailed testing completed. No further action required. | 2005-2006 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
54011001
TORONTO (BLUFFERS PARK) (Soil,Eastern Tip of West breakwater) |
Detailed testing completed. No further action required. | 2005-2006 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
54117001
Burlington Lift Bridge (Parcel A) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
54117001
Burlington Lift Bridge (Parcel A) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
67590001
Area A (West Wharf) - Centre and North portions were divested to the City of Oshawa in the 2011/12 FY. The South portion rem |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67590001
Area A (West Wharf) - Centre and North portions were divested to the City of Oshawa in the 2011/12 FY. The South portion rem |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67590004
Area D (Rail Spur) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
67590004
Area D (Rail Spur) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
67590005
Area E (Marina) |
Remediation / risk management completed. No further action required. | 2016-2017 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67590005
Area E (Marina) |
Remediation / risk management completed. No further action required. | 2016-2017 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67590007
Area B - former Premier concrete |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
67590007
Area B - former Premier concrete |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
67590008
Area C - Marina/waterlot |
Detailed testing completed. No further action required. | 2011-2012 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
67590008
Area C - Marina/waterlot |
Detailed testing completed. No further action required. | 2011-2012 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
70602001
Former No.1 Canadian Forces Supply Depot (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602001
Former No.1 Canadian Forces Supply Depot (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602002
Central Heating Plant (Downsview) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602002
Central Heating Plant (Downsview) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602003
Fire Fighting Training Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602003
Fire Fighting Training Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602004
Auto Hobby Club Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602004
Auto Hobby Club Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602005
Construction Engineering Section (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602005
Construction Engineering Section (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602006
Former Sewage Treatment Plant (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602006
Former Sewage Treatment Plant (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602007
Building 103 (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602007
Building 103 (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602008
Building 100 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602008
Building 100 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602009
Former building 102 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602009
Former building 102 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602010
Former Bunker 'C' DeHavilland Plant Area (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602010
Former Bunker 'C' DeHavilland Plant Area (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602011
Plant 1 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602011
Plant 1 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602012
Plant 2 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602012
Plant 2 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602013
Plant 3 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602013
Plant 3 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602014
Gravel Parking Lot Construction Eng. Section (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602014
Gravel Parking Lot Construction Eng. Section (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602015
Former POL Compound Building 107 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
70602015
Former POL Compound Building 107 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
70602016
Former USTs Building 107 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
70602016
Former USTs Building 107 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
70602017
Former Building 115 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602017
Former Building 115 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602018
Former building 131 (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602018
Former building 131 (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602019
Downsview Closure |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602019
Downsview Closure |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
- Version:
- 40