Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 488 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000910
Gilman River |
Confirmatory sampling completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002329
Lake Brook Warden Residence |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00002330
Decca station |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00002331
Maintenance Garage Compound |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00002336
Pine Lake Dump Site Barrel Cache |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00002337
Rideau Canal, Swale of Lot 2, Concession IV |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002338
Warden's Operation Building |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008322
Former site of the Long Beach Visitor Information Centre |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008323
Abandonned bridge, former Combers Beach access road |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008324
Sunwapta Warden Station |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008325
Maligne Lake Warden Station |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008326
Athabasca Falls Warden Station |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008328
Fort Conger Historic Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00012826
Pukaskwa National Park, Administration Building Gas Shed |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00012829
Lake Louise Service Station |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012830
Bath Creek Tie Camp |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012831
Lake Louise CPR Power House |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012832
Redstreak Sinkhole |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012833
Dolly Varden Pit |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012834
16 Mile Pit |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012835
Abandoned barrels, with no known affiliation |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012836
Barrels at Active Research Camp or Cabin, known affiliation |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012837
Barrels at Inactive/Abandonned Cabin/Settlement, known affiliation |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012838
Barrels in active fuel caches, known affiliation |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012839
Empty barrels sites |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012840
K17 Nestor 2 living quarters building D |
Detailed testing completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012843
Wastes other than barrels |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00012844
Snow Creek |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012845
Trenton Parking Lot |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00012846
Hawk Creek |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012847
Grey Owl Marina |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012848
Waskesiu Lawn Bowling Green |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012849
Bear Trap Landfill |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00012850
Former Site of the Port Renfrew Motel |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012851
Roland Bay: Abandoned oil well site (Well L-41) |
Detailed testing completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012852
Spring River: abandoned oil well site (Well N-58) |
Detailed testing completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012853
Sheep Creek: placer gold mine |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012854
Castel Bay: abandoned oil well site (Well C-68) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012855
Kusrhaak: abandoned oil well site (Well D-16) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012856
Anthracite Townsite |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00012857
Bankhead Power Station |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012858
Parks Canada Landfill |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012859
Minnewanka Power Plant |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012860
Old Banff Industrial Block |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012861
Public Library Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012863
Former Forestry Camp |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012864
Monarch Campground |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012865
Amiskwi Mill Site |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013376
Castle Junction Household Dump |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022198
Stalag Salt Storage |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00022200
Garden River Public Works Yard |
Initial testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022201
Fifth Meridian Market AST |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022202
Garden River Trading (Charlie Rose) AST |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022203
Old Parks Compound |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022809
Vermillion Warden Station |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00022827
Garden River Landfill |
Initial testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022828
Northlands School Historic AST |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022829
Garden River Sewage Lagoon |
Historical review completed. No further action required. | 2021-2022 | 02 Historical Review | |
00022830
Former Septic Tile Field |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023292
Waskesiu Townsite Beaver Ponds |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
00023293
Site 9.1.1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00023295
Lomond Landfill |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00023376
Site 1.2.1 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023389
Cartier-Brebeuf Eastern Sector |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00023390
Cartier-Brebeuf North-Eastern Sector |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023391
Kingston Inner Harbour Marsh |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023442
Gilman Glacier Camp |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023443
Mosquito Creek |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023444
Parks Canada Trail along water in Perth |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023445
Church Historic AST |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023446
Swanson Camp 6 Sawmill at Sweetgrass Landing |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00023447
Swanson's Sawmill Camp # 3 Peace River |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00023448
Northern Transport Company Sawmill near Sawmill Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00023449
Sweetgrass Station Abattoir |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00023450
Fort Lawrence - Beaubassin National Historic Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023451
Upper Rideau Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023452
Newboro Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023453
Indian Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023455
Northwest Astotin Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023456
Mount Agassiz |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023457
Active Pass |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023458
Major Shore Light |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023459
Former Shed and Boat House |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023460
Abandoned Light Station |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023461
Saturna Island Fuel Shed |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023462
Saturna Island Light Tower |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023463
Saturna Island Dump |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023464
Saturna Island Service Pit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023467
Oil trap, operational centre's garage at Forillon National Park |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023472
Torngat Mountains NP, Upper Kangalaksiorvik Lake |
Remediation / risk management completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00023478
Brackley Pumphouse |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023479
Garage of the thermal power plant |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023481
Jasper National Park - Municipal Sewage Lagoon |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023482
Brewster Chalet |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023483
Airport Fuel Tank |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023610
Fort No. 1, Lévis Forts National Historic Site |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023971
Fort Battleford Garage and Maintenance Workshop |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023974
Ingonish Beach Detachment |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00024052
Belza Farmhouse |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024128
Illecillewaet Campground : Campsite # 30 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024292
Sandy Pond Day-Use Area |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024297
Alpine Lakes |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024298
Former Wildlife Park |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024299
Russell Island Homestead |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024300
Former asphalt plant |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024304
Keltic Incinerator Site |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024305
Dufferin Terrace |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024309
Struggle Site |
Initial testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024310
Tablesands site |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024573
Former Headquarters Service Station Site |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024575
Haslam Pit Pumphouse Former UST |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024576
Sandy Pond Boardwalk |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024581
Cape Gulch, Shoal Cove and Tallek Arm |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024582
Parmenter Island |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024586
Lac-à-la-Pêche Sawmill |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00024587
Ile des Cinq Point |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024588
Wabenaki refuge generator and former storage tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024589
Coude Lake Forest Camp |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00024590
Waber Lake Forest Camp |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024591
Wapizagonke-North camping storage tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024592
Edouard Lake Storage Tank |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024594
Rivière à la Pêche garage |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024664
Ya-Ha-Tinda Ranch |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024667
Harriet Harbour |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024668
Dixon Residence |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024676
Harbour of Cap-des-Rosiers |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024680
Walker Acquisition |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024804
Historic House |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025558
Creosote Treated Wood - Bennett Brook |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025561
Martin's Point Landfill |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025562
Slant's River Landfill |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025564
Former UST 2242 Grand Pré Road |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 05 Detailed Testing Program |
00025565
Old Apple Warehouse |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025566
Anthracite Mine Site |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025780
2501 Shingle Bay Road |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00025781
Wasagaming Drive Commercial Property |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025782
Donald Mine Site |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00025786
Cap-des-Rosiers Harbour Parking and Land |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025787
Grande-Grave Harbour Land |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025788
Chambly Canal little Lake at Saint-Jean-sur-Richelieu (residential sector) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025805
South side of Chambly canal: lock 1 to railroad bridge |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025806
Fort Wellington Maintenance Compound |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025807
2 Landing Road, mallorytown (dock and parking lot) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00025822
Jasper NP Abandoned Oil Tank |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025823
Land south of the Government of Canada Conference Center |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026029
North St. Mary’s Island – west end |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00026392
Former Gas/Diesel Fuelling Station - Administration Compound |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00026419
Parks Canada Garage, Sachs Harbour, NT |
Detailed testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00026433
Pukaskwa National Park Borrow Pit |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026456
Jasper National Park Fish Hatchery |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026478
Yoho Brothers Gas Station |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00026481
Banff Airstrip Site |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026482
Fuel Transfer Area |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00027545
Rideau Canal, Dow's Lake to Ottawa Locks |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00027546
Olde Barrels Cove |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00027547
Fort Wellington NHS |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027548
Prescott Arena Lands |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027549
Former CP Lands Prescott |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027551
Point Pelee Marsh |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00027552
Boulder Creek Operations Center |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027609
Radium Hot Springs Heating Fuel Tanks |
Historical review not required. | 2023-2024 | 01 Identify Suspect Sites | |
00027618
Cap-des-Rosiers Harbour South Jetty |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027660
Kenow Fire Impacted Areas |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00027691
Prince of Wales Fort -Staging area. |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00027698
Old Saw Mill on Saoyú |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027769
Beak Point |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00027770
Georges Island National Historic Site |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027779
Yoho Ranch |
Confirmatory sampling completed. No further action required. | 2021-2022 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027786
Former Cabot Trail Bridges |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027986
Clark Lake |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00028048
Peterborough Lift Lock Visitor Centre |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00028172
Jasper National Park, Snaring Warden Station and Associated Buidlings |
Suspected site | |||
00028173
Ojibway Shores |
Suspected site | 2 Medium Priority for Action | ||
01187001
Terra Nova Golf Course |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
01187002
Operations Compound |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
01775001
Red Bay (Principal Light Keeper's Residence) |
Detailed testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01775002
Red Bay (Fuel Storage Tank and Old Oil Dump) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01775003
Red Bay (Fuel Drum Storage) |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02087001
Cavendish Maintenance Compound |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02087002
Dalvay Compound - Chemical Storage Building |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02087003
Green Gables |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
02538001
Compound |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02595001
Petit Parc |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02750008
Former Railway Tie Storage Area |
Confirmatory sampling completed. No further action required. | 2013-2014 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
02991001
Ahern Avenue Old Maintenance Building |
Confirmatory sampling completed. No further action required. | 2013-2014 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
03604002
Irving Bulk Fuel Storage Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03640001
Parks Canada Trade Waste Site |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03640002
Former Town Landfill |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03640005
Former military disposal site |
Remediation / risk management completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03640006
Maintenance Compound Fuel Spill Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03842001
North Mountain Treated Wood Waste Temporary Storage Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03842003
Jerome Mountain Incinerator Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03842004
Ingonish Compound |
Confirmatory sampling completed. No further action required. | 2017-2018 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03842005
Cheticamp Compound |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03842006
Marrach Landfill |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03842008
Broad Cove Incinerator Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03842009
Highlands Links Golf Course Greens |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03842010
Cheticamp Compound Fuel Spill Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03842020
Grande Anse Compound |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03863001
Potato Disinfection Pit - Former AGCAN Research Station |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03863002
Fundy National Park Golf Course |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05828001
Cartier-Brebeuf Western Sector |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
06688001
Wharf area |
Confirmatory sampling completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959001
Canal sediments |
Detailed testing completed. No further action required. | 2014-2015 | 1 High Priority for Action | 05 Detailed Testing Program |
06959003
Site 10.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959004
Site 11.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959005
Site 11.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959006
Site 12.2 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959007
Site 13.3 |
Confirmatory sampling completed. No further action required. | 2020-2021 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959008
Site 13.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959009
Site 13.6 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959010
Site 13.8 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
06959011
Site 13.9 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959012
Site 14.1.1 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959013
Site 14.2 |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
06959014
Site 14.7 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959015
Site 15.1 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
06959017
Site 15.4 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959018
Site 15.5 |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 05 Detailed Testing Program |
06959019
Site 03.1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
06959020
Site 03.2.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959021
Site 03.2.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959022
Site 03.4 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959023
Site 04.1.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959024
Site 04.1.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959025
Site 04.1.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959026
Site 04.2.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959027
Site 04.2.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959028
Site 04.3 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06959029
Site 04.4 |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959030
Site 08.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959031
Site 09.3.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959032
Site 09.3.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959033
Site 11.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959034
Site 13.5 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959035
Site 01.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959036
Site 01.2 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959037
Site 01.3 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959038
Site 02.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959040
Site 02.2.0 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959042
Site 03.2.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959043
Site 03.2.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959044
Site 03.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959045
Site 03.5 |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959046
Site 04.2.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959047
Site 04.5 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
06959048
Site 04.6 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959049
Site 04.7 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959050
Site 05.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959051
Site 05.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959052
Site 05.4 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
06959053
Site 06.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959054
Site 06.2 |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959055
Site 07.1 (north deposit site) |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959056
Site 07.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959057
Site 07.3 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959058
Site 08.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959059
Site 08.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959060
Site 8.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959061
Site 08.5 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959062
Site 08.6 (north deposit site) |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959063
Site 09.1 (North deposit site) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959064
Site 09.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959065
Site 09.3.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959066
Site 09.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959067
Site 10.1 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959068
Site 10.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959069
Site 10.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959070
Site 10.5 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959071
Site 10.6 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959072
Site 11.4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959073
Site 11.5 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959074
Site 11.6 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959075
Site 11.7 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959076
Site 13.10 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959077
Site 13.1.1 |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959078
Site 13.1.2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959079
Site 13.1.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959080
Site 13.11 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959081
Site 13.2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959082
Site 13.7 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959084
Site 14.3 |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959085
Site 14.4 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959086
Site 15.2 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959088
Site 15.6 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06959089
Site 15.7 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06959090
Site 16.1 Peel Basin |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06959091
Site 02.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412001
Lower Reach Park |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09412002
Old Sly's Lockstation |
Remediation / risk management completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09412003
Industrial Island Park |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412004
Shops Compound |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412005
Mooney's Bay Marina (Hog's Back) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412006
Ayling's Marina |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412007
Reserve Land, Part 3, Extension of Lot 132/133 |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
09731003
Goose Bay - Sturgeon Lake |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
09731004
D26 Little Lake to Rice Lake |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09731005
Karten Metals, Trenton |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
10398001
Fort Mississauga NHS Niagara Golf Course |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
10667001
Camp Henry |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
10667002
Maintenance Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
12008001
Otter Cove, Gas Shed |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
12008002
Otter Cove, Generator Site |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
12705001
Underground Storage Tank |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 05 Detailed Testing Program |
12897001
Grey Owl Waste Disposal Ground |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
12897002
Maintenance Compound Garage, Former UST Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
12897003
West Lift Station Former UST Site |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
12897004
Townsite Washroom Former UST |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12897005
Clear Lake Golf Course |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
12897006
Boreal Island Construction Site |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
12897007
Former small landfills |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
12897008
Golf course maintenance yard former UST |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
13478002
Zahurski's Point Oil Dump Pit |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
13567001
Fort Walsh NHS Landfill |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
14567001
Commercial Property at Block 5 Lot 8, Waskesiu Townsite |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14567002
Lobstick Maintenance Yard |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14567003
Main Compound Fuel Storage |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14567004
Narrows Campground Generator Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14567005
Overflow Campground |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
14567006
Waskesiu Golf Course |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14567007
Camp 18 Gravel Pit |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14567008
Administration Parking Lot |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
14567009
Salt Shed |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
14567010
Waskesiu Breakwater |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
15404001
Rimrock Dump |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404002
Stephen Pit |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404004
Fairview Pit |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404005
Niblock Pit |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15404006
Snow Dump/Abandonned Landfill |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15404008
Minnewanka Landfill |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15404010
Peyto Pit |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15404011
Carrot Creek Landfillsite |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15404012
Cascade Borrow Pit |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404013
Cascade Landfill |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
15404014
Castle Junction Tradewaste Site |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404015
Golf Course Dump |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404016
Old Lake Louise Lumber Mill |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404022
Bankhead |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404031
Lake Louise Compound |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15404032
Saskatchewan Crossing Warden Station |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15404034
Lake Louise Overflow |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404037
Mosquito Creek |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404038
Parks Canada Operations Compound |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15404040
Silverhorn |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404044
Forty Mile Creek Landfill |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15404045
Bow River Backwater |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404047
Bow Summit Repeater Tower |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404055
Old Lake Louise Compound |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404058
Old Government Horse Corral |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
15404060
Fairview Lagoon |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404061
Mount Coleman Rest Area |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404062
Bankhead Railsiding |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15404065
Cougar Avenue Dump |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15404067
Banff Golf Course Dump |
Initial testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404069
Red Earth Creek Sawmill |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
15404070
Fairholme Ranch |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404071
Castle Mountain Patrol Yard |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15404072
Banff Springs Golf Course |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
15412001
A1 Waste Transfer Station |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412002
A2 Maligne Lake Dump |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412003
A3 Km 29.7 Maligne Lake Road |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412004
A4 Maligne Lake Road Borrow Pit |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
15412005
A5 Km 35.0 Maligne Lake Road Borrow Pit |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412006
A6 Km 39.1 Maligne Lake Road Borrow Pit |
Initial testing completed. No further action required. | 2013-2014 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412007
A7 Pyramid Bench |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412008
A8 Pocahontas/Hwy #16 Dump/Fiddle Area Dump |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412009
A9 Km 1.6/2.0 Miette Road - Old Pocahontas Dump |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
15412010
A10 Km 10.5 Miette Hot Springs Road Borrow Pit |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
15412011
A11 Km 14.1 Miette Hot Springs Road Storage |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412012
A13 Sleepy Hollow Road / Waste Disposal Site |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15412013
A14 Woodlot Landfill |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412014
A15 Sleepy Hollow Work Camp Site |
Initial testing completed. No further action required. | 2013-2014 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412015
B1 Trade Waste Pit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412016
C1 JNP Maintenance Compound |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412017
C2 JNP Tangle Creek Compound |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412018
Jasper National Park, C3 Townsite Block S Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412019
C4 Miette Sewage Plant Site (Old Maintenance Area) |
Initial testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412066
Sunwapta Borrow Pit |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412067
X1 Beauvert Lake Dump Site |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412068
X2 93A - small pit |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412069
X3 Highway 93 Beauty Creek Borrow Pit |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15412070
X4 Wapiti Winter Camp |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412071
X5 Ranger Creek |
Historical review not required. | 2017-2018 | 01 Identify Suspect Sites | |
15412072
X6 Maligne Lake |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
15412073
X7 Pocahontas Mine (pits) |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
15412074
X10 Highway 16 West, Km 20.6 |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
15412075
Kerkeslin Borrow Pit |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412077
X8 Miette Rd. Km 15 |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412078
X9 Highway 93 Km 15 |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
15412079
Stormwater Outfall |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412080
Snow Dump |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15457001
Parkway Landfill |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15457002
Old Parks Canada Maintenance Compound/Trade Waste Landfill |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15457003
North Camp Landfill |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15457004
South Entrance Landfill |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15457005
Recreational Area Sewage Lagoon |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15457006
Administration Area Sewage Lagoon |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15457008
Recreational Landfill |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15457009
Garage outflow pipe |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15457011
Golf Course |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15457012
Gas/Diesel Filling Station |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15457013
Abatoir Landfill |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15841001
Hay Camp |
Remediation / risk management completed. No further action required. | 2021-2022 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15841002
Garden River Old Dump |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
16103001
McKay Creek Compound |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
16103002
Redstreak Pit |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
16103004
Marble Canyon |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
16103005
Kootenay Crossing |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
16103008
Four Mile Pit |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
16103009
Vermillion Pit |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17800002
Works/Store Compound |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17800003
Combers Beach |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17800005
Sewage Lagoon |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
17800006
Warden's Compound |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17800007
Old Woodlot |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17800008
McLean's Point |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17800009
Truck Compound |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17800011
Radar Hill |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17800012
Transmitter Site |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17800015
Prideaux Island Dump Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17800016
Cape Beal HFDF Site |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
17800017
Former Site of the Long Beach Service Station |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
18730006
Boulder Creek Compound |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730007
Ottertail Pit |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730008
Lumber Yard Dump #3 |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730009
Field Dumpsite #1& #2 |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730010
Field Firehall |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730011
Salt Shed |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730014
Boulder Creek Old Special Waste Storage |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730015
West Gate |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730016
Emerald Intersection |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
18730017
Hoodoo Creek Campground |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18730018
Old Leanchoil Warden Station |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18752001
Rogers Pass Maintenance Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18752002
Mountain Creek |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
18752003
East Gate Complex |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
18752004
Hermit Pit-Salt Storage |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18752005
Beaver Pit - Glacier Industrial Trade Waste Pit |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
18752006
One Mile Sites |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18752007
Old SRAWS Site |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
18753001
Mt. Fidelity |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
18753002
Skunk Cabbage Day Use Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
19958002
SS Klondike National Historic Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
20005001
Palace Grand Theatre Underground Storage Tank |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
20009001
Bear Creek Compound |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
20032001
Court House |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
20033001
Stokes Point |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
20033002
Sheep Creek Warden Station |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
20106003
Haines Junction Research Landfill |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
20106004
Wardens Operational Center |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
20106005
Garage |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
22623001
Rocky Harbour Salt Shed |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
22623002
Glenburnie Salt Shed |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32086001
Former Damage Control School of the Department of National Defense |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
54533001
Government Conference Centre |
Remediation / risk management completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
55380001
Old Port of Montreal - Confinement Cell |
Remediation / risk management completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56454001
St-Mathieu Compound |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
56455002
Petite-Île-au-Marteau Lighthouse |
Initial testing completed. No further action required. | 2013-2014 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56455003
Former Lighthouse and other buildings at Île-aux-Perroquets |
Remediation / risk management completed. No further action required. | 2013-2014 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56482004
Orphan fuel caches |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56482009
Fort Conger Airstrip (site 9) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56482014
Lake Hazen Camp (site 14) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56482015
Ward Hunt Island (site 15) |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56482016
Tanquary Fiord old camp (site 17) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56482017
Tanquary fiord, Runway (site 17A) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56482018
Tanquary fiord, New Camp |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56488001
Park Works Compound |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56488002
Trade Waste Pit |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56488003
Prince of Wales Hotel |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56488004
Waste Disposal Midden (East and West) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56488006
Former Fuel Storage Site (UST) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56488007
Former Barrel Storage |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56491004
030 Copper Island |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56491005
Beban Camp |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56491006
032 Lucky Seven |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56491007
Finger Point |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56491008
073 George Island |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56491009
016 Apex Mountain |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56491010
029 Skincuttle Island |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56505001
Creek at Bennett Lake |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56511001
Husky Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56511002
DEW Line Access Trail |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56522001
G-I-01 |
Long term monitoring completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
56522002
G-I-02 |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56522003
G-I-03 |
Long term monitoring completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
56525017
Dead Mosquito Site (K49 site) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
56525067
K83 Campbell's cabin |
Confirmatory sampling completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0271001
Cap-de-Bon-Désir Lightstation |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
- Version:
- 40