00025805
South side of Chambly canal: lock 1 to railroad bridge |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959007
Site 13.3 |
Confirmatory sampling completed. No further action required. | 2020-2021 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959037
Site 01.3 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |