Site N0014003 - Shell Lake
-
Status
Long term monitoring completed. No further action required. -
Site Status
Closed -
Classification
High Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
Contractual obligation -
Property Type
Non-Federal (Provincial Government)
Site Location
-
Latitude, Longitude
68.304167, -133.482778 -
Municipality
Inuvik, NT -
Federal Electoral District
Northwest Territories
Contaminant Details
Contamination Estimate
-
Cubic Meters
150
The following contaminated media was identified on the site:
Contaminant Type | Medium Type |
---|---|
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Soil |
Additional Information
Seven test pits were excavated and soil samples collected for each. A monitoring well was installed downgradient of the two AST's however insufficient water accumulated in the well for sampling. PHC F1 and F2 exceeded the applicable guidelines in soil samples collected from the vicinity of the AST's north of the burnt house to a depth of 1.6m. At the southeast corner of concrete slab PHC F3 and F4, arsencic, lead and zinc exceeded guidelines at 0.1-0.3m depth. Recommend further test pitting to delineate extents of contamination and determine accurate volumes for remedial option evaluation. Sampling of groundwater, if present, in montitoring well. Obtain groundwater sample from S.E. corner of concrete pad to determine cadmium concentration. Remediation is scheduled for summer 2007. Remediation complete, debris removed from site and contaminated soil taken to aiport soil landfarm. Site can now be archived from the CSMD.
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 34 |
5 km | 313 |
10 km | 503 |
25 km | 3,340 |
50 km | 3,340 |
Summary of Annually Reported Data
Total Expenditures
-
Assessment
$34,980.85 -
Remediation
$176,110.85
Financial/Annual Information
2011-2012
Reporting Organization
Transport CanadaInternal Identifier
N0014003Highest Step Completed
10 Long-Term Monitoring (Optional)Total Assessment Expenditure
$0.00Total Remediation Expenditure
$0.00Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
Yes
2010-2011
Reporting Organization
Transport CanadaInternal Identifier
N0014003Highest Step Completed
10 Long-Term Monitoring (Optional)Total Assessment Expenditure
$0.00Total Remediation Expenditure
$0.00Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
No
2009-2010
Reporting Organization
Transport CanadaInternal Identifier
N0014003Highest Step Completed
09 Confirmatory Sampling and Final ReportingTotal Assessment Expenditure
$0.00Total Remediation Expenditure
$0.00Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
No
2008-2009
Reporting Organization
Transport CanadaInternal Identifier
N0014003Highest Step Completed
09 Confirmatory Sampling and Final ReportingTotal Assessment Expenditure
$0.00Total Remediation Expenditure
$144,552.00Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
No
2007-2008
Reporting Organization
Transport CanadaInternal Identifier
N0014003Highest Step Completed
04 Pre-Classify contaminated site using the CCME National Classification System (optional)Total Assessment Expenditure
$3,422.00Total Remediation Expenditure
$0.00Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
No
2006-2007
Reporting Organization
Transport CanadaInternal Identifier
N0014003Highest Step Completed
04 Pre-Classify contaminated site using the CCME National Classification System (optional)Total Assessment Expenditure
$31,558.85Total Remediation Expenditure
$31,558.85Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
No
- Version:
- 40