00000911
Residential Housing Units Fort Henry Heights |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000912
Former Disposal Area, South of Water Tower, Shirleys Bay |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000913
Baldy Hughes |
Long term monitoring completed. No further action required. | 2018-2019 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00000914
Yorkton |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000916
West Chezzetcook (6401) - Control Tower |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
00000917
Ammo incinerator #2 |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000919
Hangar 10 local 151 drilling in floor of an old shop |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00000922
Old Railhead Site at 8 Wing/CFB Trenton |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00000923
Disposed Brit Prop No 4 Site 14 (6301) West Side of Property |
Historical review completed. No further action required. | 1999-2000 | N Not a Priority for Action | 02 Historical Review |
00000924
Disposed - Brit Prop No 4 Site 14 (6302) - Boiler House |
Historical review completed. No further action required. | 1999-2000 | 02 Historical Review | |
00000925
HMCS Jolliet-Sept-Iles naval reserve |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000926
Firing range A in St-Bruno |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000927
15 Wing Hangar 6 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000928
15 Wing Former Skeet Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000929
15 Wing Hangar 2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000930
15 Wing Landfarm |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000931
Former CANEX |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000932
POL Compound |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000933
15 Wing Landfill |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00000934
Hangar 4 |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00000935
15 Wing Hangar 5 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00000936
Building 36 |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
00000937
CFS Leitrim, Former UST site between buildings #250D & #138 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000938
Rifle range, Former cadet camp, Falardeau |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000939
Metal Dump |
Remediation / risk management completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000940
Connaught Rnge Primary Trng Ctre- 35 Shirley Blvd, B34 AST |
Detailed testing completed. No further action required. | 2023-2024 | 05 Detailed Testing Program | |
00000941
Suffield Experimental Proving Ground (EPG) Project |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000942
N Fuel Cache Site, Cartwright Labrador (Cartwright Airport) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000945
Former fuel Jettisoning area |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000949
CAM-4 SRR (Pelly Bay, Nunavut Territory)- Site Summit |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000950
North Dumpsite |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000951
Vernonburg UXO/Scrap pile |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00000952
Airfield No. 1 |
Long term monitoring completed. No further action required. | 2015-2016 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00000953
Range 16 UXO/Scrap pile |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00000954
15 Wing Former FFTA |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000955
Alpha Range |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00000956
Bravo Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000957
Disposed - Ahern Avenue (302) - Building 3 |
Initial testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000958
Various around Base, screening point for Phase 2&3 |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00000959
Building 70 Community Centre |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00000965
NAD-1 Naden Jr NCM |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000966
Landfill behind stop butt A and B in St-Bruno |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000967
Firing range B in St-Bruno |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000968
Fox-M Radar Site, Hall Beach - Armco Building |
Remediation / risk management completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000969
AA Buildings |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000970
BB Buildings |
Detailed testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00000971
C Buildings |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00000972
D Buildings |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00000973
H Buildings |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00000974
L Buildings |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00000975
M / P Buildings |
Historical review completed. No further action required. | 2014-2015 | 02 Historical Review | |
00000976
Y Buildings |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00000977
Z Buildings |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00000978
Bulk POL Compound |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00000979
Heliport |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00000980
Central Heating Plant |
Detailed testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00000981
Yacht Club |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00000982
Petawawa Research Forest |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000983
Garrison Training Areas |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00000984
Fire Fighting Training Areas |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000985
PCP Ammo Box (Former Ammo Box Dump) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00000986
Dump Site Adjacent to Ottawa River (south-east of Heliport) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00000987
Liquid Waste Dump |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000988
Landfills:locations not confirmed(Sites 6,7,9) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00000989
Golf Course - landfill |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000990
Abandoned construction landfill |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000991
Dry Solid Waste Landfill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000992
Old Dump Site |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000993
Old Landfill Site ( Area M) |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000994
Pesticide Container Landfill and Asphalt Dump |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000995
Dump by Tracks |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000996
Aircraft Fuel Dumping Ground |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00000997
Aircraft boneyard-Ghost Squadron |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00000998
Prince Albert Rifle Range |
Initial testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001000
Wood Hobby Club Site |
Confirmatory sampling completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001001
Skeet Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001002
N118 Compound |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00001003
Q Line POL Compound |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00001004
A20 Compound |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00001005
Mewata Armoury |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00001006
North East Armoury |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001007
Kipp Rifle Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00001008
Ghost River Cadet Camp |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00008332
CPR Lakes |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008334
Uplands Marina, CFSU(O) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008337
Former skeet range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008338
Block 7741 Military Training Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008339
Dundurn B155 |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008340
DRDC Transport Facility Site (CFB Suffield site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008341
Hangar Line Complex |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008342
South PMQ Area |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008343
OPSEE Training Area |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008344
25 m small arms range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008345
Car Club - used oil storage |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008346
Lancaster crash site (1952) - Laurentides Park |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00008347
Cadet Camp Landfill & Firing Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008348
CANEX contaminated site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008349
Abandoned Sewage Treatment Facility(B69/69A) |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
00008350
Various Fort St-Jean sites |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008351
Skeet Range |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008352
Burn Pit (adjacent to Range Warden Compound) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008353
Pickled Sand Storage Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008354
Range and Training Area |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008355
Xanten,Reichwald,Hochwald former butts, Ass& R of cont soils |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008356
Camp Hughes |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008357
Training Area Borrow Pit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008358
General Sir Arthur Currie Bldg |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008359
Oshawa Armoury |
Initial testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008360
HMCS York |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008361
Disposed - Mississauga Armoury |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008362
Scarborough Armoury |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008363
HRR-1 Heals Rifle Range 400yd & Beyond |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008364
NRR-1A Nanaimo Rifle Range 600 yd & Beyond |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008365
VIC-2 Work Point Waterlot |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00008366
Former WTEL/WCE Band Bldg (B46/47) & Pistal Range |
Confirmatory sampling completed. No further action required. | 2021-2022 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008367
Valcartier Garrison Area - Assesment of former firing ranges |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00008368
Groundwater-monitoring perimeter - DND RTA/Shannon limit |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008369
Garage Construction LAV III |
Confirmatory sampling completed. No further action required. | 2012-2013 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008371
BAR-DA1, Liverpool Bay, SRR Site |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008372
LAB-1, Cape Kakkiviak, SRR Site |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008373
LAB-5, Tukialik Bay, SRR Site |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00008374
BAR-B, Stokes Point, SRR Site - Beach |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008376
Multipurpose runway Montreal Garrison north side |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008377
Construction of CSC building Montréal |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00008378
Installation of an APU at building L-193 |
Detailed testing completed. No further action required. | 2013-2014 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00008379
Layout of a salt shelter |
Remediation / risk management completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008380
Construction of B150 Annex St-Jean Garrison |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008381
Moss Park Armoury |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008382
Canadian Forces Staff College |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00008383
Mosley Street Armoury |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008384
Fort York // |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008385
Todd Road Armoury |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008386
Oshawa Airport |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008387
Denison Armoury |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008388
CFS Leitrim South Drainage Ditch |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008389
9 Wing Heavy Equipment Building Site - Parcel #1 |
Detailed testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008390
RRU-14 Royal Roads Asphalt Dump & Former Septic Field |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008391
Pine Street Armoury |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008393
LST 209 deep ocean disposal site |
Initial testing completed. No further action required. | 2010-2011 | I Insufficient Information | 03 Initial Testing Program |
00008394
West Coast Ammunition Dump (Chemical Agents) |
Remediation / risk management completed. No further action required. | 2013-2014 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
00008395
Area 9 Former Small Arms Ranges |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00008396
Area A Former Small Arms Range |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00008397
7 CFSD - gravel parking lot west of B 236 (West Hill) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008398
Underground infrastructure replacement - Montréal Garrison |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008399
Fitness trail |
Remediation / risk management completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008400
100 tons balance |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008401
Former Tank Parking Area - Bivy 9 |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00008402
Firing range(Centre de biathlon Myriam-Bedard) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008403
CATC Meaford Skeet Range |
Detailed testing completed. No further action required. | 2010-2011 | N Not a Priority for Action | 05 Detailed Testing Program |
00008404
Little Dam |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008405
North redoubt CMR St-Jean |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008406
CMR Chapel |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008407
Dunnage Pit |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008408
CFB Gagetown |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008409
Wellington Anti-Tank Range |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008410
Various sites around the Garrison - Phase I/II ESA |
Initial testing completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008413
Skeet Range |
Initial testing completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008420
CFB Petawawa RTA - Old Grenade Range |
Long term monitoring completed. No further action required. | 2018-2019 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00008421
Former Shilo Landfarm |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008422
Old St-Maurice firing range (17 acres portion) |
Confirmatory sampling completed. No further action required. | 2012-2013 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00008423
Cartier Square Armoury,Frmr UST,along drill hall Queen E.Dr. |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008424
Dow's Lake Armoury and Drill Hall |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00008425
Connaught Ranges Range Butt Stop Stockpile |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00008426
CFSU(O) Leitrim, PWGSC Office Area, Building 251. |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008427
DCD School (912) - Gravel Entrance Parking Lot |
Initial testing completed. No further action required. | 2010-2011 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008428
Access ramp and docks repairs Montréal Garrison |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00008429
South Escarpment Stillwaters (SES 1100 series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008430
Jenner Road Trench - Gate 6A |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008431
CFRB Hamilton/HMCS Star |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008433
YA-5 Yarrows B - Lot Parking and Roads |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008434
RRU-13 Royal Roads University YM/YWCA Pool Bldg No.22A |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008435
YA-3 - Yarrows Building 591 |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008436
YA-4 Yarrows Former Shipyard |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008437
COL-19 Colwood Former Sullage Site |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008438
Building VC-028 |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008439
Former Small Arm Range Xanten |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008440
Former Small Arm Range Hochwald |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008441
former small arm range Caen |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00008442
Former Small Arm Range Reichwald |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008443
Col Sherman Armoury |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008444
Firing range St-Jean Garrison |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008446
Woodland at NE.corner of Dugas&Jean-Brillant |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008447
Former small arm firing range G1-G2 |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00008448
Sudbury Armoury |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008449
CFB Shilo: Demolition Range |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00008450
RTA Burial Pit |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008451
Building 200 |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008452
Parc Lemay (former dump) |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008453
Former small arm range Falaise |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008455
Former firing rng Stoney Ridge |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00008456
former small arm range ''I'' |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008457
Quebec Citadel |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008458
YA-6 Yarrows Consolidatn Area Y-Gate |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008460
Range and training Area Characterization - NOT A CS |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008461
Combat area route 1A - RTA |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00008463
South redoubt RMC St-Jean |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008464
Wash baie - Farnham |
Historical review not required. | 2010-2011 | 01 Identify Suspect Sites | |
00008465
Construction of hospital-St-Jean Garrison |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008466
200 places prkng Mtl Garrison |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008467
FOB Atlantic dump |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008468
S.DRDC-other former firing rngs |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008469
South Complex |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008470
Admin and Experimental Complex |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008471
Old UXO destructn site St-Maurice Proof rng |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00008472
HD-4 Extension |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008473
Extension of Kitchen at Mega |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008474
Extension of Gymnasium St-Jean Garrison |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008475
Expension of prkg lot at H104 St-Jean Garrison |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008476
Amiens Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008477
Reichwald Sm. Arms Rifle Rng |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008478
Somme Small Arms Rifle Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008479
Flanders Sm. Arms Rifle Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008480
Ardennes Sm. Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008481
Old Vimy Sm. Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008482
Old Amiens Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008483
Old Mons Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008484
Langemark Sm. Arms Rifle Rng |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00008485
Old Reichwald SmArms Rifle Rng |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008486
Dieppe Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008487
Vimy Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008488
Batoche Sm. Arms Rifle Rng |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008489
Salisbury Sm. Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008490
Alexandra Sm. Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008491
Former landfill north of 195 Ave |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008493
BAF-2 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00008494
CAM-1A |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 05 Detailed Testing Program |
00008495
CAM-B |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008497
FOX-1 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00008498
FOX-A |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00008499
Cedar Springs Rifle Range & Danger Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008500
Winona Rifle Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008501
DRDC Pile at Landfarm |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008502
Former Air Field |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00008505
Test banch building 15 |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008506
Building E173 extension |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00008507
Extension of kitchen in Farnham |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00008508
Former firing range Verrières |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00008509
Former firing range Marker shelter (1750 m) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008510
Former firing range Marker Shelter (1000m) |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008511
former grenade range Château F |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008512
Former firing range G1 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008513
Former firing range G |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00008514
Former grenade range F |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008515
former firing range G3 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008516
Dugway Burn Site |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008517
Range Control Trenches |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008518
Drake Wood Trench |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008519
Easy Lake Site |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008520
Mile Square |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008521
Willow Park (4327) - TEME North Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008522
Willow Park (4328) - Armoury South Site |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00008523
Troy Armoury - Maintenance Building |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00008526
Base POL - B401 Korea Rd |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008527
Ammunition Compound Burial Pit |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008528
Dundurn FFTA |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008529
MA-1a Masset Skeet Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008530
COL-20 Colwood F-Jetty Intertidal&Prkg Lot |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008532
E20 - Garage Vernon Military Camp |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008535
Sussex Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008536
Gloucester Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008537
Lethbridge Airport CF18 Crash Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008538
CF18 Crash Site on AB Gov Land |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008539
B184-Former APU for Steam Plant |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008540
Underground services M1&M70-St-Hubert |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 05 Detailed Testing Program |
00008541
New ATESS Refinishing Shop |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008542
Old garage at building B32 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008543
Former Ammo Dump, Bernatchez Rd. |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008544
Quarter project-St-Jean garr |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008545
Road East of gate 9 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008550
PIN-1BG Croker River |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008556
Former firing range P |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008557
Beauceville armoury |
Remediation / risk management completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008558
Beauport armoury |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008559
Megantic Lake Armoury |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 09 Confirmatory Sampling and Final Reporting | |
00008560
Matane Armoury |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00008561
Trois-Rivières Armoury |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008562
Stream draining former DDT site in Farnham |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008563
Rebuilding of our underground infrastructure CMR-St-Jean |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00008564
Water filtration plnt of city in CMR St-Jean |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00008565
Former POL/JTFW Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008566
CFB Suffield RTA Characterisation |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00008567
PA Warehouse |
Historical review not required. | 2018-2019 | 01 Identify Suspect Sites | |
00008568
RCSU Warehouse |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00008569
TMFRC |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008570
CFRC (City Centre) |
Historical review not required. | 2010-2011 | 01 Identify Suspect Sites | |
00008571
CFRC (Yonge Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00008572
Etobicoke Armoury |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00008573
CFRC (John Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00008574
Aurora Armoury |
Initial testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008575
DCCCA Warehouse |
Historical review not required. | 2018-2019 | 01 Identify Suspect Sites | |
00008576
CN Tower (301 Front Street) |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
00008577
Grenade Range (Area A) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008578
Wood Tower Gun Site (Area 2) |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008579
Howsam Impact Site (Area B) |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00008580
WP-4k Work Point Boat Club IL/CL |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008582
Sector 6 demolition site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008583
Putting drain arnd bldg L-42 |
Historical review not required. | 2010-2011 | 01 Identify Suspect Sites | |
00008584
B216 - Airfield |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00008585
Tarmac - St-Hubert |
Historical review not required. | 2010-2011 | 01 Identify Suspect Sites | |
00008586
Along the Jacques Cartier street - CMR |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00008587
Entry barrier of Jacques Cartier Street - CMR |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00008588
Behind Kitchen (B155) - Montreal garrison |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00008591
DY-8 Dockyard IL Bldg 8 - Former HAZMAT Storage Area |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008592
DY-9 Dockyard South of Bldg 101 |
Initial testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008593
DY-32 Dockyard Signal Hill Off. Mess & Prk Lot E of Bldg 520 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008596
NAD-9 Naden North Southeast Bldg 97 |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008597
DY-11 Dockyard RL/PL Shoreline Fill West of Bldg 109 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008598
DY-12 Dockyard RL/PL Shoreline Fill South of Bldg 106 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008599
DY-13 Dockyard RL/PL Former MARPAC Garage - Bldg 102 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008600
DY-14 Dockyard RL/PL Sea Trng Bldg38, Bldg260 Frmr Ash Dump |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008601
DY-15 Dockyard IL Bldg 36&266 Frmr Heat Plnt/VehicleService |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008602
DY-18 Dockyard IL Bldg 27 - Former Coal Stores |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008603
DY-19 Dockyard IL Gym- Former Fuel Shed |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008604
DY-20 Dockyard IL Fire Prevent Branch Frmr UST Bldg 11&188 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008605
DY-21 Dockyard IL Shoreline West of Bldg 218 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008606
DY-22 Dockyard IL Bldg 20 & 21 Former Paint/Oil Stores & UST |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008607
DY-23 Dockyard IL Boundary Rd - Former Metallurgy Lab |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008608
DY-24 Dockyard RL/PL PMQ Residences |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008609
DY-25 Dockyard IL Bldg 199 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008610
DY-26 Dockyard RL/PL Bldg 199 A-C - Former POL Storage |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008611
DY-27 Dockyard Signal Hill Current Fuelling Facility |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00008612
DY-28 Dockyard Signal Hill Bldg 506 - Fmr Oil & Paint Stores |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00008613
DY-29 Dockyard Signal Hill Bldg 504 Fmr Mechanic Repair Shop |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00008614
DY-30 Dockyard Signal Hill Bldg 516 - Former Garage |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008615
DY-31 Dockyard Signal Hill Fmr Fuelling Facility Canteen Rd |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008616
NAD-10 Naden South - East of Admirals |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008621
NAD-15 Naden North PMQ Housing |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008622
NAD-16 Naden North Playing Fields |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008625
RP-4 Rocky Point Bentinck Island Active Site |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008626
RP-10 Rocky Point Bldg 36A Steam-out Hut- Former/Current AST |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008627
RP-11 Rocky Point Former Boat Shed & Fuel Storage |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008628
RP-12 Rocky Point Vehicle Maintenance Garage |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008629
RP-13 Rocky Point Former USTs at Private Married Quarters |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008630
RP-14 Rocky Point Former Landfill Adjacent to Pedder Bay |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008631
RP-15 Rocky Point Whirl Bay |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008632
RP-16 Rocky Point Pedder Bay Boat Jetty at Mason Point |
Remediation / risk management completed. No further action required. | 2021-2022 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008633
DY-16 Dockyard IL Dry Dock - Former subsite DY-4h |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008634
DY-17 Dockyard IL FMF CB Eng Bldg 49, Frmr subsite DY-4f |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008635
Petit Desert range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00008636
Past Landfill activities (A2) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008637
Past landfill activities - C |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008638
Past landfill activities (zone D) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008641
COL-23 Colwood Bunker 8 |
Initial testing completed. No further action required. | 2019-2020 | 03 Initial Testing Program | |
00008643
COL-25 Colwood Bank of Storm Water Management Ponds |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008644
COL-26 Colwood Section of Wilfert Rd near F-Jetty |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008645
COL-27 Colwood Laydown Area near Bldg 205 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008647
COL-29 Colwood Vehicle Compound |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 05 Detailed Testing Program |
00008648
North Bay Former FFTA |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00008649
COL-30 Colwood Joe’s Creek East of Wilfert Rd |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008650
COL-31 Colwood Bldg 65 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00008651
COL-32 Colwood Bunker 37 and Propane ASTs |
Historical review completed. No further action required. | 2019-2020 | 02 Historical Review | |
00008652
COL-33 Colwood Bunkers 34, 35 and 36 |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008653
COL-34 Colwood Aggregate Storage Yard (Active Site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008654
COL-35 Colwood Historical Waste West of Bldg 85 |
Historical review completed. No further action required. | 2019-2020 | 02 Historical Review | |
00008655
COL-36 Colwood Helicopter Pad and Parking Lot |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008656
COL-37 Colwood Smart Island |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008657
COL-38 Colwood McCarthy Island |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008658
COL-39 Colwood Storage Supply Warehouse and Parking Lot |
Historical review completed. No further action required. | 2019-2020 | 02 Historical Review | |
00008659
COL-40 Colwood North Western Bank of Dunn's Nook |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008660
COL-41 Colwood Roads |
Historical review completed. No further action required. | 2020-2021 | 02 Historical Review | |
00008661
BAR-1, Komakuk Beach |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008662
BAR-3, Tuktoyaktuk |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008663
BAR-4, Nicholson Peninsula |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008664
PIN-1BD, Keats Point |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008667
FOX-2, Longstaff Bluff |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008668
FOX-4, Cape Hooper |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008669
FOX-5, Broughton Island |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008671
Former CFS Sydney, NS, Pinetree Landfill |
Confirmatory sampling completed. No further action required. | 2022-2023 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008672
4 Wing Hawk Crash Site - June 10, 2011 |
Confirmatory sampling completed. No further action required. | 2017-2018 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008673
CFB Shearwater (204C) - Former Arrestor Gears |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008674
LAB-6 |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008675
FOX-CA |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008676
CAM-CB |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008678
CAM-A3A |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008679
PIN-EB |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008680
PIN-DA |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008681
PIN-CB |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008682
PIN-2A |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008683
Former Grenade Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008684
Former Demolition Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008685
Encroachment SE Corner of Wainwright RTA |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008686
Ammo dump sector 10 |
Historical review not required. | 2017-2018 | 01 Identify Suspect Sites | |
00008687
Sector 2 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008688
Timmins Armoury |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00008689
Rouyn-Noranda Armoury |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008690
Rouyn-Noranda Armoury - parking and POL & Hazmat storage |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008691
Burwash CFTA |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008692
Termoli impact area |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00008693
WP-11 Work Point Former USTs at PMQs |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008694
Montreal soccer pitch |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008695
Improvement of roads 2A, 2AA, 2B-1 et 4F Farnham |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008696
Construction of new sleeping quarters - St-Hubert |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008697
COL-42 Colwood |
Confirmatory sampling completed. No further action required. | 2017-2018 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008698
COL-43 Colwood |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008699
CFHA - 85-87 Restigouche Road |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008700
Connaught Skeet Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 06 Classify the site using the CCME National Classification System | |
00008701
B314 parking lot |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008702
CFHA - 29 Bennett Road |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 05 Detailed Testing Program |
00008703
CFHA - 29 Clark St |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008704
CFHA - 23 Clark St |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 05 Detailed Testing Program |
00008705
CFHA - 72,74,76,78 Assiniboine St |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 05 Detailed Testing Program |
00016474
Nanisivik (Strathcona Sound) (3rd party assessed) |
Detailed testing completed. No further action required. | 2016-2017 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00024805
CFHA - 24 Sarcee Crescent |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 05 Detailed Testing Program |
00024806
Former B164/79 and via Venus |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024807
St. Hubert Legacy Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024808
Calgary (Former Sarcee Training Area Tract 1 & 2) |
Historical review completed. No further action required. | 2019-2020 | 02 Historical Review | |
00024809
DY-10 Dockyard Signal Hill Building 575 & Surrounding Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024810
Hangar 5 & 6 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024811
Shearwater (247) Abandoned Transformer Shed |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024813
Former Air Traffic Tower Septic Field |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00024814
Historic Annual ARFFV Testing Area, Hotel Taxiway |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00024817
PLER Site Release |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024819
COL-FOD Colwood Former Fuel Oil Depot (FOD) North Area |
Remediation / risk management completed. No further action required. | 2021-2022 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024821
Toronto Training Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024822
Area 21 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024823
Austere Range R9A |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024824
Austere Range R9B |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024825
Battle Runs 12A and 15A |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024826
Bronze Range (30 lines) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00024827
Palladium Range |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00024828
CFHA - 22 Restigouche Road North |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024829
CFHA - 51 Dakota Drive |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024830
CFHA - 55 Dakota Drive |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00024831
CFHA - 149 Wilmot Circle |
Remediation / risk management completed. No further action required. | 2016-2017 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024832
CFHA - 165-167 St. John Ave |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 05 Detailed Testing Program |
00024833
CFHA - 5 Oneida |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024834
Tanks K1090 and K 1091 near Building 102 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00024835
Building M-210 Former UST |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024836
Former Ditch at 9 Hangar |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 03 Initial Testing Program |
00024837
Anglin's Bay |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024838
Niagara-on-the-Lake Tank Training Area |
Detailed testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024839
Former UST, Former B153 |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00024840
Building B-9 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024841
Building Mg2 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024842
South Boundary Demolition Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024843
B101 - Electrical Mechanical Engineering |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024844
B163 - Fire Hall |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024845
Building B-12 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024846
Fire Hall, Building 85 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00024847
FOL - Maintenance Transport Shop, 76 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024849
4 Wing Fire Hall, Blding 4 |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024850
Transport Office (former EME shop), Blding 5 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024851
15 Wing EME Shop Test Site 1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024853
15 Wing Fire Hall Test Area 1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024854
Fire Pumps SW of H6 |
Detailed testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024856
Fire Hall, Building 19 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00024857
17 Wing Former B87 EME Shop |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024858
17 Wing B88 Fire Hall |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024859
17 Wing NW of Log Building 129 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024864
Dundurn Fire Hall |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024869
Fuel Oil Spill 13 Hgr |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024871
RES-1 MAG |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024872
DEV-2 MAG |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024873
PHL-260 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024874
Dundurn Rail Spur Line |
Initial testing completed. No further action required. | 2019-2020 | 03 Initial Testing Program | |
00024875
17 Wing Former Canex |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00024876
22 Wing Underground Complex |
Historical review completed. No further action required. | 2017-2018 | 02 Historical Review | |
00024877
22 Wing Building 45 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024878
Cratère Training Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024879
CFHA - 81 Miramichi Road |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024880
CFHA - 128 Miramichi Road |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00024881
CFHA - 111 St. John Avenue |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024882
CFHA - 140 St. John Avenue |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024883
CFHA - 203 MacKenzie Avenue |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024884
CFHA - 3 Laurier Drive |
Confirmatory sampling completed. No further action required. | 2017-2018 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024885
CFHA - 30 Tweedsmuir Court |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 05 Detailed Testing Program |
00024886
CFHA - 41 Mohawk Street |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00024887
CFHA - 58 Mohawk Street |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00024888
CFHA - 61-63 Mohawk Street |
Historical review not required. | 2020-2021 | 01 Identify Suspect Sites | |
00024889
CFHA - 9 Cowichan Drive |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024890
PLER Spill 2015 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024891
Conair Crash 2015 |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024892
15 Wing 25 m Range |
Detailed testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024893
Highway 26 |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00024894
Building B19 |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024895
CFHA - 42 Inchby Drive |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024896
CFHA - 57 Mohawk Street |
Remediation / risk management completed. No further action required. | 2020-2021 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024897
CFHA - 14 Pomona Avenue |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024898
CFHA - 20 Clark Street |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024899
CFHA - 97 St. Lawrence Avenue |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024900
CFHA - 109 St. John Avenue |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024903
Fire Fighting Training Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024904
Guelph Armoury |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024905
North Bay Former UST |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00024906
1941 April Lake Hurrican Crash Site |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024907
CFHA - 236 Mackenzie Avenue |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024908
CFHA - 13 Comox Street |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024910
CFHA - 66 Maclaren Drive |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024911
CFHA - 99 St. Lawrence Avenue |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024912
Former Building B6 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024913
Shearwater Fire Hall Storage Shed (SH40) (Site 253) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024914
Shearwater CC-144B Challenger Crash Site (Site 249) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024915
Shearwater Former FFTA (North Delta Taxiway) (Site 251) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00024917
Shearwater FFTA (Alpha Taxiway) (Site 250) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024918
Shearwater Aircraft Burn Area (Site 252) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024919
Utilily poles storage |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024920
Shearwater Sea King Crash Site (Site 248) |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024921
Argus Waste Drop Zone |
Remediation / risk management completed. No further action required. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024922
Asbestos Disposal Site |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024923
19 Wing Hangar 7 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024924
Building PC-317 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024925
Building TA-1 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024926
Former Building K-35 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024927
22 Wing PFAS Monitoring |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00024929
ALD-17 Aldergrove Emergency Generator Tank Spill |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024930
ALD-3 Aldergrove Former CANEX Gas Station |
Initial testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024931
FOX-3 Dewar Lakes, Nunavut |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024932
WP-3d Work Point Former Outdoor 25 Yard Firing Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024933
WP-12 Work Point Hazardous Materials Storage Building 1126 |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00024936
CFHA - 119 St. Lawrence Avenue |
Initial testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024937
CFHA - 125 St. Lawrence Avenue |
Initial testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024938
CFHA - 145 Wilmot Circle |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024939
CFHA - 155 St. Lawrence Avenue |
Remediation / risk management completed. No further action required. | 2020-2021 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024940
CFHA - 157, 159, 161, 163, 165, 167 St. Lawrence Avenue |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024941
CFHA - 5 Carleton Street |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024943
CFHA - 11 Comox Street |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024944
CFHA - 13 McElroy Crescent |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024945
CFHA - 17 McElroy Crescent |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024946
CFHA - 59 Mohawk |
Remediation / risk management completed. No further action required. | 2020-2021 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024947
B0008 Trench |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024948
Kapyong Site |
Confirmatory sampling completed. No further action required. | 2023-2024 | 09 Confirmatory Sampling and Final Reporting | |
00024949
RP-3c Rocky Point White Phosphorus Active Disposal Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024950
15 Wing B87 Former Waste UST |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024951
John Foote Armoury |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024952
Fire Fighting Training Area #2 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024953
Roads and Grounds Storage Yard |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024954
Groundwater Recirculation Discharge Station Aerodome (254) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024955
MA-3 Masset Former Operation Centre |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00024956
MA-2 Masset Golf Course Parking & Maintenance Bldg |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024957
MA-4 Masset Radio Communications Center |
Detailed testing completed. No further action required. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00024958
FOX-MAIN Hydrocarbon Plume |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024959
CAM-MAIN Hangar Legacy Hydrocarbon Plume |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024960
South RV Compound and P-151 Compound Area |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00024961
Former Gas Station |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024962
Former PCB Storage Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024963
Contamination from Maintenance Buildings 231 & 233 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024964
B126 Refinishing Shop |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024966
CFHA - 25 Comox Street |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024967
CFHA - 4 Clark Street |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024968
CFHA - 22 Cowichan Drive |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024969
CFHA - 7 Dakota Drive |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024970
CFHA - 22 Comox Street |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024971
CFHA - 36 Restigouche Road |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024972
Radar PAR |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024973
Generator new location B244 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024974
AH-7 Albert Head Northwest Power Generation Region |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024975
AH-8 Albert Head Sewage Lagoon |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024976
AH-10 Albert Head Energetics Testing & Shoreline Region |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024978
AH-9 Albert Head Gun Embankments, Central Uplands Region |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024979
NMC Bunker Nanaimo Military Camp |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024980
VC-301 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024981
4 Wg Canex Gas Station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024982
AH-1d Albert Head Septic Tank & Field |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024983
AH-1g Albert Head Abandoned Grease Trap |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024984
ALD-4 PMQ Heating Oil USTs |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024985
ALD-5 Former Mobile Kitchen |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024987
ALD-7 Bldg 020 - Power Plant |
Initial testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024988
ALD-8 Bldg 022 - Main Operations |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024990
ALD-11 Former Bldg 003 |
Initial testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024991
ALD-12 Antenna Field |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024995
ALD-16 Waste Disposal Area |
Initial testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024996
VA-3 Vehicle Service Bay (Rooms 92, 93,94, 95) |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00024997
VA-4 Former 9,092 Litre UST |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00024998
VA-5 Former Armourers Workshop and Ammunition Vault |
Historical review completed. No further action required. | 2021-2022 | 02 Historical Review | |
00024999
VA-6 Three fueling tanks and the gas dock |
Initial testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025000
MAT-2 PMQ Heating Oil USTs |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025004
MAT-6 Sewage Treatment Facility |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025005
MAT-7 Former Septic Field |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025006
MAT-8 Antenna Towers and Arrays |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025007
MAT-9 Former building complex |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025008
MAT-10 Northwest corner of the property |
Initial testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025009
MAT-11 Main Operations Complex |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025012
HRR-5 Heals Rifle Range Main Compound Training Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00025013
HRR-6 Heals Rifle Range Bldg 1061 Former POL Compound |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
00025014
HRR-8 Heals Rifle Range Former 400-1000 yrd Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025015
19 Wing PFAS Sitewide |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00025016
8 Wing 10 Hangar |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025017
Mech Eng Fuel Spill R75/R69 |
Long term monitoring completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
00025018
Former above ground tank B117 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025019
DY-33 Signal Hill |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025020
North Bay POL Shed Site |
Historical review not required. | 2019-2020 | 01 Identify Suspect Sites | |
00025021
CFHA - 1 Dunn Cresecent, Oromocto, NB |
Remediation / risk management completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025022
CFHA - 29-31 Bonar Law Av, Oromocto, NB |
Remediation / risk management completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025023
CFHA - 18 McElroy Crescent, Oromocto, NB |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025024
CFHA - 16 McElroy Crescent, Oromocto, NB |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025025
CFHA - 15 McElroy Crescent, Oromocto, NB |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025026
CFHA - 14 McElroy Crescent, Oromocto, NB |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025027
CFHA - 6-10 Fowlers Court, Oromocto, NB |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025028
CFHA - 6-7 Dunn Court, Oromocto, NB |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025029
HRR-7 Heals Rifle Range Soil Storage Near Pistol Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025030
Goose Bay Site Wide PFAS |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00025031
PB-5 Pat Bay hangar wash pad |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025032
DY-RL Signal Hill frmr PMQ ASTs |
Initial testing completed. No further action required. | 2019-2020 | 03 Initial Testing Program | |
00025033
PB-6: Pat Bay Hanger 17 fmr POL Shed/UST |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025034
CFHA - 45 Comox Street |
Initial testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025035
CFHA - 127 St. Lawrence Av. |
Remediation / risk management completed. No further action required. | 2020-2021 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025036
Pond Site B225 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025037
Embankment - Hammer Head 36 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025038
Juliette Tank |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025039
Tarmac H7 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025040
Former Voodoo Engine Test Site |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025041
Former Airport Road |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025042
CFB Edmonton Site-Wide PFAS |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00025043
Wainwright Site-Wide PFAS |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00025044
CFB Suffield Site-Wide PFAS |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025045
MH-5 MARY HILL FORTIFICATION LANDFILL |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025046
MH-6 MARY HILL SEARCHLIGHT AND POWERHOUSE (MH-1027) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025047
Former Small Arms Incinerator |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025048
4 Wing Cold Lake Site Wide PFAS |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025049
14 Wing Greenwood Site-Wide PFAS |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00025050
West of 1 Field Ambulance Building |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025051
15 Wing Moose Jaw Site-Wide PFAS |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025052
17 Wing Winnipeg Site-Wide PFAS |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025053
9 Wing Gander Site-Wide PFAS |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025054
CF Ammunition Depot Bedford Site-Wide PFAS |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025055
Camp Utopia and Ranges |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025056
Dundurn Hardstand 6 Site |
Initial testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025057
CFHA - 10 Armstrong Court, Oromocto, NB |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025058
CFHA - 28 Comox Street, Oromocto, NB |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025059
CFHA - 29 Shirley Court, Oromocto, NB |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025060
CFHA - 50 Dakota Drive, Oromocto, NB |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025061
CFHA - 59 Restigouche Road, Oromocto, NB |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025062
Former Underground Tank B215 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025063
Curtis Road Reservoir |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025064
MH-7 MARY HILL FORMER NW BURN SITE |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025072
RRU-15 Boathouse Construction Soil Containment Cell |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025073
19 Wing EOD Site |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025074
Garrison Phase I ESA |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025075
WP-13 Work Point Road Filll Near CRDD WWTP |
Historical review not required. | 2023-2024 | 01 Identify Suspect Sites | |
00025077
8 Wing Site Wide PFAS |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00025078
PB-7 PAT BAY CONTAMINATION FROM OFFSITE ASTs/USTs |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025079
HRR-9 HEALS RIFLE RANGE 100 yd PISTOL RANGE & Beyond (Active |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025080
NRR-1C Nanaimo Rifle Range 25m Pistol Range & Beyond ACTIVE |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025081
12 Wing Shearwater PFAS Site-Wide |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00025082
22 Wing Behind Building 14 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00025083
CFHA – 9-11 Oneida Street, Oromocto, NB |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025084
CFHA - 134 St. John Avenue, Oromocto, NB |
Remediation / risk management completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025085
CFHA - 6 McElroy Crescent, Oromocto, NB |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025086
19 Wing Heritage Park |
Confirmatory sampling completed. No further action required. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00025087
Canadian Ranger Patrol Group Former Small Arms Range - Burgeo |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025088
Transport Fleet Compound (O-95) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00025089
22 Wing MTO Dump |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025090
Canadian Rang. Pat. Grp. Former Small Arms Range - Channel |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025091
Training Area C2 Drainage |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00025092
PLER Metal Dump |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025093
CFHA - 48 Inchby Drive, Oromocto, NB |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025094
CFHA - Huron Street, Oromocto |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025095
Garrison Petawawa |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025096
Kamloops Crash - May 2020 |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025097
CFHA - 191 St. Lawrence Avenue, Oromocto |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025098
CFHA - 20 Oneida Street, Oromocto |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025099
CFHA - 48 Dakota Drive, Oromocto |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025100
19 Wing Temp FFTA |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025101
TCE au site du QRA |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025102
CFHA - 24 Comox Street, Oromocto |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025103
Dundurn PFAS Sitewide |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025104
408 Sqn Parking Lot |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025105
5 CRPG - Rocky Harbour (Cow Head) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025106
5 CRPG - Former Small Arms Range - Terra Nova |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025107
5 CRPG - Former Small Arms Range - Port Saunders |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025108
HMC Dockyard Halifax PFAS Sitewide |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025109
CFHA - 48 Carleton Street, Oromocto |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025110
Belmont Park |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025111
MH-8 – Former Military Infrastructure and Activities (RL/PL) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025112
5 CRPG Former Small Arms Range - Hermitage |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00025113
5 CRPG Former Small Arms Range - Bonavista (Port Rexton) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00025114
Alert - Unauthorized Firing Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025115
5 CDSB Gagetown PFAS Site-Wide |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025116
Dundurn Range & Training Area |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025117
5 Wing Goose Bay Mosquito Range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025118
19 Wing 25m Outdoor Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025120
5 Wing Goose Bay Dakota Range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025121
DND Colwood - PFAS Sitewide |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025122
CFHA – 76 MacLaren Drive, Oromocto |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025123
Chilliwack Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025124
Area 14A |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025125
Athéna Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025126
Bushlanes |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025127
Apollo Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025128
Meaford - Area 3 Small Arms Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025129
Shilo Main Impact Area (MIA) |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025130
Edmonton - Small Arms Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025131
Old Castle Grenade Range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025132
14.5 Tow Tracking Range: SRIA |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025133
Argus Impact |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025134
Drummond Demolition Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025135
Enniskillen Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025136
Verdun & Marnes Grenade Range Complex |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025137
Hersey Impact |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025138
Dingee Wood |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025139
Lawfield Impact |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025140
Rockwell Impact |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025141
Sheriff Lake |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025142
Mountain Impact |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025143
Mill Hill, NB |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025144
Old Summerside EOD Range, PEI |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025145
Abacus Range |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025146
Petawawa Main Impact Area (MIA) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025147
Petawawa - Area 9 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025148
Meaford Main Impact Area (MIA) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025149
5 CRPG Former Small Arms Range – Cartwright |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025150
5 CRPG Former Small Arms Range – Churchill Falls |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025151
5 CRPG Former Small Arms Range – Port Hope Simpson |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025152
5 CRPG Former Small Arms Range – Red Bay |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025153
5 CRPG Former Small Arms Range – Black Tickle |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025154
Alma Communications Tower |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025155
Heliport Gagetown (L4/32) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025156
Building K-45 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025157
F-Lines |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025158
Camp Petersville |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025159
Military History Museum Gagetown |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025160
MH-9 – Former Military Infrastructure and Activities (IL) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025162
DND Rocky Point – PFAS Sitewide |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00273001
CFS ST John's (4710) - Cambrai Rifle Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00348002
CFS St John's (5110) - Parkers Pond Transmitter Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00348003
Parker's Pond Radio Site (5111) - Antenna Site (Herbicides) |
Initial testing completed. No further action required. | 1998-1999 | 03 Initial Testing Program | |
00418001
Disposed - 20 Amherst Heights (6101) - AST at PMQ |
Historical review completed. No further action required. | 1996-1997 | N Not a Priority for Action | 02 Historical Review |
00418002
CFS St John's (4801) - 200 Compound |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00418003
Disposed - CFS St John's (4802) - 300 Compound. |
Confirmatory sampling completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00418004
Disposed - CFS St John's (4803) - B815 |
Initial testing completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00418005
Disposed - CFS St John's (4804) - 400 & 500 Compounds - PMQs |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00418006
Disposed -CFS St John's(4805) Lower Compound -Motor Storage |
Initial testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00912001
Corner Brook Armoury |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00961001
CFS Leitrim Sludge Pits(Disposal Area) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00961002
9 Wing 25m Firing Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00961003
OLD UST/POL Shed CFS Leitrim |
Confirmatory sampling completed. No further action required. | 2022-2023 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00961004
Drum Area West of Leitrim |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00961005
Leitrim Lagoon and Outfall (North Drainage Ditch) |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978001
Former Dump Site |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978002
9 Wing POL Compound |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978003
Bldg 123 Auto Hobby Shop |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978004
9 Wing B109 Wing Fire Hall |
Detailed testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978005
Bldg 14 Utilities Power Plant |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978006
9 Wing B16 Central Heat Plant (CHP) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978007
9 Wing Bldg 21 POL Pumphouse |
Detailed testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978008
POL Compound Contaminated Soil Pile |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978009
Combined Outfalls - 1,2 & 3 & Drainage Ditch by FFTA |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978011
Bldg 17 MSE Garage |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978012
Bldg 108 Storage and Maintenance |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978013
Bldg 86 Wing Photo |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
00978014
9 Wing B107 103 Rescue Unit |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978015
9 Wing FFTA |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978016
Bldg 116 Guardhouse |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00978017
1 Hangar 103 Rescue Unit |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978018
Bldg 110 Wing Supply |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978019
Bldg 125 Former WCE Headquarters |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978020
9 Wing B115 Former CANEX Site |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978022
Bldg 36 Curling Club |
Remediation / risk management completed. No further action required. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978023
Bldg 19 MSE Stores Quansit Hut |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978024
9 Wing B106 Former CANEX site |
Detailed testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978027
Scrap Compound / Supply Storage Area |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00978028
Old Entrance / Guardhouse |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978029
Building 108 Hoist |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00980001
Old Navy Site - Operations Site |
Detailed testing completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00980012
Old Navy Site - Shooting Range |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
01008001
Grand Falls Armoury Former UST Location |
Remediation / risk management completed. No further action required. | 2015-2016 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01008002
Grand Falls Armoury POL Drum Storage Area |
Remediation / risk management completed. No further action required. | 2022-2023 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822018
Canadian Side & Northside |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01822043
Hydrant Area Fuel Plumes (HYD9010) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822076
Main Base and Civil Aviation Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822085
Upper Tank Farm - Fuel Recovery Site (UTF 4000 Series) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
01822086
Survival Tank Farm (STF 3000 Series) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01822087
South Escarpment Landfills (SES 1000 Series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822094
Lower Tank Farm (LTF 2000 Series) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02193002
Summerside Armoury |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02266002
Barrington - GATR Site |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02267011
CFS Barrington |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02267022
Barrington - OPS Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02559001
Disposed - Digby (9101) - Victoria Beach |
Historical review completed. No further action required. | 1999-2000 | N Not a Priority for Action | 02 Historical Review |
02561001
Granville Range-Granville Ferry |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02677001
CFS Mill Cove (2701) - Antenna Field |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
02677002
CFS Mill Cove (2702) - Older POL Shed |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
02677004
CFS Mill Cove (2703) - Reciever/Control Building (AST) |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
02714002
Transmitter Site |
Initial testing completed. No further action required. | 2002-2003 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02717001
Former Sludge Pit Runway 26 - Greenwood |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02717002
Former Sludge Pit Adjacent Golf Course - Greenwood |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02717004
POL Compound - Greenwood |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
02717006
MADD Shack Dump Area-Greenwood |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717007
Active EOD Range - Greenwood |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
02717008
Bldg. 110 Community Centre - Greenwood |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02717010
CE Storage Area - Greenwood |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02717012
AMSE paint shop floor drain, Hangar 4 - Greenwood |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
02717013
Armament Area - Greenwood |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
02717015
Hangar 5 - Greenwood |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717073
Sewage Treatment Plant POL Storage |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
02717082
25 Yard Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717083
Heavy Machinery Practice Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02717085
7 Hangar Floor Drains |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02717086
Engine Test Cell |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717087
POL Refuelling Area |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02717092
Tank 56 MP Guardhouse |
Remediation / risk management completed. No further action required. | 2014-2015 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717095
Canex Service Station 8209 |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717097
Tank 55 Canex Station |
Initial testing completed. No further action required. | 2008-2009 | 03 Initial Testing Program | |
02717099
UST #40 B-125 Water Pumphouse |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717101
UST West of Hangar 10 |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717103
Former Hangar 1 |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02717105
Operation Area Soils & GW (11 Hgr) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02717114
Battery Disposal Sump Hangar 8 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02717116
Hornell Centre Day Tank |
Remediation / risk management completed. No further action required. | 2016-2017 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717117
Dwight Ross School |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02717118
RC Gordon School |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
02717125
Former Skeet Ranges |
Remediation / risk management completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717129
Former Tank Location Hangar 2 |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
02717131
Hangar 9, Former Tank 33 |
Historical review completed. No further action required. | 2002-2003 | 02 Historical Review | |
02717145
Various Wet Sumps |
Historical review completed. No further action required. | 2002-2003 | 02 Historical Review | |
02739001
Aldershot Landfill/Former Incinerator |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739002
Mill Pond and Sewage Lagoons - Aldershot |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
02739003
Former Garage (B46) and Septic Tank Area - Aldershot |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02739004
Former Photo Lab (B95) - Aldershot |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739006
Active Grenade Range - Aldershot |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739007
Active 100m Range - Aldershot |
Initial testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 03 Initial Testing Program |
02739008
Active 600m Range - Aldershot |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739010
Demolition Range - Aldershot |
Initial testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739011
Former 500yd Range - Aldershot |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739012
Meadowview Landfill - Aldershot |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02739013
Rocket Range |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
02739014
Former Building 37 Aldershot |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
02739022
Former Revolver Range - Aldershot |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739026
Former EME Vehicle Maintenance Garage and Sewer - Aldershot |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739027
UST Building 209 - Aldershot |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739030
Former Vehicle Compound (B140) Aldershot |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
02739040
Unidentified Range 1 & 2 |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
02739053
Tent City Areas |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
02739055
Peach Lake - Aldershot |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
02739056
Alleged Drum Dump Area - Aldershot |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02762001
Newport Corner (3101) - Comp. Tech. Building (B9) |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02762002
Newport Corner (3102) - POL Stores (B32) and UST |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02762003
Newport Corner (3103) - Maintenance Garage (B13) |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02762004
Newport Corner (3104) - Power Plant |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02762005
Newport Corner (3105) - Swimming Pool House (B36) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02762006
Newport Corner (3106) - Septic Tile Field near B9 & B13 |
Remediation / risk management completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02762007
Newport Corner (3107) - Former Dumping Area |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
02762008
Newport Corner (3108) - Antenna Towers (3) |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
02762009
Newport Corner (3110) - Sewage Treatment Plant (package) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02762010
Newport Corner (3109) - Former Incinerator Hut |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
02762011
Newport Corner (3111) - Retaining Wall in Stream |
Remediation / risk management completed. No further action required. | 2000-2001 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02762012
Newport Corner (3112) - PMQ #6 -Fuel Tank Rupture |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02858001
Bedford Rifle Range(701) former pesticide drum disposal area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02858002
Bedford Rifle Range (702) - POL storage (B46) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02858003
Bedford Rifle Range (703) - Gravel Pit |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02858004
Bedford Rifle Range (704) - Rifle Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858005
Bedford Rifle Range (705) - Pistol Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858006
Bedford Rifle Range (706) - Office Building (B47) |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858007
Bedford Rifle Range (707) - Training Building (B14) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02858009
Bedford Rifle Range (709) - Formerly POL Storage (B29) |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02858010
Beford Rifle Range (710) - Former Rifle and Skeet Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858011
Bedford Rifle Range (714) - Former 1940's Infrastructure |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858012
Bedford Degaussing Range (606)- B3 Existing Bulk Structure |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02858013
Bedford Degaussing Rng (607)- B1Caretaker Res (Cntrl Bldg) |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02858014
Bedford Rifle Range (711) - Septic Tanks |
Initial testing completed. No further action required. | 2007-2008 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02858015
Bedford Rifle Range (712) - Latrines |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
02858016
Bedford Rifle Range (713) - Refuse Disposal Site |
Historical review completed. No further action required. | 1997-1998 | N Not a Priority for Action | 02 Historical Review |
02858017
Bedford Rifle Range (715) - Former UST |
Historical review completed. No further action required. | 2001-2002 | 02 Historical Review | |
02858018
Bedford Rifle Range (708) - Storage Building (B22) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02859001
CFAD Bedford (801) - Ridge Landfill |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859003
CFAD Bedford (803) - Former Landfill (West of B162) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859004
CFAD Bedford (804) - Torpedo Dye Disposal Area - East B75 |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
02859005
Wrights Cove (8601) - Former Above Ground Fuel Lines |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859006
CFAD Bedford (806) - Sewage Treatment Plant |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859007
CFAD Bedford (807) - BCE Storage Yard |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
02859008
CFAD Bedford (808) - Railcar off loading plat & B191 |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
02859009
CFAD Bedford (810) - Otto Fuelling & Defuelling B48 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859010
CFAD Bedford (811) - Former UST's, BM 95 & BM 47* |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859011
CFAD Bedford (812) - Otto Fuel Waste Burning Area BD220 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859012
CFAD Bedford (813) - B157, B158, B33* |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02859014
CFAD Bedford (815) - Central Heating Plant (B190) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859015
CFAD Bedford (816) - Ammunition Disposal Furnace (BD188) |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
02859016
CFAD Bedford (817) - Former Transformer Huts* |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02859017
CFAD Bedford (818) - Otto Fuel Storage (BD164) |
Initial testing completed. No further action required. | 2002-2003 | N Not a Priority for Action | 03 Initial Testing Program |
02859018
CFAD Bedford (819) - Existing Jetty |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859019
CFAD Bedford (820) - Former Landfill near B206 |
Long term monitoring completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
02859020
CFAD Bedford (821) - Existing Jetty -NN at Wrent Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859021
CFAD Bedford (822) - Buildings BD169-BD178, BD182 &BD183 |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859022
CFAD Bedford (823) - POL Storage Building (BD27) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02859023
CFAD Bedford (824) - Former Heating Plant (B140) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859024
CFAD Bedford (825) - Former Maintenance Garage |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02859025
CFAD Bedford (826) - Former Maintenance Area, Labs |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859026
CFAD Bedford (827) - Former Metal Scrap Yard |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859027
CFAD Bedford (828) - Former Location of Buildings 47 &48 |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
02859028
CFAD Bedford (829) - Camera Hut (BD44) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02859029
CFAD Bedford (809) - Otto Fuel Storage B203 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859032
CFAD East-side property (7403) - Area North of Highway 7 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859033
CFAD UXO Impacted Area (830) - Rent Point explosion |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859034
Wrights Cove (8604) - Pond disposal area |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02859035
Wrights Cove (8606) - Storm Drain |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859036
Wrights Cove (8603) - Two suspected dump areas |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859038
Wrights Cove (8605) - Two infilled areas |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859039
Bedford Degaussing Range (602) - Paint Locker beside B7 |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859040
Bedford Degaussing Range (605) B4 Existing Sc. Structure |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859041
Bedford Degaussing Range (604) B5 Existing Sc. Structure |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859042
Bedford Degaussing Range (603) - B6 Existing Bulk Structure |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859046
Navy Island (7501) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859048
Bedford Degaussing Range (608) - B9 POL STORAGE CABINET |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859049
CFAD Bedford (805) - Pump House with AST (B192) |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
02859050
Wrights Cove (8608) - National Gypsum Leased property |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859051
CFAD Bedford (831) - Open well NE of B146 |
Remediation / risk management completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859052
CFAD Bedford (832), Asbestos pipe on access road B79/107/109 |
Remediation / risk management completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859053
Wrights Cove (8607) - Upgradient Industrial Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859054
Wrights Cove (8602) - CN Rail Tracks/Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859055
Water Lots (9901) CFAD Bedford |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859056
Bedford Degaussing Range (601) Ind. workshop/garage (B8) |
Remediation / risk management completed. No further action required. | 2019-2020 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859057
Disposed:Bedford Degauss Rnge(7701),Naval Reserve Tufts Cove |
Historical review completed. No further action required. | 1999-2000 | N Not a Priority for Action | 02 Historical Review |
02860001
Hartlen Point (5543) - Former Boiler House |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02860002
Hartlen Point (5547) - Former POL Burn Pit |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02860003
Hartlen Point (5544) - B154 Former Radar OPS Building |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02860004
Hartlen Point (5545) - Former Ash Pit at old Club House |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02860005
Hartlen Point (5546) - Former POL |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02860006
Hartlen Point (5548) - Possible Former Dump |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02860007
Hartlen Point (5549) - Pond (disposal area) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02860008
Hartlen Point (5550) - Former Beacon/Explosives Area |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02860009
Hartlen Point (5551) - B151 TACAN Building |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02860010
Hartlen Point (5552) - B152 YAW Beacon |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02860011
Hartlen Point (5553) - Former Golf Course Building |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02860012
Hartlen Point (5554) - (B156 Old Work Shop) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02860013
Hartlen Point (5555) - B153 Old Proshop/Maintenance Bldg |
Remediation / risk management completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02860014
Hartlen Point (5556) - Former Burn Pit |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02861001
Osborne Head (5666) - Potential Landfill |
Initial testing completed. No further action required. | 1999-2000 | N Not a Priority for Action | 03 Initial Testing Program |
02861002
Osborne Head (5657) - Operations Building B301 |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 05 Detailed Testing Program |
02861003
Osborne Head (5658) - B301 Septic Field |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02861004
Osborne Head (5659) - B302/POL Shed |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02861005
Osborne Head (5660) - B303 Fire Pump House |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02861006
Osborne Head (5661) - B304 Garage |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02861007
Osborne Head (5662) - Explosives Demolition |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02861008
Osborne Head (5663) - Former Transformer Site |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863001
CFB Shearwater (201) - Landfill 6 - Airfield |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863002
CFB Shearwater (202) - EOD Disposal Area (DIPM site) |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863003
CFB Shearwater (203) - Incinerator/Fill Site (DIPM Site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
02863004
CFB Shearwater (204A) - Former Mobile Asphalt Plant |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863006
Shearwater (206) Former Barrel site HH (DIPM Site) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863008
CFB Shearwater (208) - Former Maintenance Hangar |
Long term monitoring completed. No further action required. | 2019-2020 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
02863009
Disposed: Shearwater (209) - Coast Guard Assigned Property |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863010
Shearwater (210) - Fire Fighting Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863011
CFB Shearwater (211) - Landfill 1 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863012
CFB Shearwater (212) - Landfill 2 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863013
CFB Shearwater (213) - Landfill 3 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863014
CFB Shearwater (214) - Landfill 4 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863015
Disposed - CFB Shearwater (215) - Landfill 5 |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
02863016
CFB Shearwater (216) - Fill Area West of Alpha Taxiway |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863017
Shearwater (217) - Engine Run Up Area (DIPM Site) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863018
CFB Shearwater (218) - Suspect Burn Pit No 1 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863019
CFB Shearwater (219) - Suspect Burn Pit No 2/Coal Storage |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
02863020
Shearwater (220) - Fill Area South of Hangar H |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863021
Shearwater (221) - Lower Fuel Compound and Firing Range |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863022
Shearwater (222A): Former POL (D) & UST (S) at bldg 212 & HY |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863023
Shearwater (223) - Building 4 and H (POL) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863024
Shearwater (224): Canex Garage (132), Former Firehall & UST |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02863026
Shearwater (226) C. Heating Plant (56) & Fuel (rail) Comp. |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863027
Shearwater(227) -Former CHP, Bowser Cleaning (71) & POL (87) |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02863028
Shearwater(228)-B9(Fmr Firehall,Tender Gar)Crown AssetsB70 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863029
Shearwater(229)-Upr Fuel Cmpnd,Upgradient Dmpg Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863030
Shearwater(230)-Bldg31,31A,31B,32(Mobl Spprt Maint) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863031
Shearwater(231)-W.Property Boundary |
Initial testing completed. No further action required. | 2000-2001 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02863033
Shearwater(233)-Fmr MT Garage(BJ)Adjcnt Trnsfrmr Substn |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863034
Shearwater(234A)-PMQs, Former Brick Yd(Hornsby's) |
Long term monitoring completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
02863035
Shearwater(235)-Frm Centrl Htg Plnt(G)Trnsfrmr Vault |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863038
Shearwater(238)-Morris Lake Outfall&Former UST at B54 |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02863039
Shearwater(239)-Former Transformer Site(Railway Spot) |
Initial testing completed. No further action required. | 2000-2001 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02863040
CFB Shearwater (240) - West Hangar Line, Fmr UST at B15 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863041
CFB Shearwater (241) - East Hangar Line and Ramp Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863042
CFB Shearwater (242) - Hangar 3 and Annex |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863050
Osborne Head (5664) - Mine Disposal Site |
Initial testing completed. No further action required. | 2007-2008 | 03 Initial Testing Program | |
02863051
Osborne Head (5665) - Former Radar Site |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02863052
Shearwater(236)-Frm UST Loc(WWII)Bravo Taxiwy |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02863053
CFB Shearwater (204B) - Former Heavy Equipment Compound |
Long term monitoring completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
02863054
CFB Shearwater (205) - Ammunition Compound |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863056
CFB Shearwater (244) - AVGAS Pipeline |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02863057
CFB Shearwater (245) - Hanger F |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863058
CFB Shearwater (246) - Airfield Bunkers |
Remediation / risk management completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863059
Water Lots (9910), Shearwater |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863060
Shearwater (243), Buried Lines Connect. Fmr Fuel Tank Farm |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
02863061
Shearwater - PMQs, Former Brick Yard (Hornsby's) (234B) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02865001
McNabs Island (2601) - POL Stores (B4) |
Remediation / risk management completed. No further action required. | 2003-2004 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02865002
McNabs Island (2602) - Flammable Stores Building (B5) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02865003
McNabs Island (2603) - APU/Generator Hut (B8) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02865004
McNabs Island (2604) - Residence and AST (B10) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02865005
McNabs Island (2605) - Solid Waste Area |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02865006
Water Lots (9903), Bedford Degaussing Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02865007
Water Lots (9909), McNabs Island |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02884001
Melville Island (5901) - Marina Storage (B1) |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02884002
Melville Island (5902) - Old Ice House (B2) |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02884003
Melville Island (5903) - Clubhouse (B4) |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02884004
Melville Island (5904) - Marina Storage (B6) |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02884005
Melville Island (5905) - Bubbler Shed (B7) |
Detailed testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02884006
Melville Island (5906) - Workshop (B8) |
Detailed testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02884007
Melville Island (5907) - Former Chapel Site (B10) |
Detailed testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02884008
Melville Island (5908) - Boat Storage/Parking Lot Site |
Detailed testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02884009
Melville Island (5909) - Marina Railway Site |
Detailed testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02884010
Melville Island (5910) - Fuel Storage/Dispensing Area |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02884011
Melville Island (5911) - Cradle Yard |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02884012
Melville Island (5912) - Mooring Field |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02884013
Melville Island (5913) - Causeway |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
02907001
Disposed Willow Pk (4321) Frmr Heating Plant (EY4 CE Supply) |
Confirmatory sampling completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02907002
Disposed - Willow Park (4322) - Paint Shop (EY7) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02907004
Disposed - Willow Park (4324) - CE Stores (EY3)* |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02907005
Disposed - Willow Park (4325) - CE Production Centre (EY5) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02907006
Willow Park POL Stores (4323) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02913001
Water Lots (9911) - HMCS Scotian |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02914001
Halifax Armoury Building (2201) - Main Armoury Building |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02916001
RA Park (3301) - Officers Mess (RA1) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02916002
RA Park (3302) - Office Facility (RA2) |
Long term monitoring completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
02918001
Willow Park (4302) - Base Maintenance Shops (WL2) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918002
Willow Park (4303) - Base Maintenance Shops (WL3) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918004
Willow Park (4305) - Base Maintenance Shop (WL9) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918005
Willow Park (4306) - Utilities Shed (WL15) & Former WL34* |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918006
Willow Park (4307) - Former Service Station (WL23) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918007
Willow Park (4308) - Outdoor POL Storage Area (Fmr WL24) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918008
Willow Park (4309) - Former Radioactive Pit (Fmr WL27) |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918010
Willow Park (4311) - Canex (WL30) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918011
Willow Park (4312) - RCCS Garage (WL31) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918012
Willow Park (4313) - POL Shed (WL33) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918013
Willow Park (4314) - Vehicle Paint Shop (WL34) |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918014
Willow Park (4315) - Outdoor Coiled Wire Storage area |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918015
Willow Park (4316) - Former Outdoor Bulk POL Storage WL39* |
Confirmatory sampling completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918017
Willow Park (4318) - Suspect Fmr Grease/Oil Pit (WL17) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918018
Willow Park (4319) - Vehicle Maintenance Garage WL22 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918021
Willow Park (4301) - Base Maintenance HQ & Shops (WL1) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02918022
Willow Park (4320) - Salt Dome (WL36) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919001
Dockyard (1001) - CE Office and Shops (D2) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919002
Dockyard (1002) - Boat Shed (D5) |
Initial testing completed. No further action required. | 2007-2008 | 03 Initial Testing Program | |
02919003
Dockyard (1003) - Rectifier House (D74) |
Initial testing completed. No further action required. | 2000-2001 | 3 Low Priority for Action | 03 Initial Testing Program |
02919004
Dockyard (1004) - Mainguy Building (D201) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919005
Dockyard (1005) - PMQ's and Garage (D77, D78, D79 & D81) |
Remediation / risk management completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919006
Dockyard (1006) - Pollution Control DREA (D17) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919007
Dockyard (1007) - Sheet metal & Refrig. Shops (D19) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919008
Dockyard (1008) - SRU Building Bosuns Shops (D125) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02919009
Dockyard (1009) - Base Exchange (D82) |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02919010
Dockyard (1010) - Electronics Shop (D20) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919011
Dockyard (1011) - Inflammable Stores (D57) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919012
Dockyard (1012) - Base Fire Hall (D196) |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02919013
Dockyard (1013) - Base Supply (D40 and D155) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919014
Dockyard (1014) - Main Base Supply (D206) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919015
Dockyard (1015) - Underwater Repair building (D53) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919016
Dockyard (1016) - Central Heating Plant (D62) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919017
Dockyard (1017) - Outside Fitters and Machine Shop (D108) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919018
Dockyard (1018) - Base Supply (D66) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919019
Dockyard (1019) - Packing and Preservation Bldg (D67) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919020
Dockyard (1020) - SRU Main Building (D200) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919021
Dockyard (1021) - Submarine Shelter (D170) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02919022
Dockyard (1022) - Oil Waste water Treatment |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919023
Dockyard (1023) - Corrosion Prevention & Sub Squadron |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919024
Dockyard (1024) - FMG and SRU (D166) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919025
Dockyard (1025) - Shipwrights Shop (D174) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919026
Dockyard (1026) - Base Transport (D172) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
02919028
Dockyard (1028) - HazMat Facility (D207) |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
02919029
Dockyard (1029) - Rectifier Building (D47) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919030
Dockyard (1030) - Maritime Command Headquarters (D14) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919031
Dockyard (1031) - Transformers East of Building D14 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919032
Water Lots (9908) - Dockyard |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919035
Dockyard (1035) - Former D15 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919036
Dockyard (1037) - Former D19 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919037
Dockyard (1039) - Former D95 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919038
Dockyard (1047) - Former D71 |
Historical review completed. No further action required. | 2000-2001 | N Not a Priority for Action | 02 Historical Review |
02919039
Dockyard (1038) - Former D88 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919040
Dockyard (1040) - Former D20 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919041
Dockyard (1033) - Former B122 and 60 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919042
Dockyard (1042) - Former D159 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919043
Dockyard (1044) - Former D127 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919044
Dockyard (1045) - Former D109 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919045
Dockyard (1046) - Former D63 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919046
Dockyard (1032) - Fomer CN Rail Line btwn parking & building |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919047
Dockyard (1034) - Former D7 |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919048
Dockyard (1036) - Former D17 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919049
Dockyard (1041) - Fomer D49 |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919050
Dockyard (1043) - Former D59 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02920001
Stadacona (3701) - Heating Plant (S11) |
Confirmatory sampling completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02920002
Stadacona (3702) - Diesel Shop (S88) |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02920003
Stadacona (3703) - Protestant & RC Chapel (S7) |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
02920004
Stadacona (3704) - Pump House (S41) |
Historical review completed. No further action required. | 2000-2001 | 02 Historical Review | |
02920005
Stadacona (3705) - CE Production Centre (S30) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02920007
Stadacona (3707) - CFIC Building (S89) |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02920009
Stadacona (3708) - Gardens - rear of Bldg S52(Admiral's Res) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02920010
Stadacona Gym (3710) - Former UST |
Confirmatory sampling completed. No further action required. | 2007-2008 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02920011
Stadacona (7601) - Queens Printer Bulding S93 EPRINTIT |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
02920012
Stadacona (7602) - Queens Printer Bldg S93 Trident Offices |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
02920013
Stadacona (7603) - Queens Printer Bldf S93 Tattoo Off./Stge |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
02920014
Stadacona (7604) - Queens Printer Bldg S93 Furn./Coal chute |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02921001
Disposed - South & Harvey St (3501) - Main Marcom Building |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
03002001
Windsor Park (4502) - Auto Hobby Club WP 87 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03002002
Windsor Park (4501) - CHP (WP62) & POL Shed (WP58) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03002004
Windsor Park (4503) - Former Heating Plant (WP45) |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
03002005
Windsor Park (4504) - Military Police (WP92) |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
03002006
Windsor Park (4505) - PMQ Barracks |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03002007
Windsor Park (4506) - Former Gas Chamber (WP49) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
03002008
Windsor Park - Former RCE Garage (4507) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
03002009
Windsor Park (4508) - Former Rifle Range (WP11 & WP30) |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03002010
Windsor Park (4511) - UST Site WP90 |
Confirmatory sampling completed. No further action required. | 2007-2008 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03002011
Windsor Park (4510) - School Property (fmr WP42) |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
03002012
Windsor Park (4509) - PMQ's (WP4, WP5 & WP9 - WP12) |
Initial testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03009008
Dockyard Annex (1110) - Silica Sand Blast (W61) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03009015
Dockyard Annex (1101) - Hazardous Storage Area (W45) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03009022
Dockyard Annex (1117) - W53 Garage |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03009023
Dockyard Annex (1118) - W54 Residence |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03009024
Water Lots (9907), Dockyard Annex |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03010001
Water Lots (9906), French Cable Warf |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03011001
Shannon Park (3401) - Central Heating Plant (B4) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03011002
Shannon Park (3402) - Fmr POL Storage Behind (B2) |
Remediation / risk management completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03011003
Shannon Park (3403) - Snow Stockpile area, behind (B4) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03011004
Shannon Park (3404) - Swimming Pool (B10) |
Historical review completed. No further action required. | 2001-2002 | 02 Historical Review | |
03011005
Shannon Park (3405) - Former Storage Building (B5) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03011006
Shannon Park (3406) - Skating Rink (B20) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
03011007
Shannon Park (3407) - Former Location of Storage (B7) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03011008
Disposed - Water Lots, Shannon Park (9904) |
Confirmatory sampling completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03011009
Shannon Park (3408) -CHP Ash Disposal |
Remediation / risk management completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03011010
Shannon Park (3410) - Residential Area |
Remediation / risk management completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03011011
Shannon Park (3409) - Fill Area, Rink |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03013004
DRDC (1408) - Waste solvent dumping (East of building 2) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03013009
Water Lots (9913), DREA Accoustic Barge |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03013010
Fuel Lines fr Bunker AST to French Cable Wharf (1404) |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
03042001
West Chezzetcook Bombing Range (5769) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03044001
DCD School (901) - Former USTs at Bldg B1 |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03044002
DCD School (902) - AST at B3 |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
03044004
DCD School (904) - Possible Former Greenhouse |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03044005
DCD School (905) - POL compound |
Detailed testing completed. No further action required. | 2010-2011 | 1 High Priority for Action | 05 Detailed Testing Program |
03044006
DCD School (906) - Upper Garage |
Confirmatory sampling completed. No further action required. | 2009-2010 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03044007
DCD School (907) - Fire Fighting Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03044008
DCD School (908) - Contaminated Spoil Fill Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03044009
DCD School (909) - Creek, Lagoon and Beach |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03044010
DCD School (910) - Former Ordnance Demolition Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03044011
DCD School (911) - Construction Debris Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03044014
DCD School (903) - AST at B6 |
Long term monitoring completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
03044015
Disposed -Sandwich Pt.(7301) Fmr Pump house-AST/Transformer |
Long term monitoring completed. No further action required. | 2014-2015 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
03044016
Sandwich Point (7302) - Transformer (Water Pump Sta.) |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03130001
Truro Armoury (4001) - Armoury Building (B1) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03130003
Truro Armoury (4003) - Indoor Rifle Range |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
03130005
Truro Armoury (4004) - Former POL Storage Locations |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03138001
Masstown (2501) - Receiver Building |
Historical review completed. No further action required. | 2001-2002 | 02 Historical Review | |
03138002
Masstown (2502) - Antenna Field |
Historical review completed. No further action required. | 1999-2000 | N Not a Priority for Action | 02 Historical Review |
03144001
Debert Rifle Range (1201) - Rifle/Pistol Range |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03144002
Debert Rifle Range |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
03146001
Great Village Transmitter Site (2001) - Existing AST |
Confirmatory sampling completed. No further action required. | 2014-2015 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03148001
Disposed - Folly Lake (1601) Control Building/Radar Facility |
Initial testing completed. No further action required. | 2006-2007 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03148002
Disposed - Folly Lake (1602) - Garage/POL Building |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
03186001
Amherst Rifle Range (5403) - Range firing pts, butt stops |
Long term monitoring completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
03186002
Amherst Rifle Range - Clear Cut Area |
Confirmatory sampling completed. No further action required. | 2007-2008 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03186004
Amherst Rifle Range (5404) - Troop Shelter |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
03186005
Amherst Rifle Range (5402) - Markers Shelter |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
03186006
Amherst Rifle Range (5401) - Target Shed |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03205001
Amherst Armoury Building (501) |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03205002
Amherst Armoury (502) - former POL shed |
Long term monitoring completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
03268001
Pictou Armoury (3201) - Old Armoury Building (B1) |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
03268002
Pictou Armoury (3202) - Old POL Storage Shed (B2) |
Initial testing completed. No further action required. | 2000-2001 | N Not a Priority for Action | 03 Initial Testing Program |
03268003
Pictou Armoury (3204) - Maintenance |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
03288003
New Glasgow Armoury (2901) - Armoury Buidling |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03288004
New Glasgow Armoury (2902) - POL Storage Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03288005
New Glasgow Military Parking (9301) - Coal Ash Disposal Area |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03288006
New Glasgow Armoury - Military Parking (9302) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03660002
CFS Sydney- FPS Radar Site (1701)- Scrap Stg Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03660003
CRS Sydney - FPS Radar Site (1702) - Radar Building B55 |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03660004
CFS Sydney - FPS Radar Site (1703) - Former PCB Storage |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03660005
CFS Sydney FPS Radar Site(1704) Former Furnace Oil Tank (B1) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03660006
CFS Sydney FPS Radar Site (1705) Former Furnace Oil Tank B57 |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03660007
CFS Sydney FPS Radar Site (1706) Former Furnace Oil Tank B50 |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03662001
Sydney Rifle Range (3801) - Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03690001
Glace Bay Armoury (1801) - Armoury (B1) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03690002
Glace Bay Armoury (1802) - POL Storage |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03690003
Glace Bay Armoury (1803) - South Fence (Naphtha) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
03708001
Victoria Park (4101) - Headquarters Building (B8) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03708002
Victoria Park (4102) - Quarter Masters Stores (B35) |
Initial testing completed. No further action required. | 1999-2000 | 03 Initial Testing Program | |
03708003
Victoria Park (4103) - Heating Plant (B11) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03708004
Victoria Park (4104) - Former Maintenance Garage (B34) |
Initial testing completed. No further action required. | 1999-2000 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03708005
Victoria Park (4105) - Former Garage B27 |
Initial testing completed. No further action required. | 1999-2000 | 03 Initial Testing Program | |
03760004
North Sydney Armoury (3001) - B32 |
Initial testing completed. No further action required. | 1999-2000 | N Not a Priority for Action | 03 Initial Testing Program |
04089006
K41 POL Storage Site |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
04089007
Mons Small Arms Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
04089009
Central Heating Plant Fuel Oil Tank |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089010
Shirley Rd. Dump |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089011
POL Service Area - K20 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089012
Fire Hall |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089013
Heliport-403 Squadron (Bldg L10) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089014
K56 POL Storage Site |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
04089015
K44 POL Storage Site |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
04089016
K43 POL Storage Site |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
04089017
K29 POL Storage Site |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
04089018
Hoist Hydraulic Oil Leakage Site (K6 + others) |
Initial testing completed. No further action required. | 2002-2003 | N Not a Priority for Action | 03 Initial Testing Program |
04089019
PMQ (6/8 Venoit St) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089020
PMQ (85/87 Restigouche Rd.) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089021
PMQ (14 Hazen Cres.) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089022
PMQ (203 MacKenzie Av.) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089023
Indoor Tank Wash and Lagoon |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089024
C7 Hobby Shop |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089025
C8 - Waste Oil Leak |
Initial testing completed. No further action required. | 2003-2004 | N Not a Priority for Action | 03 Initial Testing Program |
04089027
H14 - HQ |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
04089028
Static Range Impact Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089036
K8 |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
04089037
A-14 Water Treament Plant |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089038
Blissville Airport |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
04089039
Salt and Sand Sheds |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
04569002
CFAD Renous |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05441001
Rimouski Armoury |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05613001
Mount Apica - north slope |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05647014
Montmagny Armoury |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
05750001
St-Malo Armoury |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05751001
PMQ Old Quebec City |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05906001
Ground of building 622 (DEV-6) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
05906002
Base building 621 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05906005
Ravenna Lake and River |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
05906006
Former Firefighter Training Area |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
05906008
Former Jean-Brillant Snow Dump |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
05906009
Former Place Vanier Snow Dump |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
05906010
Biathlon (Myriam-Bédard Centre) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05906011
Forest Station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05906012
P-5 area |
Historical review completed. No further action required. | 2017-2018 | 02 Historical Review | |
05906016
Arnhem Firing Range |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
05906017
POL (cadets/gliders) |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 05 Detailed Testing Program |
05906036
Rivière-du-loup Armoury, Thériault Boulevard |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05906037
Home base, lift - bldg 110 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
05906038
Home base, bldg 311, ACI-311 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05906039
Camp Dubé, DEV-1. |
Initial testing completed. No further action required. | 1993-1994 | N Not a Priority for Action | 03 Initial Testing Program |
05906040
Training sector, ''AP'' and ''TE'' impact area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05906041
Le RHIN former demolition area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05906042
Dieppe former firing ranges |
Long term monitoring completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
05906043
Training areas, Rivière-aux-Pins small former dumps |
Initial testing completed. No further action required. | 2013-2014 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05906044
Training areas, former CARPIQUET firing range |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05906045
Training areas, former hunting and fishing club |
Long term monitoring completed. No further action required. | 2012-2013 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
05906046
Training areas, NORMANDIE firing range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05906047
Former dump Château Road |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05906048
Training areas, NICOSIE/FAMAGUSTA firing range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05906049
Training areas, ORTONA firing range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05906050
VAUCELLES firing range |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05906051
Training areas, TROIS-RIVIÈRES firing range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05906052
Training areas, BOFFIN firing range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
05906053
Training areas, TERMOLI firing range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05906054
Training areas, LIRI Impact |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05906056
Training areas, CAMBRAI firing range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05906057
Training areas, BATOCHE firing range |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05906058
Building 310 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
05906059
Castor center PHL T-610 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05906060
AFFF Heliport |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05906061
Land adjacent to the former well P-2 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05906062
New Snow Dump (Camp Vimy) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
05906063
Valcartier Area - Historical Study |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
05906064
Valcartier Area - Surface water |
Remediation / risk management completed. No further action required. | 2013-2014 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05928001
Building 1 - Levis Armoury |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
06012001
Lac-Mégantic Armoury, RES-1. |
Long term monitoring completed. No further action required. | 2011-2012 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
06012002
Lac-Mégantic Armoury, RES-2 and 3. |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06294001
Adminstrative Area-Domaine, Lozeau and Bougainville Islands |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06294002
Moras Island, Cadet camp |
Detailed testing completed. No further action required. | 2011-2012 | I Insufficient Information | 06 Classify the site using the CCME National Classification System |
06477001
Former Shawinigan Armoury |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06651001
Big Dump, CEF Farnham |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
06651002
Pump Area, CEF Farnham |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
06651003
Demolition site, CEF Farnham |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06651004
Fire Range P12/P13,CEF Farnham |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
06651005
Farnham, Garage E-1 Prkg |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06651006
Pistol Range, CEF Farnham |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06651007
Small Dump, CEF Farnham |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
06679001
Hydraulic elevator H-101, ASU St-Jean |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06679002
Former Garage and service station, ASU St-Jean |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06679006
St-Jean Garrison, Outdoor firing range |
Historical review completed. No further action required. | 2017-2018 | 02 Historical Review | |
06679007
St-Jean Garrson, Used snow site near H104 (2A) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06679008
St-Jean Garrison, POL 124 |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06679009
St-Jean Garrson, Used snow site (2B) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06680001
Former T-22 Reservoir, Fort St-Jean Campus |
Remediation / risk management completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06680004
Royal Military College, Former reservoir T20 (building 102) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06710001
Jet-Fuel canalisation, Complexe St-Hubert |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06710002
Hangar 3, Bottemless drain St-Hubert Complex |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06710003
Hangar 3,Wash Bay,Complexe St-Hubert |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06710016
St-Hubert, playing field, reservoir T-40 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06710017
St-Hubert, Hangar 3, hydraulic elevators |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06710018
St-Hubert |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06872001
St-Maurice training sector (Firing range) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06872002
Moras Island |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06872011
Moras Island, Pumping station |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
06872024
Moras Island, Former disposal sites |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
06872038
Sector OP-1 to OP-6 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06875001
Camp Bouchard, Ex Ammo Dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06953001
New Storage Area in Back of the Building |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06972001
Pointe-Picard Marina - Marine sediments |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06972002
Farnham Range &Training area - Soil dumping on federal land |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07070001
PMQ 33 Fort St-Jean |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07070002
Former Building 12 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07070003
Range- Old Vehicule (behind range A-B) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07070004
Soil assessment building 166 |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07070005
Enlargement of LAV III testing ramp at 202 WKP |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07089001
Cathcart Armoury |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07156001
St-Grégoire Armoury |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07221001
Longue Pointe Soil Clean-up |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
07221002
Mechanical Workshop, L-3, ASU Longue-Pointe South |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
07221003
Loading platform, L-3 North, ASU LP |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
07221004
Parking at south L-6, ASU LP |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07221005
L-10 South, ASU LP |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07221006
Outdoor Firing Range L-139, ASU LP |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
07221007
Parking - South Section (Notre Dame) ASU LP |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
07221008
Used snow sites, ASU LP |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07221018
Sector Slag Studies, ASU LP |
Remediation / risk management completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07221019
Mechanical Workshop L-3 North, ASU LP |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07221020
Central thermal retaining wall, Bldg 37 Montreal Garrison |
Confirmatory sampling completed. No further action required. | 2014-2015 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07221021
Indoor Firing Range L-123, ASU LP |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
07604001
Hull Armoury Vehicle Compound |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
07930004
Aerodrome - West of runway 18-36 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
07930006
Former landfill site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
07930007
FFTA & PFAS Bagotville |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07930008
Canex service station - Building 147 |
Long term monitoring completed. No further action required. | 2012-2013 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
07930009
POL tank farm |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930011
Central Heating Plant |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
07930012
Landfarming site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07930013
Former 161 kV electrical substation - Building 111 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07930014
Former sewage treatment plant - Building 118 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07930015
New destruction centre for explosives - New EOD |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07930016
Former demolition centre for explosives - Former EOD |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07930017
Marsh - North of highway 170 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930018
Bowser maintenance shop - Building 77 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930019
Cadet camp-Former dry material disposal site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930020
Bombardier flight simulator - Construction site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07930021
Former B-244 APU location |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08132001
CFS Moisie OPS, TX, GATR Sites |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
08598001
Connaught Range Primary Training Centre - Bldgs 142 & 143 |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08598002
Connaught Rnge Primary Trng Ctre,Various Former Supply Wells |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
08598005
Connaught Range Primary Training Ctre Former Transport Comp. |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08598006
Connaught Range Primary Training Centre Former Landfill Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08598007
Connaught Range Primary Training Centre - Building 36 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08636001
Central Heating Plant in Rockcliffe - Disposed to NCC |
Confirmatory sampling completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08636002
CFSU(O) Rockcliffe PMQ Trailer Storage Compound |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09406001
Soil remediation Site/Abandoned Landfill, Gore Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406002
600 Yard Rifle Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406003
25 Yard Range North |
Remediation / risk management completed. No further action required. | 1998-1999 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09406004
25 Yard Range Central |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406005
Correctional Services Canada Small Arms Range |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406006
75 Yard Small Arms Classification Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406007
Gore Training Area - Low Growth Region |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
09406008
Abandoned Landfill - McNaughton Barracks |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406012
Sand and Salt Storage bldg E32 McN |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406013
Sand and Salt Storage Bldg C40 McN |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
09406014
POL Storage Bldg A18 McN |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406015
Auto Hobby Club Bldg C35 McN |
Initial testing completed. No further action required. | 1998-1999 | 03 Initial Testing Program | |
09406017
Building H55 - Defence Research Lab Disposal |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
09406018
Fire Fighting Training Area |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
09406019
A12 McNaughton |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406021
E30 |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406023
MCN D-36 |
Initial testing completed. No further action required. | 1997-1998 | N Not a Priority for Action | 03 Initial Testing Program |
09406024
E-32 UST |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406026
MCN A21 Central Heating Plant |
Initial testing completed. No further action required. | 1997-1998 | 03 Initial Testing Program | |
09406027
Two USTs, Pipeline and Valve Pits |
Long term monitoring completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
09407005
25 Yard Range South |
Remediation / risk management completed. No further action required. | 2014-2015 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09407006
R26 Fort Henry Heights Dump site |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
09407007
B24 Vimy Hydraulic Hoist |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | I Insufficient Information | 06 Classify the site using the CCME National Classification System |
09407008
Arrowhead Beach |
Initial testing completed. No further action required. | 1997-1998 | 03 Initial Testing Program | |
09407009
Fort Henry Heights R3, R4 |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
09445001
Fort Frontenac Water Lots |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09445002
Fort Frontenac Courtyard |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09445003
FF6 Normandy Hall |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09540001
Northwest Bldg 110 |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09540002
Northwest Bldg 52 |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
09540005
EME Shop, Bldg 113 and Skeet Range |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09540008
North Canex Bldg 98 |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
09540009
Middleton Park Landfill Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09540010
AMDU Landfill Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09540012
8 W Fire Fighting Training Area /Hazardous Materials Storage |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09540015
Bldg 3 (S) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09540016
Area of Bldg 163 & 201 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
09540017
West of Bldg 51 |
Initial testing completed. No further action required. | 2008-2009 | 03 Initial Testing Program | |
09540018
Bakers Island |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09540020
POL Compound - area of removed tanks |
Remediation / risk management completed. No further action required. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09540021
Bldg 242 |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
09540022
Bldg 272 |
Initial testing completed. No further action required. | 2006-2007 | N Not a Priority for Action | 03 Initial Testing Program |
09540032
North of Bldg 1 |
Initial testing completed. No further action required. | 2004-2005 | 03 Initial Testing Program | |
09540033
Northwest of Bldg 65 |
Initial testing completed. No further action required. | 2004-2005 | 03 Initial Testing Program | |
09540036
POL Pipeline |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09540037
Lawn Area |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
09586002
Pt Petre - Previous artillery range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09596001
Carrying Place north of bldg. |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09596002
Carrying Place South of Bldg |
Initial testing completed. No further action required. | 2004-2005 | 03 Initial Testing Program | |
10626002
Niagara-on-the-lake Rifle Range |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10642001
Chatham Armoury |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
10829001
Stony Point (fmr Camp Ipperwash) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
10868001
TCE Contamination - Highbury Complex |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10869001
Wolseley Barracks |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10885001
HMCS Prevost Marina |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10885002
HMCS Prevost Armoury |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
10992001
Garrison Landfilll; Closed |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10992002
Asbestos Landfill |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
10992003
Maintenance Garage |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
10992004
Refueling Facility 1 |
Initial testing completed. No further action required. | 1997-1998 | 03 Initial Testing Program | |
10992006
Refuelling Facility 2 |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
10992007
Garrison Area Refuelling Facility |
Long term monitoring completed. No further action required. | 2016-2017 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
10992009
Sewage Lagoons |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
10992010
Airfield Mound |
Initial testing completed. No further action required. | 2004-2005 | 03 Initial Testing Program | |
10992011
Transformer Storage |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
10992012
Army Firehall #1 |
Initial testing completed. No further action required. | 2004-2005 | 03 Initial Testing Program | |
10992013
Tank Parking Area |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
10992014
Hangar #1 |
Initial testing completed. No further action required. | 1998-1999 | 03 Initial Testing Program | |
10992016
Roadways |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
10992024
Ammunition Dump |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
10992025
Potential Herbicide Barrels Burial Site |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
10997001
POL Storage Shed #2; Existing |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
10997002
Indoor Rifle Range #5; Existing - Closed |
Historical review completed. No further action required. | 2021-2022 | 02 Historical Review | |
11022001
Roundel EOD Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022002
Sewage Sludge Drying Beds; Existing |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022003
Transformer Substation #1; Former |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022005
Coal Storage Area #3; Former |
Long term monitoring completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
11022006
Construction Waste Landfill #4; Closed |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 05 Detailed Testing Program |
11022009
Aircraft Fuel Storage Facility #2; Former |
Remediation / risk management completed. No further action required. | 2018-2019 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022010
Mustard Gas Site #2; Former |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 05 Detailed Testing Program |
11022011
Construction Waste Landfill #2; Active |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
11022012
Vehicle Refuelling Facility #1; Former (P-52) |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022014
Bulk Fuel Storage Site; (Demolished O-89) |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
11022015
Emergency Generator Fuel Storage Site; Existing |
Initial testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022016
Retail Gasoline Station #1; Former (A-179) |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022017
Salvage Yard; Former |
Long term monitoring completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
11022018
Domestic/Industrial Waste Landfill #3; Closed |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022019
Underground Fuel Oil Tank #1; Former; CFAD 207 |
Detailed testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
11022020
Underground Fuel Tank #2; Former; CFAD 52 |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
11022021
Chemical Storage Area #3, Former |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
11022023
Aboveground storage tank @ R-35 |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
11022024
Aboveground storage tank @ R-24 |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
11022025
POL Shed @ E-182 |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
11022026
Aboveground storage tank @ O-122 |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022027
Soil Remediation Landfarm |
Remediation / risk management completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022028
CFAD Angus Site at 2nd St. and Ismailia Rd. |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
11022031
Domestic Landfill #2 |
Remediation / risk management completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022032
Borden Landfill |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
11022033
Ammunition Dump #1; Former Airforce Facility |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
11022034
Sewage Sludge Ponds #1 |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022035
Castle EOD Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11022036
Mustard Gas Site #1 |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
11022037
Waterloo Research Area #1 (Sand Pit Area) |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022038
Amiens Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022039
Fire Fighting Training Area #1 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022040
Paint Shop #1 |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
11022041
West Grenade Range |
Remediation / risk management completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022042
Vimy Rifle Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11022043
Mons Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022044
Langemark Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022045
Firehall #1 |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022046
Firehall #2 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
11022047
Simulated Mine Area |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022048
Vehicle Refuelling Facility #2 |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 05 Detailed Testing Program |
11022049
Septic System #1 |
Initial testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022050
Outdoor Armoured Vehicle Prking Area |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
11022051
Vehicle Maintenance Area |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022052
Indoor Rifle Range #1 |
Detailed testing completed. No further action required. | 2011-2012 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
11022054
Soap Plant; Former |
Remediation / risk management completed. No further action required. | 2016-2017 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022055
Central Heating Plant #1 |
Initial testing completed. No further action required. | 2006-2007 | N Not a Priority for Action | 03 Initial Testing Program |
11022057
Garage #2 |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022058
Garage #3 |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022059
Garage #4 |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022060
Garage #5 |
Detailed testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 05 Detailed Testing Program |
11022064
Garage #6 |
Remediation / risk management completed. No further action required. | 2016-2017 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022065
Garage #7 |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 05 Detailed Testing Program |
11022066
Coal Storage Area #1 |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022067
Indoor Rifle Range #3 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
11022068
Petroleum Contaminated Soil Pile |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
11022069
Central Heating Plant #3 |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022070
Waterloo Research Area #2 (Forested Area) |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022071
Base Borden Disposal Range |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022073
Paint Shop #2 |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
11022075
Coal Storage #2 |
Long term monitoring completed. No further action required. | 2021-2022 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
11022076
Septic System #3 |
Remediation / risk management completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022077
Garage #8 Demolished |
Detailed testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 05 Detailed Testing Program |
11022079
Wheeled Vehicle Hangar #3, Former (Bldg E-140) |
Remediation / risk management completed. No further action required. | 2014-2015 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022081
Domestic Waste Landfill #4; Closed |
Remediation / risk management completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022082
Garage #17 (Former) |
Remediation / risk management completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022083
Firehall #4 (Former Airforce Facility) |
Long term monitoring completed. No further action required. | 2018-2019 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
11022086
Fumigation Block ; Former (O-114) |
Initial testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022087
Demolition Waste Dump |
Remediation / risk management completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022088
Chemical Storage Area #1; Former (HS-6) |
Remediation / risk management completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022092
Retail Gas Station #2; Former P-134 (CANEX/Shell) |
Long term monitoring completed. No further action required. | 2021-2022 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
11022094
Central Heating Plant #5; Former Airforce Facility |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022095
Aircraft and Domestic Waste Landfill; Closed |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022096
POL Storage Shed; E-184 |
Detailed testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022097
Small Ammunition Disposal Area; Former |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
11022098
Sink Pit #1; Former |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 05 Detailed Testing Program |
11022099
Sink Pit #2; Former |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 05 Detailed Testing Program |
11022100
Sink Pit # 3; Former |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 05 Detailed Testing Program |
11022102
Workshop #2; Former (CFAD 151) |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
11022113
Lisle Road |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
11022114
Demolition Waste Dump |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
11022119
Rocket Launcher Range |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11022121
Foxfield Battle Assault Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022122
CAEN Battle Assault Range |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
11022124
Le Cateau Battle Assault Range |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11022129
Toboggan Hill |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022131
Garage #16 Demolished |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
11022133
Septic System #4; Existing (CFAD 207) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022134
Incinerator #2 (Former) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022135
Central Heating Plant #4; Former Army Facility |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022136
Transformer Substation #2 ; Former |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022137
Carpenter Shopwood Storage Facility; Demolished |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 05 Detailed Testing Program |
11022138
Garage #1; Existing (O-155) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022139
Vehicle Recovery Site |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022140
Coal Compound; Former (NW of CFAD 52) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022143
Septic System #5; Existing (CFAD 38) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022145
Workshop #1; Former CFAD 151 |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022146
Workshop #3; Former (CFAD 200) |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022148
Firehall #3; Former Army Facility |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022149
Ammunition Dump #2; Former Army Facility |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
11022150
Landfill; Former (Current Skateboard Park) |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 05 Detailed Testing Program |
11022152
Hangar 17 POL Compound |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022153
Gun Emplacement |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022154
Construction Waste Landfill #1; Closed |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
11022155
Septic System #2-CFAD |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
11022156
Engine Test Site; Former |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022157
O-5 Impacted Fill |
Initial testing completed. No further action required. | 2011-2012 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022158
Circled Pine Maint. Shed, B O-138: Fuel Storage & Septic bed |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
11048001
Aboveground Fuel Oil Storage Tank (Edenvale) |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
11048074
Lagoons (Edenvale) |
Initial testing completed. No further action required. | 2006-2007 | N Not a Priority for Action | 03 Initial Testing Program |
11048112
Edenvale Airfield |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11048113
Firefighter Training Pit ; Former (Edenvale) |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
11054001
POL Storage Shed #1; Existing |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
11054002
Indoor Rifle Range #4; Existing - Closed |
Historical review completed. No further action required. | 2004-2005 | N Not a Priority for Action | 02 Historical Review |
11347006
R101 Canex Garage |
Confirmatory sampling completed. No further action required. | 2009-2010 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11347007
Old Rifle Range / Biathlon Range |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11347008
Petawawa RTA |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 05 Detailed Testing Program |
11378001
22 Wing RV Compound |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11378002
22 Wing Former POL Tank Farm |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11378003
Snow Dump |
Confirmatory sampling completed. No further action required. | 2010-2011 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
11378004
Former Heating Plant |
Confirmatory sampling completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11378005
22 Wing 25m Outdoor Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11378006
Auto Hobby Club Building No.57 |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11378007
FETA (North Bay) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11378008
FFTA (North Bay) |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11378009
Building 16 - Former UST location Vehicule refuelling area |
Long term monitoring completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
11848001
SAULT STE MARIE ARMOURY |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11937001
Mount McKay Range |
Confirmatory sampling completed. No further action required. | 2013-2014 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
12439001
Inactive Landfill |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
12439002
Rifle Range 1 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
12439006
Rifle Range 2 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
12439007
Rifle Range 3 (small arms) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12439008
Rifle Range 4 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
12448001
Sewage Lagoon |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
12448002
Incinerator Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12448003
Canadian POL |
Long term monitoring completed. No further action required. | 2015-2016 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
12448004
Vehicle Wash Q Lines (8209) |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12448005
Storm Sewer Outfall |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
12448006
Engine Repair & Testing Facility - Q115 |
Long term monitoring completed. No further action required. | 2015-2016 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
12559001
Building C4 |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12559002
Building B17 |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12577001
St-Charles Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
12578001
Headingly Transmitter Site |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12579001
17 Wing Bulk Fuel POL & B82 Pumphouse |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
12579002
Building 51 |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12579003
Building 62 |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12579004
17 Wing Former Building 87 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
13664001
CFB Sask. - Boggy Creek Transmitter |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
13820001
15 Wing B58 & EME Shop Test Site 2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
14121001
Dundurn Burn Dump |
Remediation / risk management completed. No further action required. | 2022-2023 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
14121002
Small Arms Ammunition Destruction Complex |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
14121003
Classification Range |
Historical review completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 02 Historical Review |
14121004
Burdick Range |
Detailed testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
14121005
Dundurn Demolition Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14876001
Landfill Site 34 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14876002
Landfill Site 35 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14876003
Landfill Site 36 |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
14876004
Landfill Site 31 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14876005
Landfill Site 32 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14976001
BATUS P.O.L. Heliport Site |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14976006
Cdn Abandoned Landfill Site (CAL Site) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976008
DRES Low Radioactive Waste Burial Site - EPG |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14976011
DRES 25 Pounder Gun Tower - EPG |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976013
DRES 490 West Area (EPG) Coyote & Rabbit RDS (DRES site 6a) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976014
DRES Radioactive Liquid Spill(Near Fraggle Rock)-AtomicVault |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
14976016
DRES Willis Centre - EPG |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14976018
Cdn Demolished Curling Club B-364 |
Remediation / risk management completed. No further action required. | 2015-2016 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
14976042
490 Site - 604 Layout (EPG) Coyote & Rabbit Rds |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976044
DRES 155mm Gun Tower - EPG |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976046
Base POL Compound |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976047
Refueling Point (Base POL) |
Confirmatory sampling completed. No further action required. | 2010-2011 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14976048
Bldg 312 UST (East End) |
Confirmatory sampling completed. No further action required. | 2010-2011 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14976049
Building 229 (Subsurface Contamination) |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976051
BATUS tank Wask Lagoons Site |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14976054
DRES 490 Inner Compound Building area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
14976055
DRES Chemical Mixing Dumpsite |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976056
DRES Willis Center Trench |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
14976057
DRES Range and Accuracy Layout |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976058
DRES Cameron Center |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
14976062
Serial 19 Trenches (WAD Site B) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14976063
Eagle Site - Contaminated Slew BATUS Tank Incident (WAD A) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
14976064
8 Trenches |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
15166001
ASU Calgary |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
15305003
White Route POL Compound |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15305004
Constructed Fire Training Area |
Remediation / risk management completed. No further action required. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15305005
WW II Garbage Dump |
Remediation / risk management completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15305006
Dump on Shore of Bushy Head Lake |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15305007
Old Ammo Incinerator site |
Long term monitoring completed. No further action required. | 2010-2011 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
15305008
Camp Fish Pond and Area |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
15305009
Former Firing Range 7 |
Initial testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15305010
Range #1 |
Initial testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15335001
Red Deer Armoury |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15529002
Riverbend Receiver Site |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15529018
Cardiff Transmitter Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15531005
Bldg 290 - Lancaster Park |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15531006
Bldg B-4-Griesbach |
Long term monitoring completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
15531007
X-depot Ammo Dump |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15531008
Site CATS- Tank Farm Demolition |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15531009
SAC Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15531013
AMU Building Parking Lot |
Confirmatory sampling completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15531014
Building 305 (APU-TACAN) |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15531015
Former Shell Station CANEX |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
15531016
Building 206 and 208 |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15680002
42 Radar Squadron (Cold Lake) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
15684001
4 AES Runway Training Pad / ATCO Pipeline |
Detailed testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
15684008
Base POL Farm |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684010
Old Imperial Oil Service Station |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684011
Building 111 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684012
Building 170 |
Initial testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15684013
Dry Cleaning |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684015
Small Arms Range |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15684017
Building 83 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684018
Skeet Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15684020
TAC POL Farm |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684021
Asbestos Landfill |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684026
4 Wing Landfarm |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684030
Auto Hobby Club B168 |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15684031
Landfill Site 7 |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15684032
Landfill Site 17 |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684033
Landfill Site 19 |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
15684034
Landfill Site 20 |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
15684035
Landfill Site 5 |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15684036
Landfill Site 6 |
Initial testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15684037
Landfill Site 8 (A/C Burial Site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15684038
Landfill Site 1 |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15684039
Central Heating Plant Investigation |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15729007
300 Meter Range (active) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
15729008
Landfill Site 28 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15729009
Landfill Site 29 |
Initial testing completed. No further action required. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15729010
Landfill Site 30 |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
15730001
PLER POL |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15730002
Jimmy Lake Range |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
15730003
Shaver River Range |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
15730004
Landfill Site 33 |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15730005
F-18 A/C Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
16439011
Salmon Arm Training Area |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
16439013
ASU Chilliwack |
Detailed testing completed. No further action required. | 2010-2011 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
16506001
Slesse Demolition Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
16506002
General Vokes Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
16568001
ALD-1 Aldergrove Former Sewage Lagoon |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
16568002
ALD- 2 Aldergrove Former Skeet Range |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
16749001
Former RCAF Transmitter Site (Richmond) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
16861001
Jericho Beach |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
16872001
Seaforth Armoury |
Initial testing completed. No further action required. | 2011-2012 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
16874004
Bessborough Armoury |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
16876004
Former POL Storage Site at HMCS Discovery |
Confirmatory sampling completed. No further action required. | 2013-2014 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
16876005
Workshop NE Corner of Building 21 at HMCS Discovery |
Confirmatory sampling completed. No further action required. | 2013-2014 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
17008001
New Westminster Armoury |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17132001
PB-1 Pat Bay Septic Tank Location |
Historical review completed. No further action required. | 1995-1996 | 02 Historical Review | |
17132003
PB-4 Pat Bay Fmr Asphalt Plnt previously on Victoria Airport |
Initial testing completed. No further action required. | 2002-2003 | 2 Medium Priority for Action | 03 Initial Testing Program |
17132004
PB-2 Pat Bay Hangar 17 Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17178003
HRR-2 Heals Rifle Range Former Grenade & Trap Shooting Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17178004
HRR-3d Heals Rifle Range Former Incinerator |
Confirmatory sampling completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17178005
HRR-4 Heals Rifle Range Former Bunkers |
Detailed testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 05 Detailed Testing Program |
17337002
BA-1 Bay Street Armouries |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17402002
WP-4a-j Work Point Northeast Region IL/CL |
Detailed testing completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17402003
WP-5 Work Point Southeast Region PMQ 1131 & 1134 RL/PL |
Confirmatory sampling completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17402004
WP-6abcd Work Point Playing Fields Fill IL/CL |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17402005
WP-1 Work Point Vehicle Maintenance Compound IL/CL |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17402006
WP-2 Work Point Golf Hill RL/PL |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17402008
WP-3abce Work Point Macaulay Point Park Fill RL/PL |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17402009
WP-4n Work Point Dry Storage Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
17402011
WP-4l Work Point Former CANEX Gas Station |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 05 Detailed Testing Program |
17403001
DY-1AA Dockyard HQ Bldg 100 |
Remediation / risk management completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17403002
DY-2 Dockyard SW Shoreline B9-Former Firing Range & Landfill |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17403003
DY-4 Dockyard FMF Consolidation |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17403004
DY-1a-ad Dockyard Northwest Region |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17403005
DY-5 Dockyard Bldg 209 - Fmr CHP UST |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
17403007
DY-1AG Dockyard B Jetty Fill |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17403009
Brothers Island |
Initial testing completed. No further action required. | 1997-1998 | 03 Initial Testing Program | |
17403010
DY-7 Dockyard South Coast Shoreline |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
17403011
ESQ-1 - Esquimalt Harbour |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
17404001
DY-3 Dockyard Signal Hill Hood Bldg & Parking Lot |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17404003
DY-6 Dockyard Lyall St. Canex Station |
Confirmatory sampling completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17404004
YA-1 Yarrows Former Hazardous Waste Containment Facility |
Confirmatory sampling completed. No further action required. | 2020-2021 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17404005
YA-2 Yarrows Small Boat Float |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17405002
Inskip Island |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
17406002
NAD-1 Naden Training Area |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
17430001
MH-1 Mary Hill Machine Shop Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17430002
MH-3 Mary Hill Former Rifle Range Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17430004
MH-4 Mary Hill Battery |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17430006
MH-2 Mary Hill Former Rocket Range |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17431001
AH-4 Albert Head Former 100 yd range |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17431002
AH-5 Albert Head- Grenade Range (Active Site) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
17431004
AH-1 Albert Head Barracks - West Central Region |
Detailed testing completed. No further action required. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17432001
RP-1 Rocky Point CFAD Active Propellant Burn Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
17432002
RP-6 Rocky Point CFAD Oily Waste Incinerator |
Remediation / risk management completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17432003
RP-8 Rocky Point Fire Break - Former Burning Slab |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
17432004
RP-2a Rocky Point Active Explosive Ordnance Disposal |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
17432005
RP-3b Rocky Point Former Small Arms Incinerator |
Confirmatory sampling completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17432007
RP-7 Rocky Point Area A Helgesen Point Former Landfill |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17432008
RP-9 Rocky Point CFAD |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
17432009
RP-5 Rocky Point Paper Incinerator |
Initial testing completed. No further action required. | 1995-1996 | 03 Initial Testing Program | |
17432010
RP-2b Rocky Point Former Landfill B |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17432011
RP-3ad Rocky Point Small Arms Slag Dump Former Landfills |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17451001
COL-1a Colwood-Supply Area Northern Incinerator |
Initial testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 03 Initial Testing Program |
17451002
COL-1B-1L Colwood Supply Area Bunkers 44, 45 & 48 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451003
COL-13 Colwood Fleet Diving Unit |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451004
COL-14 Colwood Supply Area Bldg 93 & 112 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
17451005
COL-16 Colwood Supply Area Building 66A |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
17451006
COL-17 Colwood D Jetty |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17451007
COL-8a Colwood Former OWWTP |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451008
BP-1 Belmont Park - Former Canex Gas Station at Building 15 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451010
COL-6 Colwood- Fuel Oil Depot- (Golder IEE Site ''C'') |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451011
COL-12 Colwood Former Contaminated Soil Storage Area |
Confirmatory sampling completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451012
COL-15 Colwood Yew Point - Former Dredgate/Soil Storage |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451013
COL 4 Colwood Fire Fighting Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451014
COL-3 Colwood Interim Storage Facility |
Confirmatory sampling completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451015
COL-5 Colwood Former Tank Farm |
Confirmatory sampling completed. No further action required. | 2022-2023 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451016
COL-7 Colwood Shoreline - Lower Pipeline |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
17451017
COL-11 Colwood Mooring Depot |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451018
COL-9 Colwood- FOD Fmr Sullage Line- (Golder IEE Site I) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451020
COL-10 Colwood Pipline South West of Bldg 220 |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451021
COL-18 Colwood Historical Dump Site |
Long term monitoring completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
17451022
COL-8b Colwood Former Tarpits |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451023
BP-1b Belmont Park - Former Canex Gas Station at Building 17 |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17451024
BP- 2 Belmont Park Garage G1 |
Initial testing completed. No further action required. | 1995-1996 | 03 Initial Testing Program | |
17451025
COL 2 Colwood- Dredgate Disposal Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451026
BP-4 Belmont Park Garage |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
17451027
BP-5 Belmont Park Garage G-2 |
Initial testing completed. No further action required. | 1995-1996 | 03 Initial Testing Program | |
17451028
BP-6 Belmont Park Garages |
Initial testing completed. No further action required. | 1995-1996 | 03 Initial Testing Program | |
17451029
Mc Carthy Island |
Initial testing completed. No further action required. | 1996-1997 | 03 Initial Testing Program | |
17451030
Smart Island |
Initial testing completed. No further action required. | 1996-1997 | 03 Initial Testing Program | |
17451031
BP-3 Belmont Park Personal Vehicle Area |
Initial testing completed. No further action required. | 1995-1996 | 03 Initial Testing Program | |
17452001
RRU-1 Royal Roads University Former 25 Yd Range |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
17452002
RRU-2 Royal Roads University- Small Lakes Area |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17452004
RRU-4 Royal Roads University- Former Landfill |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17452005
RRU-5 Royal Roads University- Former Gravel Pit |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17452006
Royal Roads University RRU-6 |
Remediation / risk management completed. No further action required. | 2022-2023 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
17452007
RRU-7 Royal Roads University Abandoned Concrete Tank |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17452008
RRU-8 Royal Roads University Dunsmuir Bottle Dump |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17452009
RRU-9 Royal Roads University Sewerline allignment |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
17452010
RRU-10 Royal Roads University Former Ash Disposal Area |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
17452011
RRU-11 Royal Roads University-Lagoon Former Landfill |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
17452012
RRU-12 Royal Roads University Former Skeet Range |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17452013
RRU-13 Royal Roads University-Fmr UST Pool Bldg |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17452014
RRU-3 Royal Roads University Boathouse Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
17591003
NRR- 2 Nanaimo Rifle Range- Small Dump Site |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
17591004
NRR-4 Nanaimo Rifle Range Dump Site |
Confirmatory sampling completed. No further action required. | 2020-2021 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17966001
Seal Bay Transmitter Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17966002
CCG Bldg at Seal Bay Tx Site |
Initial testing completed. No further action required. | 2004-2005 | 03 Initial Testing Program | |
17967001
Hangar 14 |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17967002
B71 - EGS Building |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17968001
MQ 79 Elm Street |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17968002
MQ 48 Cedar Crescent |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17970001
High Speed Refueling Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17970003
Refuelling Vehicle Compound near B-100 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17970004
Lower Tankfarm |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
17970005
BLD 19 DIAC |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
17970008
B36- WASF and MP Offices |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17970009
Bld 101 Mobile Support Equipment |
Long term monitoring completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
17970010
Building 32 - Roads and Grounds |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
17970012
Comox FFTA (non-PFAS) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17970013
Building 118 - Armament HQ |
Initial testing completed. No further action required. | 2002-2003 | N Not a Priority for Action | 03 Initial Testing Program |
17970014
Comox Tank farm |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
18704002
Vernon Mt Commonage 300m Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18705001
Land Parcel at VACC |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
18976001
Power Plant at Det Holberg |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19341001
MA-1 Masset Rifle Range |
Remediation / risk management completed. No further action required. | 2020-2021 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20247006
Alert Main Station |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
20247016
Alert Main Station Landfill |
Long term monitoring completed. No further action required. | 2017-2018 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
20247023
Alert 50 Line GP Huts Drainage |
Detailed testing completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
20247024
Alert Dump # 3 |
Long term monitoring completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
20247025
Alert TX Site |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
20247042
Sewage Outfall |
Long term monitoring completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
20247043
Lower Dumbell Lake |
Confirmatory sampling completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
20612001
Float Dock 440 Sqn Yellowknife |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
22495001
Saguenay Armoury pipe between buildings 282 and 283# |
Confirmatory sampling completed. No further action required. | 2017-2018 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757001
Small calibre (Former dump), DRDC-South |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757002
Dry material (former dump for), DRDC-South |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757003
Atmosphere simulation (former dump), DRDC-South |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757004
Pole park, DRDC-North |
Detailed testing completed. No further action required. | 2010-2011 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
29757005
Sector for bldg 307, DRDC-Trials |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757006
''MDR'' (former dump for), DRDC-Trials |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757007
TCE Contamination- Valcartier |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
29757008
Dry material 2,500 m (former dump for), DRDC-Trials |
Detailed testing completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
29757009
Plateau (demolition site), DRDC-Trials |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757010
Entry route ditch DRDC-South (drain SNC TEC/DRDC-South) |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
29757011
Former stop-butt, bldg 321 (S8-1), DRDC-South |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757012
Former stop-butts 341-316, DRDC-South (S14) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757013
Former stop-butt, bldg 342 (S9-1), DRDC-South |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757014
South Outfall, DRDC-South |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
29757015
Former boiler room (bldg 241), DRDC-South |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757016
Former Firing Temp for SNC Tec site (ZIP 1), Donnacona Block |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
29757017
Former firing temp formed by Donnacona Block (ZIP 2) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
29757018
Former stop-butt, DRDC-South (ZIP 3) |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
29757019
Former OB and Grenades Area, South DRDC |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
29757020
Former Impact Area (rebound/ricochet) Donnacona Blck(ZIP 5) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
29757021
Main trail, Donnacona Block (ZIP 6) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
29757022
Former stop-butt for building 235, DRDC-South |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
29757023
Former waste demolition and dump site (N4-1), DRDC-North |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
29757024
North Outfall, DRDC-North |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
29757025
Stop-butts 207 and 211, DRDC-South (S6) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
29757026
Perchlorate (administrative sector) |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
29763002
CFS St Johns(5010) - Emerald Vale Training Centre |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
29793001
Former Red Route Dump East Site |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
30333001
PA-1 Port Alberni Armoury |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
30872002
Grand Falls Armoury |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32039001
Disposed-British Prop.No1, Site 5(6201)Garage/waste oil tank |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32039002
Disposed -British Prop.No1,Site5 (6202)Yard/fill area,tanks. |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32039003
Disposed -British Prop. No1,Site 5(6203)-Former Machine Shop |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32041001
Disposed-British Prop.No4,Site15 (6303)E side pop/bulk tanks |
Confirmatory sampling completed. No further action required. | 2019-2020 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32044001
CFS St Johns (4910) - Southside Road Tank Farm |
Remediation / risk management completed. No further action required. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
32044002
CFS St Johns (5210) - Shea Height's Tank Farm |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
32046002
Pier 26 (5301) - British Property Site 7c (Cabot Boatshed) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32047002
Pier 27 (5302) - Brit. Prop. Site 7c |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32057002
Demolition Area |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32057003
Armament Storage Area |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32743001
Harvey Barracks - Entire Barracks and Practice Areas |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32771001
Springhill Armoury (3601) - Armoury Building |
Long term monitoring completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
33263001
Walkley/Holland POL Storage Area |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
33270001
HMCS Gloucester |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
34187001
Main camp Gravel Area-Cloud Lake Cadet Camp |
Historical review completed. No further action required. | 2002-2003 | N Not a Priority for Action | 02 Historical Review |
34337001
MAL-1 HMCS Malahat |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
34337002
VIC-1 HMCS Malahat Waterlot |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34422003
BAF-3 LRR (Brevoort) - Pallet Line - Lower |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
34422005
BAF-3 LRR (Brevoort) - Broken Sewage Line |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34422006
BAF-3 Brevoort Island LRR |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
34429001
BAR-2 LRR Site, Shingle Point - Under the garage |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
34430001
Northern Fuel Cache Site - Resolution Island |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
34446001
PIN-1BG SRR (Croker River) - Site Summit |
Remediation / risk management completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
34452001
BAR-BA3 SRR (Storm Hills, NWTel Parson's Lake) Site Summit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34476001
Mountain View - Outer Landfill Site |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34476004
Mtn View - Inner Landfill Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
36056001
Water Lots (9912), Navy Buoys |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
36185001
Present Skeet Range |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
37203001
Pierce Creek Training Area/Landfill |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
52106002
Fergusons Cove (1501) - Sound Range Building |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
52107001
Water lots(9905),Harbour Front (Naval staff house) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
52254001
Ashton Armouries |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
56482008
Wrangle Bay (site 8) |
Initial testing completed. No further action required. | 2014-2015 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
57358001
Windsor Armoury (4401) - Reserve Armoury |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
57358002
Windsor Armoury (4402) - Original Reserve Armoury |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
57398001
HMCS Radisson, disposal field |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
58321001
Hunt Club Road Pinestand Property, Ottawa Airport |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321002
Pipeline (near Tank Farm), 7 Wing CFB Ottawa |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321003
Former Central Heating Plant (Building 309), Uplands |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321004
Uplands Marina, CFSU Ottawa |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
58321005
CFSU(O) Uplands PMQ Trailer Storage Compound |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321006
Uplands - decommissioned oil filled high voltage cables |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321007
Uplands Bldg 329 (Bell Building) Former UST |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
58321008
CFSU Uplands Alert Road former Dump |
Initial testing completed. No further action required. | 2004-2005 | N Not a Priority for Action | 03 Initial Testing Program |
58321009
Uplands Self-Help Housing Maintenance Compound |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321010
Former USTs at the PMQs at Uplands |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321011
Uplands Former Tank Farm |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58322001
Golf Course Maintenance Compound (401), CFB Ottawa (south) |
Long term monitoring completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
58328001
DYE-M LRR (Cape Dyer) - Beach POL Storage Area |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58374001
Trail Stoney Creek Training & Demolition Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
58520001
Rimouski Naval Reserve, Montée Industrielle street |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
58520002
Rimouski Naval Reserve, boathouse |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
69610001
LAB-2 LRR Site (Saglek, Labrador) Staging Area |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
69610003
LAB-2 LRR (Saglek, Labrador) Sealift Beach Area |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
69610006
LAB-2 LRR (Saglek, Labrador) Old Airstrip Building |
Remediation / risk management completed. No further action required. | 2009-2010 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
69613001
LAB-3 SRR (Cape Kiglapait) Summit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
69735001
Trail - Casino Ranges |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
69765001
CAM-2 SRR (Gladman Point) - Site Summit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
69766001
CAM-D SRR (Simpson Lake) - Site Summit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
69775001
FOX-B SRR (Nadluardjuk Lake) - North-West of site summit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
69778001
BAF-5 SRR (Resolution Island) - Beside road |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
69813001
New Glasgow Armoury (7101) - Vac Lot Proposed Armoury Site |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
69814001
Mount Bourbeau - Former Chibougamau radar station |
Confirmatory sampling completed. No further action required. | 2013-2014 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
69920001
HMCS Champlain - Chicoutimi Naval Reserve |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
69968001
FOL IQALUIT - Nose dock hangar (T-325) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
70002001
PIN-3 LRR, Lady Franklin Point - Site Summit |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70011001
Upper Indian Pond Firing Range |
Confirmatory sampling completed. No further action required. | 2014-2015 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70019001
FOX-M LRR (Hall Beach, NU - Landfill) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
70069003
Eureka (Soil sampling) |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
70069005
Eureka - East Airstrip Landfill |
Detailed testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
70069006
EC Eureka - Sewage Lagoon |
Detailed testing completed. No further action required. | 2015-2016 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
70069009
Eureka (Hist review cont sites) |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
70069010
Eureka - West Airstrip Landfill |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
70069013
DND - Eureka - New Grey Water Outfall |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
70069014
Eureka North Apron POL |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70069015
Eureka - South Airstrip Dump |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
70070001
CAM-M LRR (Cambridge Bay, NU - Landfill) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
70602001
Former No.1 Canadian Forces Supply Depot (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602002
Central Heating Plant (Downsview) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602003
Fire Fighting Training Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602004
Auto Hobby Club Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602005
Construction Engineering Section (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602006
Former Sewage Treatment Plant (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602007
Building 103 (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602008
Building 100 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602009
Former building 102 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602010
Former Bunker 'C' DeHavilland Plant Area (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602011
Plant 1 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602012
Plant 2 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602013
Plant 3 Former DeHavilland Plant Area (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602014
Gravel Parking Lot Construction Eng. Section (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602015
Former POL Compound Building 107 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
70602016
Former USTs Building 107 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
70602017
Former Building 115 (Downsview) |
Initial testing completed. No further action required. | 2001-2002 | 2 Medium Priority for Action | 03 Initial Testing Program |
70602018
Former building 131 (Downsview) |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70602019
Downsview Closure |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7007001
DEW-Line: BAR-1 Komakuk Beach |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7008001
DEW-Line - BAR-2 Shingle Point |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7009001
DEW-Line - BAR-3 Tuktoyaktuk |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7010001
DEW-Line - BAR-4 Nicholson Peninsula |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7011001
DEW-Line - PIN-M Cape Parry |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7012001
DEW-Line - PIN-1 Clinton Point |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7013001
DEW-Line - PIN-2 Cape Young |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7014001
DEW-Line - CAM-M Cambridge Bay |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7015001
DEW Line - PIN-4 Byron Bay |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7016001
DEW-Line - PIN-3 Lady Franklin Point |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7017001
DEW-Line - CAM-1 Jenny Lind Island |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7018001
DEW-Line CAM-2 Gladman Point |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7019001
DEW-Line - CAM-4 Pelly Bay |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7020001
DEW-Line - CAM-5 Mackar Inlet |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7021001
DEW-Line - FOX-M Hall Beach |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7022001
DEW-Line-FOX-2 Longstaff Bluff |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7023001
DEW-Line - FOX-3 Dewar Lakes |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7024001
DEW Line FOX-4 Cape Hooper |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7025001
DEW Line-FOX-5 Broughton Island |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7026001
DEW-Line - DYE-M Cape Dyer |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7027001
DEW-Line - CAM-3 Shepherd Bay |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7028001
Disposed - Former CFB Chiliwack Sandbast area |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C7029001
Disposed - Former CFB Chilliwack |
Long term monitoring completed. No further action required. | 2013-2014 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
N7002001
Tracadie |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7003001
Cornwallis |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7008001
1998 GAF Crash Site (CRA13020) |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
N7009001
LG2 RAF Crash Site (1996) (CRA13030) |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
N7019001
Northern Fuel Cache Site - Cartwright (Chopper Pad site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N7020001
Northern Fuel Cache Site - Hopedale |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N7021001
Northern Fuel Cache - Mary's Harbor |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
N7022001
Northern Fuel Cache Site - Nain |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 05 Detailed Testing Program |
N7023001
Northern Fuel Cache Site - Lake Harbour Nunavut |
Initial testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N7024001
Northern Fuel Cache Site - Quaqtaq |
Initial testing completed. No further action required. | 2001-2002 | 03 Initial Testing Program | |
N7040001
Saglek Bay Sediments |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7041001
Northern Fuel Cache Site - Border Beacon |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
N7047001
Prince Rupert Tank Farm |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7048001
Pat Bay Former POLCompound |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
N7054001
Penhold |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
N7056001
St. Pierre Lake Range - CYR 606 |
Confirmatory sampling completed. No further action required. | 2006-2007 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7057001
CFB Chatham |
Confirmatory sampling completed. No further action required. | 2021-2022 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7058001
Cornwallis |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7060001
Former Red Route Dump |
Initial testing completed. No further action required. | 2023-2024 | 03 Initial Testing Program | |
N7068001
Northern Fuel Cache Site - Argentia |
Initial testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N7069001
Griesbach Barracks |
Confirmatory sampling completed. No further action required. | 2014-2015 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7070001
Fire Fighting Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7071001
Bldg 187 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7072001
Building A-3 |
Initial testing completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 03 Initial Testing Program |
N7073001
Building L-2 |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 05 Detailed Testing Program |
N7074001
Old Navy Site - Old Landfill |
Remediation / risk management completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N7075001
Dome Mountain, RCAF and Camp Sites (5 W) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
N7076001
2000 GAF Crash Site (CRA13040) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
N7077001
Main Gate & Hamilton River Road Plume (UPL 16000 series) 5W |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N7078001
Stephenville Armoury |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N7079001
Northern Fuel Cache Site Eon Lake |
Initial testing completed. No further action required. | 2002-2003 | N Not a Priority for Action | 03 Initial Testing Program |
N7081001
BAR-E SRR (Horton River) - Site Summit |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N7083001
BAR-E SRR (Horton River) - Site Summit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N7084001
North Sydney Armoury (3002) - B35 |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7086001
Possible Landfill Sites (Penhold) |
Detailed testing completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 05 Detailed Testing Program |
N7087001
5 Wing Practice Target Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N7089001
Disposed - Mason St. Garage (2401) - Former POL/Storage Area |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
N7090001
Disposed- Mason St.Garage (2402) Former Diesel UST & Pump |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7091001
Disposed - Mason St Garage (2403) - Maintenance Garage (B1) |
Remediation / risk management completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N7092001
Disposed - Mason St Garage (2404) - Office Storage Building |
Detailed testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
N7093001
CF-18 Crash Site - A/C 188745 (Aug. 05) |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7095001
Former CFS Sydney |
Confirmatory sampling completed. No further action required. | 2020-2021 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7096001
Former CFS Moisie - Site Admin |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |