Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.


Section II - Detailed Analysis by Program Activity

Strategic Outcome

A highly competent, non-partisan and representative public service, able to provide service in both official languages, in which appointments are based on the values of fairness, access, representativeness and transparency.

The Public Service Commission (PSC) contributes to the achievement of this strategic outcome by helping to ensure staffing that respects merit is carried out across the public service. This is achieved when staffing activities adhere to the values of merit, non-partisanship, fairness, access and transparency.

The following performance indicator was identified to monitor the achievement of the PSC's strategic outcome.


Performance Indicator Strategy, Target & Reporting Frequency
Percentage of small, medium and large departments or agencies with fully satisfactory or better rating of staffing performance with respect to public service-wide staffing values and management principles.

Performance Measurement Strategy:

In 2006-2007, the PSC will report on progress towards the development of tools and mechanisms to measure departmental staffing performance.

Target: To be determined after one year of baseline data.

Reporting Frequency: Annual


The PSC identified two program activities to contribute to the achievement of the strategic outcome.

The first activity, Appointment Integrity and Political Neutrality, is aimed at ensuring that the appropriate policies, procedures, incentives and controls are in place to protect the integrity of the public service staffing system, including protecting the impartiality of the public service with respect to the political activities of employees. The second activity, Recruitment and Assessment Services, provides both mandatory and optional recruitment and resourcing services to departmental clients, in accordance with the policy framework developed by the PSC. This activity ensures that services and products are consistent with staffing policies and that clients are satisfied.

In June 2006, a new Program Activity Architecture (PAA) was approved. It provides clarification of PSC responsibilities under the new PSEA. The new PAA will be reflected in our 2007-2008 Report on Plans and Priorities and Departmental Performance Report. The primary change to the PAA is the creation of a new Program Activity, Oversight of Integrity of Staffing and Political Neutrality, that includes PSC monitoring of delegated authorities, audits, studies and evaluation and investigations and early resolution mechanisms. This new Program Activity presents a clear delineation between the PSC's policy and oversight functions.

Program Activity 1 - Appointment Integrity and Political Neutrality

Program Activity Description

The Appointment Integrity and Political Neutrality activity develops, maintains and monitors the implementation of a policy and regulatory framework for safeguarding the integrity of public service staffing and ensuring political neutrality. This activity includes establishing policies and standards, delegation and oversight of appointment authorities to departments and agencies, and administering non-delegated authorities such as priority administration. This activity also includes conducting audits, studies, investigations and inquiries, as well as administering the appeal process under the former Public Service Employment Act and reporting to Parliament on the integrity of public service staffing.

Program Activity 1 - Appointment Integrity and Political Neutrality: supports priority I - Fully implement the new PSEA and solidify the PSC's independence; and priority III - Ensure proper oversight and accountability to Parliament.

In order to ensure that this program activity is on track, the following expected results and performance indicators have been established.


Expected Results Performance Indicators
Enhanced protection of the integrity of public service staffing. Percentage of small, medium and large departments or agencies with fully satisfactory or better rating of staffing performance with respect to staffing management and expectations for a well-managed staffing system.

Performance Measurement Strategy:

In 2006-2007, the PSC will report on progress towards the development of tools and mechanisms to measure departmental staffing performance.

Target: To be determined after one year of baseline data.

Reporting Frequency: Annual

Strengthened accountability from the Commission to Parliament regarding the integrity of public service staffing.

The number of potential PSC appearances before parliamentary committees measured against the number of actual appearances.

Performance Measurement Strategies:

  • determine the number of potential PSC appearances before parliamentary committees; and
  • analyze the number and results of actual appearances compared to potential PSC appearances.

Target: To be determined after one year of baseline data.

Reporting Frequency: Annual

Number of committee hearings on PSC issues.

Performance Measurement Strategy:

  • determine the number of times the PSC has appeared before parliamentary committees during the reporting period.

Target: Increase over previous year.

Reporting Frequency: Annual

Departments have implemented PSC audit recommendations.

Percentage of audit recommendations implemented.

Performance Measurement Strategy:

  • develop and implement formal reports and follow-up mechanisms and plan.

Target: To be determined after a year cycle.

Reporting Frequency: Annual

Protection of the impartiality of the public service with respect to political activities of employees while respecting the political rights of employees.

Study findings of the effectiveness of policies, procedures and decisions related to the political activities of public service employees.

Performance Measurement Strategy:

  • develop and implement an evaluation framework and plan.

Target: Satisfactory study findings.

Reporting Frequency: Every three-to-five years, or timed to coincide with the five-year review of the new PSEA.


Related Resources (Note 1)


Resources 2006-2007 2007-2008 2008-2009
Financial ($ thousands) 41,519 42,381 42,381
FTE 392 435 435

Note 1: Resources exclude funding for EX-Resourcing Services ($5,744K for 2006-2007 and $6,803K for each of 2007-2008 and 2008-2009) that are presented under Program Activity 1 - Appointment Integrity and Political Neutrality in the Main Estimates. These funds are reflected under Program Activity 2 - Recruitment and Assessment Services in the RPP. The 2007-2008 and 2008-2009 figures also reflect internal reallocations pertaining to the audit function.

To achieve the expected results of Program Activity 1, the PSC will focus, over the three-year planning period, on the following key programs and services, expected results, performance indicators and plans:

Policy, Regulation, Guidelines and Exclusion Approval Orders (EAO)


Expected Result & Performance Indicator Plans

Expected Result: Policy instruments achieve their objectives with respect to political neutrality and fair, effective and timely staffing in a delegated environment.

Performance indicator: Study findings of the effectiveness of selected policy areas, procedures and decisions including political activities.

Performance Measurement Strategy:

  • develop and implement the evaluation plan.

Target: Satisfactory study findings.

Reporting Frequency: Annual, at least one policy instrument assessed each year.

  • Provide continuous support to departments and agencies through advice, interpretation, guidance, and sharing of best practices;
  • Refine PSC policy instruments, regulations, guidelines and EAOs related to appointments and political activities and review or develop new instruments, guidance and tools as required;
  • Support implementation of National Area of Selection (NAoS) and assess/report on the impact;
  • Review Public Service Staffing Tribunal (PSST) complaints and intervene where appropriate, as well as disseminate lessons learned;
  • Review Governor in Council Designation Order for organizations participating in internal nomination processes; develop and implement an approach for deployments from separate agencies;
  • Provide advice on the right of public servants to engage in political activities while maintaining the impartiality of the public service; and assess candidacy requests of public servants;
  • Develop future-oriented vision for the PSC as an independent agency reporting to Parliament;
  • Contribute to the parliamentary review of the Employment Equity Act; and
  • Contribute to PSC position for five- year parliamentary review of PSEA.

Related Financial Resources ($ thousands)


2006-2007 2007-2008 2008-2009
7,122 7,412 7,412

Appointment Delegation and Accountability Agreements and Accountability Assessments

Expected Results & Performance Indicators Plans

Expected Result 1: Increasingly well managed delegated authorities.

Performance indicator: Number of delegations restricted or removed by the PSC.

Performance Measurement Strategy:

  • develop process to restrict or revoke delegation.

Target: Decrease from number in previous year.

Reporting Frequency: Annual

  • Perform regular reviews of all Appointment Delegation and Accountability Agreements (ADAI) signed with departments and agencies (approximately 80) to ensure deputy heads are properly exercising their delegated legal authorities; revise, modify or restrict ADAIs as appropriate.

Expected Result 2: More effective accountability between the PSC and deputies with respect to staffing.

Performance indicator: Number of departments fully meeting staffing reporting requirements.

Performance Measurement Strategies:

  • assess reporting (completeness, consistency, and reliability); and
  • establish quality control process to ensure the integrity and objectivity of the assessment process.

Target: Annual target to be determined based on an increase of at least one fully satisfactory department/agency compared to previous year results; the longer-term target is 100%.

Reporting frequency: Annual

  • Refine and modify tools and products (guides, policies, interpretation support) required to support delegated organizations to ensure departments and agencies have the necessary information to legally manage their staffing authorities; and
  • Monitor the delegation of PSC authorities to approximately 80 organizations through the implementation of integrated risk management strategy which includes active monitoring, information gathering and reporting; put in place remedial measures when non-compliance occurs.

Related Financial Resources ($ thousands)


2006-2007 2007-2008 2008-2009
8,594 9,963 9,963

Non-Delegated Authorities

Expected Results & Performance Indicator Plans

Expected Result : Proper consideration for appointments with priority rights.

Performance indicator: Percentage of individuals with priority rights appointed.

Performance Measurement Strategy:

  • collect data from the system.

Target: Increase over previous year.

Reporting frequency: Annual

  • Oversee the priority entitlements process to ensure the integrity of non-delegated Ministers' staff and Governor General's Office appointments:
  • determine whether exempt staff in Ministers' offices and the Office of the Governor General's Secretary meet the criteria to receive priority entitlement, as set out in legislation.
  • Oversee priority entitlements process to ensure departments and agencies respect legislation, policies and delegated authorities:
  • monitor 30,000 to 40,000 staffing processes where priorities must be considered; and
  • verify entitlements for 1,000 or more priority persons and ensure they are informed of their rights and obligations.
  • Monitor the application of the Official Languages Exclusion Approval Order (OLEAO):
  • monitor data and cases of 70 or more departments on their use of the OLEAO's provisions for extensions; and
  • grant exclusions under the OLEAO according to accepted criteria.

Related Financial Resources ($ thousands) (Note 1)


2006-2007 2007-2008 2008-2009
4,241 2,885 2,885

Note 1: Resources exclude funding for EX-Resourcing Services ($5,744K for 2006-2007 and $6,803K for each of 2007-2008 and 2008-2009) that are presented under Program Activity 1 - Appointment Integrity and Political Neutrality in the Main Estimates. These funds are reflected under Program Activity 2 - Recruitment and Assessment Services in the RPP.

Audits and Studies


Expected Result & Performance Indicator Plans

Expected Result : Departments understand reports, and follow up on issues we report.

Performance indicator: Percentage of audit recommendations accepted.

Performance Measurement Strategy:

  • develop and implement formal reports and follow-up mechanisms and plan.

Target: To be determined after a year cycle.

Reporting frequency: Annual

  • Perform independent audits and studies that are relevant and meet quality assurance standards (approximately six audits and two studies per year);
  • Build the capacity of the audit function by continuing to establish audit processes and methodology, by strengthening a risk-based planning system for the selection of audits and studies, and by establishing a human resources plan including recruitment and learning strategies;
  • Support the longer-term planning of audits and studies by developing an evaluation framework for the five-year review of the new PSEA;
  • Establish an independent audit advisory committee comprised of senior external experts to review audit plans and findings; and
  • Provide appointment data and analysis and maintain related information system to support the PSC's oversight role and the information needs of department and agencies.

Related Financial Resources ($ thousands)


2006-2007 2007-2008 2008-2009
11,798 12,396 12,396

Investigations, Appeals, Inquiries and Alternate Dispute Resolution (ADR) Processes


Expected Results & Performance Indicators Plans

Expected Result 1: Fair, effective, informal and expeditious investigation activities, using the principles of natural justice.

Performance indicator 1: Study findings of the fairness, effectiveness, expediency and informal nature of investigation activities.

Performance Measurement Strategy:

  • develop and implement an evaluation plan.

Target: Satisfactory study findings.

Reporting frequency: Annual

  • Finalize the implementation of a new operational framework and process for investigations to enhance oversight capacity including policies, guidelines and procedures for the PSC mandated investigations, deputy head requested investigations and political activities investigations;
  • Continue building Investigations Branch capacity through developmental program, recruitment and knowledge transfer initiatives, as well as learning strategies;
Performance indicator 2: Percentage of investigation activities resolved through Alternative Dispute Resolution (ADR) processes, where appropriate.

Performance Measurement Strategy:

  • collect data from the system.

Target: Increase over previous year.

Reporting frequency: Annual

  • Conduct ADR processes for mandated investigations, where appropriate, under the new PSEA, as well as early interventions and mediation for appeals and investigations under the old PSEA; and
  • Conduct investigations under the new PSEA. (up to 700 requests for investigations each year)

Expected Result 2: Fair and timely resolution of appeals and investigations under the old PSEA.

Performance indicator: Average completion time.

Performance Measurement Strategies:

  • collect data from the system on disposal time of appeals; and
  • develop and implement service standards for investigations.

Target: Improvement over previous year.

Reporting frequency: Annual

  • Continue to hear appeals and conduct investigations to complete the load of cases being received under the old PSEA. (average 3,000 appeals under the old PSEA)

Related Financial Resources ($ thousands)


2006-2007 2007-2008 2008-2009
9,764 9,725 9,725

Program Activity 2 - Recruitment and Assessment Services

Program Activity Description

The Recruitment and Assessment Services activity develops and maintains the resourcing systems that link Canadians and public servants seeking employment opportunities in the federal public service with hiring departments and agencies. It provides assessment-related products and services in the form of research and development, consultation, assessment operations and counselling for use in recruitment, selection and development throughout the federal public service. This activity also includes delivering resourcing services, programs and products to departments and agencies, to Canadians and public servants, through client service units located across Canada.

Program Activity 2 - Recruitment and Assessment Services: supports priority II - Provide recruitment and assessment services that respond to the needs of delegated managers and Canadians.

The Public Service Modernization Act (PSMA) was fully implemented on

December 31, 2005. The PSC is delivering services under the new PSEA while completing requests submitted under the old Act.

The 2006-2007 fiscal year will be characterized by a transformation in the way the PSC delivers its services under the new PSEA. The Public Service Resourcing System (PSRS), a Web-based automated external staffing tool, will be made available directly to selected departments and agencies. The PSC's transactional work will be complemented by an advisory role in order to maximize clients' use of the staffing flexibilities available under the new law. The National Area of Selection (NAoS), which provides access for Canadians across the country to federal public service jobs open to the public will begin in April 2006, with officer-level positions in the National Capital Region.

In 2007-2008, we will establish our resourcing standards for new products and services and establish a baseline for the subsequent year. We will continue to make PSRS available to other departments and agencies.

In order to ensure that this program activity is on track, the following expected results and performance indicators have been established.


Expected Results Performance Indicators
Recruitment, staffing and assessment services and products meet the business needs of clients and are consistent with the PSC staffing policies. Study findings and client consultations results.

Performance measurement strategies:

  • conduct client consultations to identify needs, or studies to identify markets. As standards for new products and services and client satisfaction surveys are implemented, measurement of client satisfaction.

Target: Satisfactory study findings.

Reporting Frequency: three-year cycle

Clients are satisfied with recruitment and staffing and assessment services and products.

Percentage of departmental clients satisfied or very satisfied overall with recruitment and assessment services.

Performance Measurement Strategies:

  • review existing recruitment and assessment standards and communications to clients (2006-2007);
  • conduct client satisfaction surveys (2007-2008); and
  • establish resourcing service standards for new products and services and baseline for the subsequent year (2007-2008).

Target: 85%

Reporting Frequency: Annual


Related Resources


Resources (Note 1) 2006-2007 2007-2008 2008-2009
Financial ($ thousands) 63,275 55,058 54,501
FTE 634 620 622

Note 1: The 2006-2007 financial resources include respendable revenue from assessment and counselling services in the amount of $6,000K as well as funding for continued work on PSRS. Resources include funding for EX Resourcing Services ($5,744K for 2006-2007 and $6,803K for each of 2007-2008 and 2008-2009) that are presented under Program Activity 1: Appointment Integrity and Political Neutrality, in the Main Estimates. The 2007-2008 and 2008-2009 figures also reflect internal reallocations pertaining to the audit function as well as additional funding for the PSRS ($5,383K in 2007-2008 and $5,037K in 2008-2009).

Work is currently under way to obtain continued authority to respend revenue and to secure funding for a long term government-wide e-resourcing solution.

To achieve the expected results of Program Activity 2, the PSC will focus, over the three-year planning period, on the following key programs and activities, expected results, performance indicators and plans:

Recruitment and Staffing Services (jobs posted, applications processed, candidates screened, and referrals made)


Expected Results & Performance Indicators Plans

Expected Result 1: Recruitment services delivered within service standards.

Performance indicator: Percentage of recruitment services delivered meeting service standards.

Performance Measurement Strategies:

  • review existing service standards and communicate them to clients; conduct consultations with clients; and develop performance measurement tool to measure our standards (2006-2007);
  • develop, pre-test and implement a client satisfaction survey, and conduct client consultations (2007-2008); and
  • monitor standards and client satisfaction (2008-2009).

Target: To be determined after one year of data collection.

Reporting frequency: Annual

  • Deliver high-quality general and corporate recruitment services, programs and products customized to the new PSEA to departments and agencies, Canadians and public servants, through client service units located across Canada. Corporate programs include the Federal Student Work Experience program, Post-Secondary Recruitment program and Research Affiliate program. (2006-2007 forecasted volume: 3,700 requests for corporate recruitment and 7,500 requests for general recruitment);
  • Provide delegated staffing and recruitment services to departments and agencies under new service agreements; and
  • Maximize opportunities under the new PSEA and conduct consultations with clients to facilitate the implementation of NAoS and the development of new products and services.

Expected Result 2: Fair, effective and responsive staffing of executives across the public service.

Performance indicator:

Service improvements resulting from client consultations.

Performance Measurement Strategy:

  • conduct consultations with clients and adjust services based on results of consultations.

Target:

To be determined after one year of data collection.

  • Provide executive staffing services to departments and agencies (2006-2007 forecasted volume: 500 executive staffing actions initiated and 450 executive staffing appointments); and
  • Conduct client consultations to assess needs and identify service improvements.

Related Financial Resources ($ thousands) (Note 1)


2006-2007 2007-2008 2008-2009
30,052 32,384 32,373

Note 1: Resources include funding for EX Resourcing Services ($5,744K for 2006-2007 and $6,803K for each of 2007-2008 and 2008-2009) that are presented under Program Activity 1: Appointment Integrity and Political Neutrality, in the Main Estimates.

Assessment Services (assessment tools, instruments and products)


Expected Result & Performance Indicator Plans

Expected Result: Assessment services delivered within service standards.

Performance indicator: Percentage of assessment services delivered meeting service standards.

Performance Measurement Strategy:

  • implement and monitor service standards and client satisfaction.

Target: To be determined after one year of data collection.

Reporting frequency: Annual

  • Provide assessment-related development, operational, research and consultation services and products for use in recruitment, selection and development throughout the federal public service through appropriation and cost recovery. (2006-2007 forecasted volume: Testing: 115,000 tests administered, including 64,000 second language evaluations; Number of new products modified or developed: 30);
  • Develop and update instruments and procedures including Second Language Evaluation;
  • Establish an e-testing implementation strategy and priorities in 2006-2007 and stabilize e-testing operations in 2007-2008; and
  • Prepare a Treasury Board submission seeking continued authority to respend revenue beyond 2006-2007.

Related Financial Resources ($ thousands) (Note 1)


2006-2007 2007-2008 2008-2009
13,394 10,806 10,603

Note 1: The 2006-2007 financial resources include $6,000K in respendable revenue from Assessment and Counselling Services and Products. The PSC plans to seek continued authority to respend its revenue in future years.

Client Services (electronic resourcing systems, assessment systems and operational policies)


Expected Results & Performance Indicators Plans

Expected Result 1: Timely supply of suitable candidates.

Performance indicator: Average time to supply candidates.

Performance Measurement Strategy:

following the establishment of service standards, introduce qualitative candidate information in the client satisfaction surveys and collection of timeliness indicator from e-resourcing tool.

Target: To be determined after one year of data collection.

Reporting frequency: Annual

  • Develop and implement new corporate recruitment programs to respond to client needs;
  • Perform external labour market analyses; and
  • Develop marketing strategies material, assess departmental and agency need and translate them into technological solutions.

Expected Result 2: Increased efficiencies through faster screening and referrals and more manageable numbers of referrals.

Performance indicators:

  • Statistical evidence of faster screening and referrals; and
  • Statistical evidence of fewer referrals.

Performance Measurement Strategy:

  • data collection from surveys and PSRS performance reports.

Target: To be determined after one year of data collection.

Reporting frequency: Annual

  • Support implementation of e-resourcing to departments and agencies, aligned with the Government's agenda on Corporate Administrative Shared Services and HR modernization. (2006-2007: 12 federal departments will implement PSRS); and
  • Initiate the long-term government-wide e-resourcing project if buy-in, support and funding is available.

Related Financial Resources ($ thousands) (Note 1)


2006-2007 2007-2008 2008-2009
19,829 11,868 11,525

Note 1: The financial resources include funding for the deployment of PSRS to departments. Work is under way to secure funding for the long-term government-wide e-resourcing project.

Management Priorities

Striving for Management Excellence

The PSC is committed to modelling management and stewardship of its financial resources, proactively managing its strategic and operational risks, and building an environment that makes the most of the quality and dedication of its people.

Attaining excellence in the management of financial and human resources is key to gaining more flexibility for resource management. Transforming the way we manage our resources is critical if the PSC is to be recognized as truly independent. The following commitments support our fourth priority: to become a model organization for human and financial resources management.

The PSC's management of resources is integrated and effective

To fulfill its mandate, the PSC must function as independently as possible. Our plans, therefore, include pursuing more independent funding mechanisms and HR management processes, similar to those held or being considered for agents of Parliament. Our dedicated parliamentary function is also part of the PSC's proactive approach in seeking opportunities to engage Parliament and to reposition itself as a new organization with a new mandate.

The PSC has successfully integrated business and strategic planning, HR and information technology planning, resources management, and performance monitoring. The PSC will continue to internally reallocate resources to meet pressing needs and enhance the performance measurement strategy by finalizing indicators and targets. Incremental progress is being achieved in advancing a PSC corporate risk profile as part of the 2006-2007 planning cycle. The PSC will continue to look for opportunities to systematically integrate the various levels of risk analysis conducted within the organization.

Integrated resource management is critical for decision making - not only for setting direction, but also for making course corrections and resource reallocation as required. The implementation of an improved budgeting and resource allocation process following zero-based budgeting principles and approaches is key to ensuring transparent planning and reporting on results. The PSC is benchmarking its corporate services to better understand how the resources we use to deliver these services compare with those in similar organizations.

Managing information resources is as important as managing financial and human resources. The PSC will finalize its three-year strategy to achieve full compliance with Management of Government Information Policy and sound information management practices, including the gradual implementation of a Records and Document Information Management System (RDIMS).

Audited financial statements will now be included in the PSC's financial framework, as well as in the 2005-2006 Departmental Performance Report. The PSC has also developed an approach to implementing the new Treasury Board Secretariat (Office of the Comptroller General) policy for internal audit, with the specific goal of implementing the new policy early and adapted to meet our unique circumstances. We are also building a strong and effective evaluation function.

The PSC's HR plan reflects business needs and strong people management practices

The work of the PSC depends on the quality and dedication of its people. We continue to face strong challenges in finding and retaining talented staff to ensure the sustainability of our workforce so that we can meet our current and future needs. Therefore, it is essential that we remain strongly committed to our employees. By integrating HR planning into our operational planning process, we have established a foundation for assessing and understanding our current and future needs, and for mitigating the risks associated with an aging workforce, turnover, skill gaps, etc. We will continue to implement enhanced and rigorous integrated planning processes to help identify optimal strategies and initiatives related to recruitment, retention, learning, development, succession and employment equity.

In 2006-2007, the PSC will continue to focus on the following areas:

  • further integration of HR and operational planning to enhance decision-making and benefit from PSMA flexibilities;
  • investment in building our human resources and leadership capacity through training, recruitment, staffing and retention; and
  • placement of employees in transition.

Key Commitment: The PSC's management of resources is integrated and effective.


Expected Results & Performance Indicators Plans

Expected Result: The PSC's resource management is integrated, effective, consistently improved and aligned with departmental priorities.

Performance indicator 1: Regular and accurate year-end forecasts and variance reporting and reasonable history of carry-forwards and lapses.

Performance Indicator 2: Implementation of Management of Government Information (MGI) Policy based on revised information management capacity check.

Performance Indicator 3: Governance structure and level of resources in place to implement internal audit policy.

Performance Indicator 4: Expected results and performance indicators reviewed and updated.

Performance Indicator 5: Risk-based evaluation plan developed and actioned.

  • Implement zero-based budgeting process linked to Program Activity Architecture;
  • Establish rigorous procedures to review and challenge financial forecasts and plans through an integrated operational planning process;
  • Integrate the various levels of risk analysis conducted within the PSC;
  • Continue benchmarking our corporate services;
  • Prepare audited financial statements;
  • Begin a three-year information management strategy including

RDIMS implementation;

  • Implement TBS policy for internal audit

within the PSC;

  •  

Enhance the performance measurement strategy by finalizing indicators and targets; and

  • Continue building an effective PSC evaluation function.

Key Commitment: The PSC's HR plan reflects business needs and strong people management practices.


Expected Results & Performance Indicators Plans

Expected Result: The PSC has the necessary people, capacity and leadership to deliver results.

Performance Indicator 1: A well-developed and rigorous HR planning process integrated with business planning.

Performance indicator 2: A workforce that is representative, productive, sustainable and adaptable.

Performance Indicator 3: Delegation instruments, policies, procedures and accountability framework in place to support the implementation of the new PSEA.

  • Develop an action plan to address results of the 2005 Public Service Employee Survey;
  • Enhance our integrated HR and business planning;
  • Implement recruitment mechanisms programs and strategies to increase our resourcing capacity (e.g. pools);
  • Develop and implement the PSC learning and policy strategy;
  • Implement measures and developmental programs to support and enhance leadership capacity;
  • Continue implementing the Office of Conflict Management, including initiatives related to the Values and Ethics Code for the Public Service

; and

  • Finalize the implementation of PSEA and related policies, delegations and procedures.