Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

SECTION 2: Analyse of Program Activities by Strategic Outcome

2.1 Results-Based Measurement Methodology

The 2006-2007 Report on Plans and Priorities (RPP) and the Departmental Performance Report (DPR) are the second editions to be produced under the Management Resources and Results Structure (MRRS) Policy. The information presented in the following detailed analysis requires an update on the approach taken by the CSA in the implementation of results-based management. Information on the methodology used to measure expected results against performance indicators at each level of the Program Activity Architecture (PAA) is also provided.

Integration of the 3 "Rs" - Results-Responsibilities-Resources

The illustration below shows how each PAA level is managed by traceable results, responsibilities and resources information and according to a planning and performance measurement timetable.

3 Rs Integration Model at CSA


PAA Levels Results Responsibilities Resources
Strategic Outcomes
10 years
Strategic Results President / Executive Committee 10-year plan
Program Activities
>= 5 years
Final Results Executive Committee 10-year plan
Program Sub-Activities
>= 3 years
Intermediate Results Executive Committee Annual Reference Level Update (ARLU)
Program
Sub-Sub-Activities
3 years
Immediate Results Directors General Annual Reference Level Update (ARLU)
Program
Sub-Sub-Activities
1 year
Inputs-Outputs Managers Main Estimates

Performance Measurement Implementation Status

In 2006-2007, the major milestones in the implementation of the MRRS were:

  • A second consecutive year under a PAA management environment;
  • The development of a custom-made information management system automatically linking results, responsibilities, and resources, and its utilization, on a voluntary basis, by nine out of the CSA's thirteen sectors; and,
  • Upgrading of the indicator-records for all results presented in the 2006-2007 and 2007-2008 RPPs further to a performance measurement capacity assessment conducted after the 2005-2006 DPR.

The implementation of a results-based measurement regime is a work in progress requiring at least five full years for completion. The CSA has now completed its second year of implementation and has reached the following status:

CSA Strategic Outcomes: They remain the same as in 2006-2007. They have been revised and integrated in a single Strategic Outcome to be more in line with the CSA's mission. The revised Strategic Outcome will appear in the 2008-2009 RPP. During the revision process, socio-economic indicators were developed to measure CSA's Strategic Outcomes over a ten-year period, and they will also appear in the 2008-2009 RPP.

Program Activities: After a second year, it is still too early to report adequately against final results and performance indicators at the Program Activity level. The objectives and roadmaps set for each thrust of the Canadian Space Strategy, along with a ten-year financial plan, will require between three and five years to be measured and evaluated comprehensively. This year's DPR will only be able to provide either baseline information or a progress report made during the second year under a PAA management environment.

Program Sub-Activities: The Program Activities are broken down into sub-activities each carrying a specific objective. Intermediate results and performance indicators are still being developed and therefore should first appear in the 2008-2009 RPP.

Program Sub-Sub-Activities: Immediate results and performance indicators at the Sub-Sub Program Activity level were significantly improved over the past year. It is at this corner stone level of the PAA that the CSA can first link results (performance information), responsibilities (management accountability) and resources (financial information) and then proceed with the higher and lower levels. Since April 1, 2007 this link has been made automatically for nine of the CSA's thirteen sectors, using a custom-made information management system. This year, performance information is starting to provide valuable indications about programs performance over a three-year span. This information will be accessible electronically from now on using the link
http://www.space.gc.ca/asc/eng/resources/publications/default.asp.

Below Sub-Sub-Activities Level: At this level of the PAA, yearly program inputs and expected outputs are outlined in the CSA Sectors work plans. This level of information is very technical and therefore does not appear in the DPR.

How to Read Performance Information and Detailed Analysis

Program Activity: For this level, the information is reported against final results and performance indicators. The first Program Activity performance evaluation will take place in 2010. The five-year evaluation horizon corresponds with the approval of the Canadian Space Strategy by the Government of Canada in February 2005. This performance report provides either baseline information or a progress report made since the year 2005-2006.

Program Sub-Activity: For this level, intermediate results and performance indicators are still being developed and therefore will first appear in the 2008-2009 RPP.

Program Sub-Sub-Activity: For this level, the information is reported yearly against immediate results and performance indicators. A performance evaluation will take place in 2009. New this year, Program Sub-Sub-Activity level performance information is only accessible electronically at the following address, http://www.space.gc.ca/asc/eng/resources/publications/
default.asp
.

Performance Analysis: Every year a performance analysis is completed for each level of the PAA. This analysis provides contextual, complementary or methodological, as well as financial and human resources information.

Highlights of Main Accomplishments: For each Program Sub-Activity, examples of achievements are selected from the array of projects and activities carried out by the CSA and its industry, academic and government partners, as outlined in the corresponding Report on Plans and Priorities.


2.2 Space Based Earth Observation

Program Activity: Space Based Earth Observation (EO)

image

Priority: Develop and operationalize the use of Space Based Earth Observation for the benefit of Canadians.

Performance Status: 83% (15/18) of the targets were met in 2006-2007.

This performance report provides either baseline information or a progress report made since the year 2005-2006.

The first Program Activity performance evaluation will take place in 2010. The five-year evaluation horizon corresponds with the approval of the Canadian Space Strategy by the Government of Canada in February 2005.


Space Based Earth Observation

Program Activity Performance Measurement

Expected Result

Delivery, directly or in partnership, of Space Based EO data, products and services in response to operational and scientific user requirements in the field of Environment, Resource and Land Use Management, Security and Foreign Policy, supported by access capacity development.

Indicators Performance
1. Number of RADARSAT operational users and applications. Commercial users have utilized a total of 30,970 frames with 17 different domains of application; 10 Federal Government departments have used a total of 6,755 frames.

Alaska Satellite Facilities (ASF) have processed a total of 55,815 frames. National Oceanic and Atmospheric Administration (NOAA) and National Ice Center (NIC) are the ASF's largest clients.

2. Number of active missions supported directly or indirectly by Canada. A total of 7 active missions and 12 missions in development were supported directly or indirectly.
3. Growth in federal government departments and agency budgets allocated to the exploitation of Space Based EO data, derived information and services in the fields of the Environment, Resource and Land Use Management, Security and Foreign Policy. There were 10 federal government departments using RADARSAT EO data in 2006-2007, compared to only 5 the previous year.
4. Number of hits on the Canadian Geospatial Data Infrastructure (CGDI) related to CSA sponsored (directly and/or indirectly) scientific and operational missions. During fiscal year 2006-2007, the Discovery Portal of GeoConnexion received an average of 3,909 visitors per month requesting an average of 379,530 pages per month for an estimated yearly total of 47, 000 visitors and 4.6 million pages.


Performance Analysis

Indicator 1

RADARSAT data can be ordered through 4 different order desks. A total of 6,755 frames were processed at the Canadian government order desk located at CSA and the Canadian Ice Services located at Environment Canada.

The number of 10 departments does not take into account branches and divisions that are part of these departments (i.e. Canada Centre for Remote Sensing (CCRS), Canadian Forest Services (CFS), Geological Survey of Canada (GSC) are three branches of Natural Resources Canada). The largest government user of RADARSAT data is still the Canadian Ice Service of Environment Canada for ice monitoring activities. Environment Canada (EC), the Canadian Coast Guard (CCG), Transport Canada (TC), Department of National Defence (DND) and Fisheries and Oceans (DFO) are coordinating their efforts to implement ISTOP (Integrated Satellite Tracking of Polluters). By doing so, they have been more effective and have reduced their cost by sharing RADARSAT data acquired to monitor the targeted area. ISTOP became fully operational in 2006-2007. RADARSAT data are also used successfully for applications related to crop monitoring, ship detection, wetland mapping, ocean windfield mapping, oil spill, soil subsidence and soil movement monitoring, disaster monitoring and, especially, flood monitoring.

The Alaska Satellite Facilities (ASF), handling data requests from the U.S. Governments as part of the U.S. allocation of the RADARSAT Mission, processing a total of 55,815 frames during the 2006-2007 period. The main areas of application for the frames processed by ASF are for sea ice monitoring, 40%, wind speed determination, 10%, geological hazards, 25% and scientific research, 25%.

MacDonald Dettwiler and Associates (MDA) Geospatial Services Inc. (GSI) is responsible for the commercial sale of RADARSAT data. A total of 30,970 frames were sold by MDA for telemetry and commercial use through 5,283 orders in 2006-2007. Europe is the largest market, accounting for 41%, followed by Canada with 31 % and the U.S. with 12%. The Far East follows closely with 10%. Ship detection is the main application accounting for 32% of the frames, followed closely by applications related to the environment at 29%. Cartography at 10%, ice monitoring 9%, defence applications at 7%, and oil pollution at 5% are second in importance. These numbers do not include the frames ordered by Canadian government departments and agencies or processed at the Alaska Satellite facilities for the U.S. government.



Indicator 2

Missions

Status

Fields

Cloudsat (2006) In operation Environment
ERS-2 (2005) In operation Environment, Resource and Land Management
ESA- ENVISAT In operation Environment, Resource and Land Management
MOPPITT (1999) In operation Environment
OSIRIS (2001) In operation Environment
RADARSAT-1 (1995) In operation Environment, Resource and Land Management, Security and Foreign Policy
SCISAT (2003) In operation Environment
RADARSAT-2 (2007-2008) In development Environment, Resource and Land Management, Security and Foreign Policy
RSAT-Constellation (2012) In development Environment, Resource and Land Management, Security and Foreign Policy
PROBA-2 (2007) In development Environment
AQUARIUS (2009) In development Environment
CHINOOK (2010) In development Environment
SMOS (2008) In development Environment
SWARM (2010) In development Environment
ADM/AEOLUS (2009) In development Environment
EarthCARE (2013) In development Environment
CRYOSAT (2009) In development Environment
GOCE (2007) In development Environment
ESA SENTINEL -1 (2011) In development Environment, Resource and Land Management, Security and Foreign Policy


Indicator 3

An increasing number of departments are using RADARSAT data. The largest users are still the Canadian Ice Center of Environment Canada, Natural Resources Canada, Fisheries and Oceans, Agriculture and Agri-Food Canada, National Defence and the Canadian Space Agency. It is worth noting that 4 other departments were repeat users of RADARSAT data during the 2006-2007 period - Parks Canada, the National Research Council, the Canadian Nuclear Safety Commission and Public Safety and Emergency Preparedness Canada. Last year, a total of 5,703 processed image frames were provided to federal departments and agencies. This year, a total of 6,755 processed image frames were provided for them.

It has been impossible to establish an operational budget baseline for federal government departments and agencies as a whole. However, discussions are currently taking place among the government departments and agencies under the leadership of PWGSC, to consolidate the purchase of EO data for the government departments as a whole. If negotiations are successful, information on all EO data purchases, not just RADARSAT data, by Canadian government departments will be provided starting in 2008-2009.



Indicator 4

Data on the number of hits on the Canadian Geospatial Data Infrastructure (CGDI) related to CSA sponsored scientific and operational missions were not provided on time because of major changes to the GeoConnections Web last year and informatics' deficiencies. During the coming year, CSA will work with CGDI to review and develop a more reliable, accurate and measurable indicator. In the meantime, GeoConnections has been able to provide us with some monthly statistics from their Discovery Portal, which connects databases with CSA supported missions.



2006-2007 - Financial Resources ($ in millions)
Planned Total Authorities Actual Spending
124.0 112.0 66.4
2006-2007 - Human Resources (FTEs)
Planned Total Authorities Actual
76.2 Not applicable 70.1

Any significant variance reported against Planned Spending set out in the 2006-2007 Report on Plans and Priorities is explained in Section 1.6 - Spending by Program Activity.

For detailed performance information, go to: http://www.space.gc.ca/asc/eng/
resources/publications/default.asp

To learn more about Earth Observation, go to: http://www.space.gc.ca/asc/eng/
satellites/default.asp


2.3 Space Science and Exploration


Program Activity: Space Science and Exploration (SE)


image

Priority: Understand the solar system and the Universe, expand our knowledge of the constituent elements and origins of life, and strengthen a human presence in space.

Performance Status: 86% (24/28) of the targets were met in 2006-2007.

This performance report provides either baseline information or a progress report made since the year 2005-2006.

The first Program Activity performance evaluation will take place in 2010. The five-year evaluation horizon corresponds with the approval of the Canadian Space Strategy by the Government of Canada in February 2005.


Space Science and Exploration

Program Activity Performance Measurement

Expected Result

Increased participation in Canadian and international opportunities in order to expand the scientific knowledge base available to Canadian academia and R&D communities in:

  1. Astronomy, Space Exploration and Solar-Terrestrial Relation; and,
  2. Physical and Life Sciences.
Indicators Performance
1. Number of participations in Canadian and international space science missions. A total of 6 new missions in 2006-2007; 1 mission related to Astronomy (17%) and 5 to Physical and Life Sciences (83%).
2. Rate of successful missions (Total or partial successful Canadian missions/total missions with Canadian participation). This year, 9 of a total of 33 missions reached launched, data production or completed status for an impressive success rate of 27%.
3. Number of peer-reviewed papers over the next three years published in world-class scientific journals as a result of the CSA's participation in Canadian and international missions (papers featuring Canadian academia and/or R&D community). A total of 711 peer-reviewed papers, featuring Canadian academia and/or R&D community, were published in 2006-2007 in Space Astronomy and Exploration, Solar-Terrestrial Relation, and Physical and Life Sciences.


Performance Analysis

Indicator 1


Missions

Status

Fields

FUSE (1999) Objectives met/in operation Astronomy
ICE-First (2004) Objectives met/completed Life Science
MOST (2003) Objectives met/in operation Astronomy
WISE (2005) Objectives met/completed Life Sciences
MATROSHKA-R (2006) Objectives met/in operation Operational Space Medicine
BLAST (2007) Objectives met/completed Astronomy
THEMIS (2007) Launched in 2007. Solar-Terrestrial Relation
MVIS (2006-07) Ready to launch Physical Sciences
CCISS (2007) In operation Life Sciences
* ELERAD (2006) In operation Life Sciences
PMDIS/TRAC (2006) In operation Life Sciences
APXS (2009) In development Planetary Exploration
* BISE (2009) In development Life Sciences
* Cambium (2009) In development Life Sciences
CASSIOPE-ePOP (2008) In development Solar-Terrestrial Relation
CIMEX (2009) In development Physical Sciences
eOSTEO (2007) In development Life Sciences
EOEP/SWARM (2009) In development Solar-Terrestrial Relation
Hershel-HIFI/Spire (2008) In development Astronomy
ICAPS (2010) In development Physical Sciences
IVIDIL (2008) In development Physical Sciences
JWST-FGS (2013) In development Astronomy
PHOENIX (2007) In development Planetary Exploration
NEOSSAT (2009) In development Planetary Exploration
* NEQUISOL (2010) In development Physical Sciences
* Planck (2008) In development Astronomy
SCCO (2007) In development Physical Sciences
UVIT-ASTROSAT (2008) In development Astronomy
* Vascular (2009) In development Life Sciences
EVARM Under review Life Sciences
Insect Habitat Under review Life Sciences
MIMBU/ATEN Under review Solar-Terrestrial Relation
ORBITALS Under review Solar-Terrestrial Relation
(Year) = Actual or projected launch
* = New missions in 2006-2007


Performance Analysis

Indicator 2

For the purpose of this indicator, a mission is considered partly or totally successful when the status reads as: objective met, in operation, completed or launched. Analysis of the last three fiscal year, starting April 1, 2004 and ending on March 31, 2007, shows an overall mission success rate of 27% (9 out of 33) when all initiated missions are taken into account. Last year, this same method of calculation would have shown a mission success rate of 12% (3 out of 24). It is important to note however that all successful missions have met or are in the process of meeting their mission objectives.



Indicator 3

This year, 711 peer-reviewed papers, featuring Canadian academia and/or R&D community, were published in Space Astronomy and Exploration, Solar-Terrestrial Relation, and Physical and Life Sciences. A breakdown of the information by field: Space Astronomy (393), Planetary Exploration (17), Solar-Terrestrial Relation (161), Physical Sciences (57) and Life Sciences (83). The 2005-2006 DPR indicated 83 papers. The actual total should have read 482 papers. The difference is due to improved publication monitoring.



2006-2007 - Financial Resources ($ in millions)
Planned Total Authorities Actual Spending
133.2 149.6 130.0
2006-2007 - Human Resources (FTEs)
Planned Total Authorities Actual
191.9 Not applicable 175.4

Any significant variance reported against Planned Spending set out in the 2006-2007 Report on Plans and Priorities is explained in Section 1.6 - Spending by Program Activity.

For detailed performance information, go to: http://www.space.gc.ca/asc/eng/
resources/publications/default.asp

To learn more about Space Science and Exploration, go to: http://www.space.gc.ca/asc
/eng/sciences/default.asp
and, http://www.space.gc.ca/asc/eng/
exploration/default.asp


2.4 Satellite Communications


Program Activity: Satellite Communications (SC)


image

Priority: Provide all Canadians with the means to participate in and fully benefit from the global information age.

Performance Status: 78% (7/9) of the targets were met in 2006-2007.

This performance report provides either baseline information or a progress report made since the year 2005-2006.

The first Program Activity performance evaluation will take place in 2010. The five-year evaluation horizon corresponds with the approval of the Canadian Space Strategy by the Government of Canada in February 2005.


Satellite Communications

Program Activity Performance Measurement

Expected Result 1

Increased access for Canadians to state-of-the-art communications systems and services to meet their social and economic needs.

Indicators Performance
1. Gap between current capabilities and future needs of Canadians for satellite communications and available or expected system capacity. Baseline performance information will be available in the 2007-2008 DPR based on needs analysis currently taking place.
2. Percentage of coverage over Canada by satellite and ground systems in place for commercial and governmental usage. Near 100% coverage over Canada for commercial usage.

Demonstration and trial campaign for the provision of government service to northern and remote communities is progressing well and is expected to be completed in March 2008.

3. Utilization rate of Anik F2 Ka-band payload and in particular the service delivery utilizing the $50 million Government Ka-band capacity credit. Anik F2 now has 52,000 customer subscribers (basic service equivalents) in Canada in addition to the commercial services offered by Telesat to corporations.

The demonstration and trial campaign for the provision of government services to northern and remote communities using Government of Canada Capacity Credit are progressing well and are expected to be completed in March 2008.



Performance Analysis

Indicator 1

In 2007-2008, the CSA will undertake studies on communications satellite service needs and opportunities, from which baseline data will be drawn to measure the gap between current capabilities and future needs of Canada.



Indicator 2

The CSA has deployed hubs in Vancouver and Winnipeg to demonstrate Ka-band applications and services using Anik F2's four northern beams. In conjunction with the existing infrastructure, nine Ka-band terminals were obtained to demonstrate institutional services and applications in the Canadian North. This ongoing trial campaign, scheduled to be completed by March 2008, will yield a comprehensive assessment of Ka-band performance in the four northern beams. Initiatives to upgrade the reliability and quality of service of the existing proof-of-concept services are expected to be undertaken in 2007-2008.



Indicator 3

The number of modems installed to date is about 32,000 with a growing rate of 50-70 terminals per day. Based on Telesat's 4 tiers of service, this number translates into about 52,000 customer subscribers (also referred as basis service equivalents). The baseline performance of 52,000 subscribers for Anik F2 represents a commercial take-up rate higher than originally anticipated (the original take-up rate was estimated at 3,000 new basic service equivalents per month, which for the 11-month of service (May 2005 - March 2006) would equate to 33,000 basic service equivalents). Note that the maximum of 150,000 basic service equivalents available for Government use equates to a total of approximately 100 Mbps access for 11 years (ending in April 2015). Additional performance information on Anik F2 commercial take-up, such as number of communities served and type of applications and services used will be available once the operating upgrade by National Satellite Initiative (NSI) is up and running.

Through its support of Anik F2, the Government of Canada has secured a Government Capacity Credit access worth $50 million over 11 years starting in May 2005. Industry Canada has transferred this Capacity Credit to the National Satellite Initiative (NSI) to support the Government's connectivity agenda for remote and underserved northern rural communities. So far, the Government of Canada Capacity Credit (GoC CC) access for Anik F2 has only been used for validation testing and concept demonstration purposes, resulting in a low rate of utilization since May 2005. The CSA is investigating implementation solutions to meet these requirements in 2007-2008.



Expected Result 2

Better use of space communications, search and rescue, and global navigation satellite systems and applications to improve the efficiency and effectiveness of other government departments in delivering services to Canadians.

Indicators Performance
1. Number of joint studies and projects between the CSA and other government departments in the field of satellite communications, navigation and search and rescue. A second joint study was conducted in 2006-2007 on Global Navigation Satellite Systems (GNSS) opportunities specific to the transportation sector.


Performance Analysis

A first joint study, undertaken in 2005-2006 in cooperation with the Department of National Defence, Natural Resources Canada and Industry Canada, looked at the importance of GNSS technology to Canada and identified some of the country's strengths and opportunities. The analysis was based on the input of over 100 representatives from government, industry and academia.

A second joint study, undertaken in 2006-2007 in cooperation with Transport Canada, has shown that many sectors within the transportation sector can benefit greatly from GNSS services.

A review of the federal government GNSS governance model was recommended in both studies. To this end, CSA will consult with the other government departments involved in the two studies to organize a joint workshop to address this issue.



2006-2007 - Financial Resources ($ in millions)
Planned Total Authorities Actual Spending
32.3 29.9 29.3
2006-2007 - Human Resources (FTEs)
Planned Total Authorities Actual
11.0 Not applicable 10.2

Any significant variance reported against Planned Spending set out in the 2006-2007 Report on Plans and Priorities is explained in Section 1.6 - Spending by Program Activity.

For detailed performance information, go to: http://www.space.gc.ca/asc/eng/
resources/publications/default.asp

To learn more about Satellite Communications, go to: http://www.space.gc.ca/asc/eng/
satellites/default.asp


2.5 Generic Space Activities in Support of EO, SE AND SC


Program Activity: Generic Space Activities in Support of EO, SE AND SC (GSA)


image

Priority: Provide leadership, coordination or support to Earth Observation (EO), Space Science and Exploration (SE), and Satellite Communications (SC) Program Activities through generic technology research and space-qualification activities.

Performance Status: 86% (6/7) of the targets were met in 2006-2007.

This performance report provides either baseline information or a progress report made since the year 2005-2006.

The first Program Activity performance evaluation will take place in 2010. The five-year evaluation horizon corresponds with the approval of the Canadian Space Strategy by the Government of Canada in February 2005.


Generic Space Activities in Support of EO, SE AND SC

Program Activity Performance Measurement

Expected Result

Innovative space technologies, techniques, and design and test methodologies in response to advanced developments required for future space missions and activities.

Indicators Performance
1. Number of technologies supported through one of the generic R&D programs used in a space mission or activity. From the 31 projects that ended in 2006-2007, a total of 4 technologies were chosen for future space missions and 3 technologies were integrated into commercial products.
2. Number of space missions making use of the David Florida Laboratory (DFL). Six of the CSA's space missions were supported by DFL in 2006-2007.
3. Number of peer-reviewed papers as a result of CSA generic technology R&D programs. A total of 67 peer-reviewed papers, written by CSA's scientists and engineers, as a result of 2 CSA generic technology R&D programs.


Performance Analysis

Indicator 1

Harmonized performance measurement indicators for 2 Space Technology Programs - the Space Technology Research Program (STRP) and the Space Technology Development Program (STDP) - demonstrated that 1 technology was chosen out of 11 STRP projects for future space missions and that 3 technologies were chosen out of 20 STDP projects completed in 2006-2007 for future space missions; 3 technologies were integrated into commercial products for an impressive total of 23 % of new technology used.



Indicator 2

In addition to the 6 space missions, the David Florida Laboratory also supported 3 technology development projects - the International Space Station (ISS), CANDARM-1 and the Microsat
Bus - and 5 commercial projects.



Indicator 3

Harmonized performance measurement indicators for 2 Space Technology Programs - Space Technology Research Program (STRP) and Space Technology Development Program
(STDP) - demonstrated that the scientific research community does not use publications to share early findings with its peers in order to protect industrial secrecy and know-how.



2006-2007 - Financial Resources ($ in millions)
Planned Total Authorities Actual Spending
44.3 49.2 47.2
2006-2007 - Human Resources (FTEs)
Planned Total Authorities Actual
146.0 Not applicable 116.1

Any significant variance reported against Planned Spending set out in the 2005-2006 Report on Plans and Priorities is explained in Section 1.6 - Spending by Program Activity.

For detailed performance information, go to: http://www.space.gc.ca/asc/eng/
resources/publications/default.asp

To learn more about Generic Space Technology Supporting Earth Observation, Space Science and Exploration, and Satellite Communications, go to: http://www.space.gc.ca/asc/eng/
industry/technology.asp

To learn more about the David Florida Laboratory, go to: http://www.space.gc.ca/asc/eng/
dfl/default.asp


2.6 Space Awareness and Learning


Program Activity: Space Awareness and Learning (AL)


image

Priority: Further public understanding and engagement with regards to space-related issues, ultimately leading to improvement in the scientific literacy of Canadians.

Performance Status: 87% (14/16) of the targets were met in 2006-2007.

This performance report provides either baseline information or a progress report made since the year 2005-2006.

The first Program Activity performance evaluation will take place in 2010. The five-year evaluation horizon corresponds with the approval of the Canadian Space Strategy by the Government of Canada in February 2005.


Space Awareness and Learning

Program Activity Performance Measurement

Expected Result

Increase public awareness of Canada's activities in space and the space benefits that positively affect the quality of life of Canadians.

Indicators Performance
1. Awareness of Canadians measured by telephone survey every three years. Survey conducted in early 2005.

Results indicate that 46% of respondents are aware of the Canadian Space Agency as champion of space activities and that 19% of respondents have moderate knowledge of Canada's space activities. Next survey to be conducted in 2008-2009.



Performance Analysis

The survey was conducted with the general public to assess awareness, knowledge, and attitudes toward Canada's space program and related activities. The survey was administered by phone to 1,628 Canadian adult residents, on February 4 to 11, 2005. Based on a sample of this size, the overall results can be considered to be accurate within +/- 2.5%, 19 times out of 20.

Several results contribute to determining levels of awareness. Other then the two results cited above, the following could also be considered:

  • 47% identified Earth-related benefits that flow from Canada's space program;
  • 67% cited images when thinking about Canada's involvement in space;
  • 71% believed Canadians are proud of our activities in space, and that Canadian success in advanced space technologies contributes to our knowledge-based economy, innovation, and economic competitiveness; and,
  • 65% felt that our space activities inspire youth in science and engineering.

Some 80% of Canadians surveyed think it is important for Canada to continue to have a space program and be active in the development of advanced technologies and science related to space.

Respondents were asked to rate the importance of a number of benefits that result from investment in the Canadian Space Program. A strong majority viewed all potential benefits as important. Some 90% felt that monitoring the Earth for natural disasters is an important benefit, followed closely by monitoring our oceans, forests, wetlands and farmlands (88%), and new medical discoveries (87%). As well, significant numbers attributed importance to better telecommunications (83%) and leadership in robotics (81%). Benefits that also received strong responses included advancing humankind's knowledge (74%), enhancing Canada's international reputation (71%), and exploring the solar system (67%).



2006-2007 - Financial Resources ($ in millions)
Planned Total Authorities Actual Spending
5.9 5.2 4.1
2006-2007 - Human Resources (FTEs)
Planned Total Authorities Actual
25.4 Not applicable 21.6

Any significant variance reported against Planned Spending set out in the 2006-2007 Report on Plans and Priorities is explained in Section 1.6 - Spending by Program Activity.

For detailed performance information, go to: http://www.space.gc.ca/asc/eng/
resources/publications/default.asp

To learn more about Space Awareness and Learning, go to:
http://www.space.gc.ca/asc/eng/media/default.asp; and,
http://www.space.gc.ca/asc/eng/educators/default.asp


2.7 Corporate Services and Infrastructure


Program Activity: Corporate Services and Infrastructure


image

Priority: To implement the government's commitment to modern public service management in accordance with the Management Accountability Framework's (MAF) expectations.

Performance Status: 67% (8/12) of the targets met in 2006-2007.

This performance report provides either baseline information or a progress report made since the year 2005-2006.


Corporate Services and Infrastructure

Program Activity Performance Measurement

Expected Result

Corporate Services provide added value for CSA managers in the performance of their duties.

Indicators Performance
Services provided meet standards set under Government-wide and CSA policies as well as the expectations of the Management Accountability Framework. Ratings from the 2006 MAF assessments against the 18 indicators were:

Strong = 1
Acceptable = 10
Opportunity for improvement = 6
Attention required = 1

Compared to 2005, 7 indicator ratings (39%) have improved and 3 (17%) have declined.



Performance Analysis

Among the 18 criteria used in the assessment, the CSA showed a strong performance in Project Management and steady progress in Corporate Risk Management, with a rating rising from "opportunity for improvement" last year to "acceptable" in 2006. The CSA had varied results in the 3 areas identified as management priorities in the 2005:

Integration of human resources and business planning: A Draft Integrated Corporate HR Plan 2007-2010 was developed and will be approved in June 2007.

Development of a long-term investment plan: A Draft Integrated Long-term Investment Plan was developed and will be submitted for approval in 2007-2008.

Project management: The CSA demonstrated that it has implemented a sound project management capacity compliant with the Treasury Board project approval policy suite, which includes a project management governance structure and a risk management framework.

The Treasury Board has identified 3 management priorities for 2007:

Asset Management: The CSA must complete the Long Term Capital Plan.

Internal Audit Function: Although some key elements are in place, the CSA must develop and put in place an implementation plan for the new Policy on Internal Audit. The indicator rating is "Attention required".

Financial Management and Control: Although the CSA usually exhibits good performance, compliance with government policies should be monitored, specifically in the overall quality and timeliness of its external financial reporting information.

The Treasury Board assessment does not indicate management quality beyond MAF indicators.



Expected Result 2

Key corporate risks are addressed and mitigated.

Indicators Performance
Management and mitigation actions are implemented against the four highest priority risks identified in the CSA corporate risk profile. Planned management and mitigations actions were completed in response to 3 out of the 4 highest priority corporate risks.


Performance Analysis

1. All actions planned in the RPP 2006-2007 were completed in response to 2 of the 4 highest corporate priority risks, namely:

Workforce Competencies: Increase the capacity of CSA to maintain a qualified workforce of public servants to deliver CSA's mandate within the government's legislative frameworks, policies and rules.

As a result, 97% of managers had successfully completed the mandatory on-line assessment related to financial and human resources delegated authorities by December 31, 2006.

Function/Process Integration: Increase the capacity of CSA to align its strategies, planning priorities, funding levels, operations and capacity to deliver and obtain clear understanding and buy-in from managers and staff at all levels.

As a result, the new strategic outcome with a set of performance indicators will first appear in the 2008-2009 Report on Plans and Priorities; the CSA put in place a corporate information management system in response to Management of Resources and Results Structure policy requirements effective since April 1st, 2007; and drafted a Human Resources Strategic Plan to be submitted for approval by June 2007.

2. Some of the actions planned in the RPP 2006-2007 were completed in response to a third one, namely:

Values and Ethics: Increase the capacity of the CSA to instil public service values, to develop a working environment free of harassment and promote respect for individuals, integrity and honesty.

Since a new President had not been appointed, the CSA was not able to finalise and approve the governance structure and delegation of authority in order to improve its compliance with the Public Service values of respect, integrity, honesty and transparency. The revised governance structure will address the way other government departments and universities are to be approached. In the meantime, the current structure is in force.

3. No action planned in the RPP 2006-2007 was completed in response to the last corporate priority risk, namely:

Stakeholder Support: Increase the capacity of CSA to involve other government departments and universities in teaming up and creating a synergy in developing and implementing space activities for the benefit of Canadians.

The CSA was not able to put the engagement strategy with stakeholders in place as planned, or increase the frequency of advisory committee meetings.

Source: CSA's Corporate Risk Profile (internal document).



2006-2007 - Financial Resources ($ in millions)

Planned Total Authorities Actual Spending
34.5 38.9 37.5

2006-2007 - Human Resources (FTEs)

Planned Total Authorities Actual
239.0 Not applicable 215.6

Any significant variance reported against Planned Spending set out in the 2006-2007 Report on Plans and Priorities is explained in Section 1.6 - Spending by Program Activity.

For detailed performance information, go to: http://www.space.gc.ca/
asc/eng/resources/publications/default.asp

To learn more about Corporate Services and Infrastructure, go to:
http://www.space.gc.ca/asc/doc/maf_f.doc (The document is in French only.)