Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

Greening Government Operations (GGO)

Overview

The GGO supplementary table applies to departments and agencies bound by the Federal Sustainable Development Act, the Policy on Green Procurement, or the Policy Framework for Offsetting Greenhouse Gas Emissions from Major International Events.

For guidelines on how to complete the GGO supplementary table, please refer to the Public Works and Government Services Canada Publiservice site: http://publiservice.tpsgc-pwgsc.gc.ca/greening/text/strategie-strategy-e.html

Please note:

  • RPP refers to Reports on Plans and Priorities and represents planned / expected results.
  • DPR refers to Departmental Performance Reports and represents actual results.

More information on the Departmental Sustainable Development Strategy of Canadian Heritage is available on line at: http://www.pch.gc.ca/pc-ch/publctn/mindep-eng.cfm

Green Building Targets


8.1 As of April 1, 2012, and pursuant to departmental strategic frameworks, new construction and build-to-lease projects, and major renovation projects, will achieve an industry-recognized level of high environmental performance1.
Performance Measure RPP DPR
Target Status.  
Number of completed new construction, build-to-lease and major renovation projects in the given fiscal year, as per departmental strategic framework. 
(Optional in FY 2011-12)
N/A  
Number of completed new construction, build-to-lease and major renovation projects that have achieved an industry-recognized level of high environmental performance in the given fiscal year, as per departmental strategic framework.
(Optional in FY 2011-12)
N/A  
Existence of strategic framework. 
(Optional in RPP 2011-12)
No, expected completion date March 2012.  

Strategies / Comments

Canadian Heritage is not named as a Green Building department in the Federal Sustainable Development Strategy (FSDS). However, as of April 1, 2011, Canadian Heritage will directly operate two buildings of the Canadian Conservation Institute2. Therefore, Canadian Heritage commits to developing a strategy framework in fiscal year 2011-12 for the green building targets. This strategic framework will address all of the mandatory implementation strategies as listed for this target in the FSDS.



8.2 As of April 1, 2012, and pursuant to departmental strategic frameworks, existing crown buildings over 1000m2will be assessed for environmental performance using an industry-recognized assessment tool3.
Performance Measure RPP DPR
Target Status.  
Number of buildings over 1000m2, as per departmental strategic framework. (Optional in FY 2011-12) N/A  
Percentage of buildings over 1000m2 that have been assessed using an industry-recognized assessment tool, as per departmental strategic framework. (Optional in FY 2011-12) N/A  
Existence of strategic framework. (Optional in RPP 2011-12) No, expected completion date March 2012.  

Strategies / Comments

Canadian Heritage is not named as a Green Building department in the Federal Sustainable Development Strategy (FSDS). However, as of April 1, 2011, Canadian Heritage will directly operate two buildings of the Canadian Conservation Institute. Therefore, Canadian Heritage commits to developing a strategy framework in fiscal year 2011-12 for the green building targets. This strategic framework will address all of the mandatory implementation strategies as listed for this target in the FSDS.



8.3 As of April 1, 2012, and pursuant to departmental strategic frameworks, new lease or lease renewal projects over 1000m2, where the Crown is the major lessee, will be assessed for environmental performance using an industry-recognized assessment tool4.
Performance Measure RPP DPR
Target Status.  
Number of completed lease and lease renewal projects over 1000m2 in the given fiscal year, as per departmental strategic framework. 
(Optional in FY 2011-12)
N/A  
Number of completed lease and lease renewal projects over 1000m2 that were assessed using an industry-recognized assessment tool in the given fiscal year, as per departmental strategic framework. 
(Optional in FY 2011-12)
N/A  
Existence of strategic framework.
 (Optional in RPP 2011-12)
No, expected completion date March 2012.  

Strategies / Comments

Canadian Heritage is not named as a Green Building department in the Federal Sustainable Development Strategy (FSDS). However, as of April 1, 2011, Canadian Heritage will directly operate two buildings of the Canadian Conservation Institute. Therefore, Canadian Heritage commits to developing a strategy framework in fiscal year 2011-12 for the green building targets. This strategic framework will address all of the mandatory implementation strategies as listed for this target in the FSDS.



8.4 As of April 1, 2012, and pursuant to departmental strategic frameworks, fit-up and refit projects will achieve an industry-recognized level of high environmental performance5.
Performance Measure RPP DPR
Target Status.  
Number of completed fit-up and refit projects in the given fiscal year, as per departmental strategic framework. 
(Optional in FY 2011-12)
N/A  
Number of completed fit-up and refit projects that have achieved an industry-recognized level of high environmental performance in the given fiscal year, as per departmental strategic framework. 
(Optional in FY 2011-12)
N/A  
Existence of strategic framework. 
(Optional in RPP 2011-12)
No, expected completion date:  March 2012.  

Strategies / Comments

Canadian Heritage is not named as a Green Building department in the Federal Sustainable Development Strategy (FSDS). However, as of April 1, 2011, Canadian Heritage will directly operate two buildings of the Canadian Conservation Institute. Therefore, Canadian Heritage commits to developing a strategy framework in fiscal year 2011-12 for the green building targets. This strategic framework will address all of the mandatory implementation strategies as listed for this target in the FSDS.


Greenhouse Gas Emissions Target


8.5 The federal government will take action now to reduce levels of greenhouse gas emissions (GHG) from its operations to match the national target of 17% below 2005 by 2020.
Performance Measure RPP DPR
Target Status.  
Departmental GHG reduction target: Percentage of absolute reduction in GHG emissions by fiscal year 2020-21, relative to fiscal year 2005-06.    
Departmental GHG emissions in fiscal year 2005-06, in kilotonnes of CO2 equivalent.    
Departmental GHG emissions in the given fiscal year, in kilotonnes of CO2 equivalent. FY 2011-12    
FY 2012-13    
FY 2013-14    
FY 2014-15    
FY 2015-16    
FY 2016-17    
FY 2017-18    
FY 2018-19    
FY 2019-20    
FY 2020-21    
Percent change in departmental GHG emissions from fiscal year 2005-06 to the end of the given fiscal year. FY 2011-12    
FY 2012-13    
FY 2013-14    
FY 2014-15    
FY 2015-16    
FY 2016-17    
FY 2017-18    
FY 2018-19    
FY 2019-20    
FY 2020-21    

Strategies / Comments

Not applicable.  


Surplus Electronic and Electrical Equipment Target


8.6 By March 31, 2014, each department will reuse or recycle all surplus electronic and electrical equipment (EEE) in an environmentally sound and secure manner.
Performance Measure RPP DPR
Target Status.  
Existence of implementation plan for the disposal of all departmentally-generated EEE. 
(Optional in RPP 2011-12)
Yes  
Total number of departmental locations with EEE implementation plan fully implemented, expressed as an assessment of all locations, by the end of the given fiscal year. FY 2011-12 1/6  
FY 2012-13    
FY 2013-14    

Strategies / Comments

  • Definition of Location: Region
  • Number of Locations with Canadian Heritage:
    • Canadian Heritage operates in 6 Regions in Canada:
      1. Western Region (British Columbia, Alberta, Yukon);
      2. Prairies and Northern Region (Saskatchewan, Manitoba, North West Territories, Nunavut);
      3. Ontario Region;
      4. Québec Region;
      5. Atlantic Region;
      6. National Capital Region.
    • Approximately 80% of all Canadian Heritage employees are based in the National Capital Region.
  • Implementation Strategies:
    • In the National Capital Region, surplus EEE is centrally controlled by Contracting and Materiel Management Directorate (CMMD). Disposal takes place in accordance with the Treasury Board Secretariat’s Directive on Disposal of Surplus Materiel requirements and practices. 
    • An assessment of current regional practices and funding implications will be conducted to determine a process for rolling out the implementation plan to the regions. All regions will have fully implemented the EEE implementation plan by March 31, 2014.

Roles, Responsibilities and Key Activity Areas:

  • Responsibility Centre Managers are responsible for the management of assets. Once an asset is no longer required, they are responsible for identifying the asset as surplus and for informing the proper functional areas (e.g. CMMD, Facilities Management, Knowledge, Information and Technology Services (KITS), etc.).
  • CMMD manages the warehousing and storage functions associated with surplus EEE and oversees proper surplus EEE disposal, once the necessary verifications have been done by other potential stakeholders (e.g. KITS), using the appropriate disposal mechanism (Computers for Schools Program, Crown Assets Disposal, E-Waste Recycling DISO or Provincial Program, etc.).

Mechanisms to Evaluate Plan Effectiveness:

  • Canadian Heritage will rely on internal reports that will be generated through its Internal Financial Management System (SAP), as well as disposal records to evaluate the effectiveness of its EEE disposal activities.

Plans/Strategies for Intradepartmental Engagement:

  • The Federal Sustainable Development Strategy and the overall disposal strategies will be communicated to managers through the use of e-mail notifications.
  • Senior Managers will be made aware of the departmental position, action plan and practices.
  • Facilities Management and KITS will be involved in the disposal of surplus assets for which they have some responsibilities.

Printing Unit Reduction Target


8.7 By March 31, 2013, each department will achieve an 8:1 average ratio of office employees to printing units. Departments will apply target where building occupancy levels, security considerations, and space configuration allow.
Performance Measure RPP DPR
Target Status.  
Ratio of departmental office employees to printing units in fiscal year 2010-11, where building occupancy levels, security considerations and space configuration allow. (Optional) N/A   
Ratio of departmental office employees to printing units at the end of the given fiscal year, where building occupancy levels, security considerations and space configuration allow. FY 2011-12  N/A*  
FY 2012-13    
FY 2013-14    

Strategies / Comments

  • *In fiscal year 2011-12, Canadian Heritage will define what constitutes a printing unit (e.g., desktop printers, networked printers, multi-functional devices, etc.), additional scoping requirements (e.g., security considerations), methodology for tracking printing units (to develop an inventory of printing units) and methodology for defining office employees.
  • Criteria for exclusions will be determined and all requests for exclusions will be evaluated individually to determine validity.
  • Regional offices will be engaged and requested to share regional data.

Paper Consumption Target


8.8 By March 31, 2014, each department will reduce internal paper consumption per office employee by 20%. Each department will establish a baseline between 2005-06 and 2011-12, and applicable scope.
Performance Measure RPP DPR
Target Status.  
Number of sheets of internal office paper purchased per office employee in the baseline year selected, as per departmental scope.
 (Optional in RPP 2011-12)
 N/A  
Cumulative reduction (or increase) in paper consumption, expressed as a percentage, relative to baseline year selected. 
(Optional in RPP 2011-12)
FY 2011-12  N/A*  
FY 2012-13    
FY 2013-14    

Strategies / Comments

  • *In fiscal year 2011-12, Canadian Heritage will determine a baseline year for this target, scoping requirements, methodology for tracking paper purchases and methodology for defining office employees.
  • E-mail notifications will be developed to create awareness of employees regarding paper reduction practices. 
  • Employees will be encouraged, through e-mail notifications, to be creative in the use of alternative tools and work arrangements in order to support a reduction in the consummation of paper.

Green Meetings Target


8.9 By March 31, 2012, each department will adopt a guide for greening meetings.
Performance Measure RPP DPR
Target Status.  
Presence of a green meeting guide. 
(Optional in RPP 2011-12)
 No, will be developed by March 31, 2012.  

Strategies / Comments

  • Green Meeting Guide developed, implemented along with a change in organizational culture (facilitated through training, education, communication and policy direction) that embraces green meetings. Change should be marked by a reduction in our carbon footprint and environmental impact, a reduction in departmental travel expenditures, an improvement in employee work/life balance and productivity.
  • Some specific intended results are:
    • a reduction in departmental paper consumption;
    • a reduction in departmental travel expenditures;
    • an increase in the number of and usage of corporate tele- and video-conferencing facilities;
    • percentage of meetings held using the Green Meeting Guide as their planning foundation.

Green Procurement Targets

8.10 As of April 1, 2011, each department will establish at least 3 SMART green procurement targets to reduce environmental impacts

8.10.1 By March 31, 2014, 80% of furniture purchases will be through PWGSC Green Standing Offers.
Performance Measure RPP DPR
Target Status.  
Percentage of furniture purchased through PWGSC green standing offers, relative to all furniture purchases in the given fiscal year. N/A  
Progress against measure in the given fiscal year. N/A*  

Strategies / Comments

  • Canadian Heritage has ensured that this target meets SMART criteria, including:
    • Specific: This target applies to a specific percentage of departmental furniture purchases.
    • Measurable: The source of purchase, in comparison to the total volume of purchases will be used to determine success rate. Information to track this progress against this target is / will be available from the SAP system.
    • Achievable: Consolidation of requirements and information sharing to increase awareness will be used to guide the department in meeting its target.
    • Relevant: Furniture is among the top spend categories for the department.
    • Time bound: Target must be complete by March 31, 2014.
  • Implementation Strategy:
    • * In fiscal year 2011-12, Canadian Heritage will develop an implementation plan, roles and responsibilities, etc., to ensure achievement of this target.


8.10.2 By March 31, 2014, 80% of IT Hardware purchases will have at least one environmental attribute (e.g., energy star).
Performance Measure RPP DPR
Target Status.  
Percentage of IT hardware purchases that have at least one environmental attribute, relative to all IT hardware purchases in the given fiscal year. N/A  
Progress against measure in the given fiscal year. N/A*  

Strategies / Comments

  • Canadian Heritage has ensured that this target meets SMART criteria, including:
    • Specific: This target applies to a specific percentage of departmental IT hardware purchases.
    • Measurable: The source of purchase and product specifications will be used to determine the success rate. Information to track this progress against this target is available from the SAP system.
    • Achievable: Consolidation of requirements and information sharing to increase awareness will be used to guide the department in meeting its target.
    • Relevant: IT hardware is among the top spend categories for the department.
    • Time bound: Target must be complete by March 31, 2014.
  • Implementation Strategy:
    • * In fiscal year 2011-12, Canadian Heritage will develop an implementation plan, roles and responsibilities, etc., to ensure achievement of this target.


8.10.3 As of April 1, 2011, Canadian Heritage will ensure that 90% of paper purchases have a minimum of 30% recycled content.
Performance Measure RPP DPR
Target Status.  
Percentage of paper purchased through the green standing offer and printing contracts, relative to all paper purchased in the given fiscal year. N/A  
Progress against measure in the given fiscal year. N/A*  

Strategies / Comments

  • Canadian Heritage has ensured that this target meets SMART criteria, including:
    • Specific: This target applies to a specific percentage of departmental paper purchases.
    • Measurable: The source of purchase, in comparison to the total volume of purchases will be used to determine success rate. Information to track this progress against this target is available from the SAP system.
    • Achievable: Consolidation of requirements and information sharing to increase awareness will be used to guide the Department in meeting its target.
    • Relevant: This target presents an opportunity for Canadian Heritage to procure available greener alternatives to virgin paper.
    • Time bound: Target is ongoing and will be reported against in each year of the FSDS.
  • Implementation Strategy:
    • * In fiscal year 2011-12, Canadian Heritage will develop an implementation plan, roles and responsibilities, etc., to ensure achievement of this target.

8.11 As of April 1, 2011, each department will establish SMART targets for training, employee performance evaluations, and management processes and controls, as they pertain to procurement decision-making.

8.11.1 Training for select employees: By March 31, 2014, 90% of materiel managers and procurement personnel will have taken a recognized training course on green procurement offered by the Canada School of Public Service and 90% of new acquisition cardholders will have been trained on green procurement practices through departmental training.
Performance Measure RPP DPR
Target Status.  

Number of materiel managers and procurement personnel who have completed training relative to the total number of materiel managers and procurement personnel.

Number of new acquisition cardholders who have completed training relative to the total number of new acquisition cardholders.

N/A

N/A

 
Progress against measure in the given fiscal year. N/A*  

Strategies / Comments

  • Canadian Heritage has ensured that this target meets SMART criteria, including:
    • Specific: This target applies to a designated percentage of materiel managers and procurement personnel. There are 18 such positions within the Department. New acquisition cardholders (cannot be estimated) will also be targeted.
    • Measurable: The number of materiel managers, procurement personnel and acquisition cardholders that have Green Procurement training. Information to track this progress against this target is available through Individual Learning Plans, Human Resources and Workplace Management reports and listings of new card issuances and related training.
    • Achievable: Trainings will be included in the annual training plans.
    • Relevant: Materiel managers and procurement personnel generally handle departmental procurements over $10,000.
    • Time bound: Target must be complete by March 31, 2014.
  • Implementation Strategy:
    • * In fiscal year 2011-12, Canadian Heritage will develop an implementation plan, roles and responsibilities, etc., to ensure achievement of this target.


8.11.2 Employee performance evaluations for managers and functional heads of procurement and materiel management: By March 31, 2012, all identified managers and functional heads will have environmental consideration clauses incorporated into their performance evaluations.
Performance Measure RPP DPR
Target Status.  
Number of performance evaluations of identified managers and functional heads that have included environmental consideration clauses relative to the total of number of identified managers and functional heads N/A  
Progress against measure in the given fiscal year. N/A*  

Strategies / Comments

  • Canadian Heritage has ensured that this target meets SMART criteria, including:
    • Specific: This target applies to 1 designated Manager and 3 Functional Heads of procurement and materiel management.
    • Measurable: This applies to individuals in the targeted positions.
    • Achievable: Performance agreements will include Green Procurement provisions.
    • Relevant: Procurement functional specialists report to these managers and functional heads.
    • Time bound: Targets are established for a specific period (one fiscal year).
  • Implementation Strategy:
    • * In fiscal year 2011-12, Canadian Heritage will develop an implementation plan, roles and responsibilities, etc., to ensure achievement of this target.


8.11.3 Management processes and controls: By March 31, 2014, a minimum of 3 designated procurement and materiel management processes and controls will include environmental performance considerations.
Performance Measure RPP DPR
Target Status.  
Number of designated procurement and materiel management processes and controls that include environmental performance considerations, relative to all designated procurement and materiel management processes and controls. N/A  
Progress against measure in the given fiscal year. N/A*  

Strategies / Comments

  • Canadian Heritage has ensured that this target meets SMART criteria, including:
    • Specific: Target refers to a specific number of identified management processes and controls. 
    • Measurable: Canadian Heritage will be addressing one management process and control within fiscal year 2011-12.
    • Achievable: The mandate will be modified accordingly.
    • Relevant: Priority will be given to processes and controls that affect procurement in excess of $10,000.
    • Time bound: Target must be complete by March 31, 2014.
  • Implementation Strategies
    • * In fiscal year 2011-12, Canadian Heritage will determine all designated procurement and materiel management processes and controls that will include environmental considerations.
    • In fiscal year 2011-12, Canadian Heritage will develop an implementation plan, roles and responsibilities, etc., to ensure achievement of this target.

Reporting on the Purchases of Offset Credits


Mandatory reporting on the purchase of greenhouse gas emissions offset credits, as per the Policy Framework for Offsetting Greenhouse Gas Emissions from Major International Events, should be reported here.
Performance Measure RPP DPR
Quantity of emissions offset in the given fiscal year. (Optional for all RPPs)    

Strategies / Comments

Not applicable.  


Green Procurement Reporting For Departments and Agencies Not Bound by the Federal Sustainable Development Act


Mandatory reporting on meeting the requirements of Section 7 of the Policy on Green Procurement, as applicable to departments and agencies bound by the Policy on Green Procurement but not the Federal Sustainable Development Act, should be reported here6.
Performance Measure RPP DPR
Policy Implementation Status. (Optional)  

Strategies / Comments

Not applicable.


Voluntary Reporting on Any Other Greening Government Operations Initiative


 
Performance Measure RPP DPR
Target Status. (Optional)  
[Enter Performance Measure (Using baseline data if available)].    
Progress against measure in the given fiscal year.    

Strategies / Comments

Not applicable.  



 
Performance Measure RPP DPR
Target Status. (Optional)  
[Enter Performance Measure (Using baseline data if available)].    
Progress against measure in the given fiscal year.    

Strategies / Comments

Not applicable.



[ENTER TARGET OR INITIATIVE]
Performance Measure RPP DPR
Target Status. (Optional)  
[Enter Performance Measure (Using baseline data if available)].    
Progress against measure in the given fiscal year.    

Strategies / Comments

Not applicable.  



Notes:

  • 1. This would be demonstrated by achieving LEED NC Silver, Green Globes Design 3 Globes, or equivalent.

  • 2. The Canadian Conservation Institute (CCI) is a Special Operating Agency and a Branch of the Department of Canadian Heritage. CCI is the custodian of the properties at 1729-1731 St-Laurent Boulevard (a warehouse) and 1030 Innes Road (Laboratory and Office facility), Ottawa, Ontario. The building on Innes Road is leased on a Triple Net Lease and CCI is totally responsible for all operations, maintenance and repairs of the entire building envelop and systems. Until March 31, 2011, Public Works and Government Services Canada (PWGSC) is the service provider. From April 1, 2011, CCI will operate the building directly.

    Only GGO Green Building Goal 8.3 applies to the CCI building on Innes Road which is a special purpose space, leased by the Crown, with a triple net lease that expires in April 2015. CCI will operate directly the building operation and its maintenance. The process to renew the lease will start in 2011. CCI will develop a Strategic Sustainable Development Framework by April 2012, using the template being developed by PWGSC and will include all the necessary assessment. The assessment tools will include BOMA BESt (Building Environmental Standards), an appropriately tailored BOMA International Green Lease Standard, or equivalent (for more information, see: http://www.bomabest.com/). The framework will be updated in each reporting cycle.

    GGO Green Buildings Goals 8.1, 8.2 and 8.4 do not apply to CCI for the following reasons: 
      8.1: CCI does not have a new building and is not in a situation of "build to lease".
      8.2: CCI is not in a Crown owned building.
      8.4: CCI does not plan any fit-up or refit project up to 2012.

  • 3. Assessment tools include: BOMA BESt, Green Globes or equivalent.

  • 4. Assessment tools include: BOMA BESt, an appropriately tailored BOMA International Green Lease Standard, or equivalent.

  • 5. This would be demonstrated by achieving LEED CI Silver, Green Globes Fit-Up 3 Globes, or equivalent.

  • 6. Alternatively, departments and agencies bound by the Policy on Green Procurement but not the Federal Sustainable Development Act (FSDA) can follow the approach required of FSDA departments for green procurement by setting and reporting on green procurement targets as specified in the "Green Procurement Targets" section in the above table.